Presolicitation
Sole Source VectorNav Units
142082-26-0153
National Oceanic and Atmospheric Administration, Department of Commerce NOAA. Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing.
Response deadline
March 6, 2026 at 5:00 PM EST
Closed 264 days ago. Posted February 19, 2026. Scheduled to archive March 21, 2026.
Get the next one like this from National Oceanic and Atmospheric Administration by email, the day it is posted.Find my opportunities
This one closed in 2026
100 like it are open now in search, detection, navigation, guidance, aeronautical, and nautical system and instrument manufacturing
- SOLE SOURCE: NORTEK USA Aquadopp Current Sensors for the NWS National Data Buoy Center
National Oceanic and Atmospheric Administration, Department of Commerce NOAA
PresolicitationNAICS 334511Ship to MS142082-27-0001Closes in 13 daysDec 8 - PCM330E Encoder Procurement
Department of the Air Force, FA9422 Afnwc/Ndk Afnwc/Ndkk
PresolicitationNAICS 334511Ship to Kirtland AFB, NMFA942227C0003Due tomorrowNov 26 - AREA MONITOR
Defense Logistics Agency, DLA Maritime - Puget Sound
SolicitationNAICS 334511Ship to Bremerton, WASPMYM227Q0218Due tomorrowNov 26
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 334511 (search, detection, navigation, guidance, aeronautical, and nautical system and instrument manufacturing), means no more than 1,350 employees, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the presolicitation of February 19, 2026. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The National Oceanic and Atmospheric Administration’s (NOAA) Acquisition and Grants Office, Eastern Acquisition Division-Kansas City intends to negotiate and award a purchase order, on a sole source basis, under authority of RFO FAR 6.103-1, with VectorNav Technologies for VN-100T-CR Wave Sensors to be delivered/performed at Stennis Space Center, MS. The sole source determination is based on NOAA’s compatibility to existing systems or equipment.
Sole Source Justification:
NDBC conducted market research to find a suitable replacement that would fit the current configurations on their observation stations. Ultimately it was narrowed to three products. Tests at NDBC showed the
VectorNav VN100T-CR outperformed the other two products in those tests. NDBC intends to replace all of the old 3DM-GX1 systems with the VectorNav sensor.
The VectorNav VN100T-CR is a miniature, high-performance Inertial Measurement Unit (IMU) and Attitude Heading Reference System (AHRS). It combines 3-axis accelerometers, gyros, and magnetometers into one device. The sensor interfaces to NDBC equipment to process the sensor measurements into wave products. In prior years, the NDBC learned that Lord Microstrain was planning to cease production of the 3DM-GX1 sensor which is the NDBC’s present operational sensor. Since that time, the NDBC has modified its wave system interface firmware to read the VN100T-CR input data stream and performed initial lab and field tests to confirm proper operation. Now the NDBC has mounted the sensor in place of the older obsolete part inside the operational tube. These sensors being purchased will be used to modify operational tubes to use the new VN100T-CR sensor. If the VN100T-CR product is not procured, the NDBC will reach a point where it cannot meet its requirement for wave observations due to lack of functioning sensors. Should another brand be procured, the NDBC would have to modify mounting and interface firmware, thus incurring more costs. Tests already completed for the VN100T-CR would have to be re-conducted. This includes field testing. These tests are required to confirm proper operation and quality of the measurements. Thus, the cost to the government would greatly increase and wave observations at some stations may not be possible until the required testing could be completed.
This pre-solicitation notice is not a request for competitive proposals and no solicitation package is available. However, firms that believe they can fully meet the government's requirements may submit substantiating documentation or a request for additional information in writing to the (Contract Specialist) within 15 days after publication of this pre-solicitation notice. Such requests and documentation will be evaluated solely for the purpose of determining whether or not to conduct this procurement on a competitive basis. A determination by the government not to conduct a competitive procurement, based upon responses to this notice, is solely within the discretion of the government. Oral communications are not acceptable in response to this pre-solicitation notice.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 19, 2026
Presolicitation
Due March 6, 2026 at 5:00 PM EST. SAM.gov, notice c7aa21f7d76f483081778894d0c304a9
1 revision on SAM
- February 19, 2026: publish, presolicitation
Points of contact
- Tyran Claypooltyran.claypool@noaa.gov