Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,729 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Presolicitation

Replacement TAO Wind Monitors for the National Data Buoy Center at Stennis Space Center, MS

142082-27-0006

National Oceanic and Atmospheric Administration, Department of Commerce NOAA. Other Measuring and Controlling Device Manufacturing.

Offers due

December 4, 2026 at 1:00 PM EST

9 days from now. Posted November 18, 2026.

Get an email when this is amended, when the deadline moves and when it is awarded.Watch it

Next from this buyer

Similar, open now

All 48 open in other measuring and controlling device manufacturing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Nothing is submitted yet. The solicitation normally follows under the same number. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 334519 (other measuring and controlling device manufacturing), means no more than 600 employees, counted with affiliates. What a set-aside is
What comes next
No solicitation has been published under this number yet. The presolicitation of November 18, 2026 is the earliest notice of the purchase.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

The National Oceanic and Atmospheric Administration’s (NOAA) Acquisition and Grants Office, Eastern Acquisition Division-Kansas City intends to negotiate and award a purchase order, on a sole source basis, under authority of RFO FAR 6.103-1, with RM Young Company for Replacement TAO Wind Monitors (P/N 05103-1) to be delivered to National Data Buoy Center at Stennis Space Center, MS.

The sole source determination is based on NOAA’s only one source is capable rationale.  The RM Young propeller wind monitors technology uses magnetic induction for measuring wind speed which requires no energy input. Essentially you get the wind speed for free with respect to power requirements. Further, the directional portion of the sensor only requires 0.6 mW of power. That is 100 times less power requirement than an ultrasonic anemometer. This low power wind measurement is imperative in a battery-operated remote buoy station. The propeller anemometer also provides for the measurement of wind gusts over 100 m/s where no ultrasonic anemometer technology can currently measure in that range. The NDBC helped develop the R.M. Young propeller anemometer which is now considered the industry standard. No other propeller anemometer available has the reliability of the R.M. Young propeller anemometer. Hence, the R.M. Young model 05103-1 anemometer was selected as the anemometer for the TAO refresh system in 2010 and the TAP Recapitalization effort in 2023. The NDBC now has a complete TAO network populated with these 015103-1 wind monitors and this procurement replaces those units lost at sea, damaged beyond repair, or have reached their end of life during fiscal years 2025 and 2026.

The RM Young 05103-1 is provided with the cable and connector required to match current TAO cabling. The 05103-1 also provides a pulse output for wind speed as a result of the magnetic induction technique for the measurement. The selection of another manufacturer’s wind sensors could result in $100K of engineering efforts to rework the hardware and firmware of the TAO system and the NDBC wind tunnel testing equipment to accept different connections and output formats. Further, due to TAOs climate study the new sensor would need to be tested side-by-side the RM Young 05103-1 for a year to develop the transition equation to ensure there are no step or abrupt changes in the general wind speed and direction trends. This year long side-by-side testing could cost more than $100k as it would require a co-located buoy at several locations.

This pre-solicitation notice is not a request for competitive proposals and no solicitation package is available. However, firms that believe they can fully meet the government’s requirements may submit substantiating documentation or a request for additional information in writing to Abigail Green at Abigail.green@noaa.gov within 15 days after publication of this pre-solicitation notice. Such requests and documentation will be evaluated solely for the purpose of determining whether or not to conduct this procurement on a competitive basis. A determination by the government not to conduct a competitive procurement, based upon responses to this notice, is solely within the discretion of the government. Oral communications are not acceptable in response to this pre-solicitation notice.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. November 18, 2026

    Presolicitation

    Due December 4, 2026 at 1:00 PM EST. SAM.gov, notice b333f8efd74c4ea7b7d93bf6e00bf1ea

    1 revision on SAM
    • November 18, 2026: publish, presolicitation

Points of contact