Glen Canyon Powerplant and Lake Powell Switchyard
140R4026R0015
Bureau of Reclamation, Upper Colorado Regional Office. Power and Communication Line and Related Structures Construction.
Response deadline
May 1, 2026 at 7:00 PM EDT
Closed 209 days ago. Posted March 31, 2026. Scheduled to archive May 16, 2026.
Get the next one like this from Bureau of Reclamation by email, the day it is posted.Find my opportunities
This one closed in 2026
7 like it are open now in power and communication line and related structures construction
- FCI Marion - Emergency Repair Tornado Damage
Federal Prison System / Bureau of Prisons, Fao
Combined synopsis and solicitationSmall businessNAICS 237130Marion, IL15BBNF26Q40900001Due in 7 daysDec 3 - N6247327R0006 Project Labor Agreement Request for Information
Department of the Navy, Navfacsyscom Southwest
PresolicitationNAICS 237130San Diego, CAN6247327R0006Due in 7 daysDec 3 - DLA DWCF B1907 Backup Power Generator, Yokosuka, Japan
Department of the Army, W2SN Endist Japan
Sources soughtNAICS 237130Outside the USW912HV27Z0002Closes in 15 daysDec 11
All 7 open in power and communication line and related structures construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237130 (power and communication line and related structures construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of March 31, 2026. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Bureau of Reclamation – Upper Colorado Region
Glen Canyon Powerplant and Lake Powell Switchyard
NOTICE TYPE: Sources Sought (Market Research)
NAICS: 237130 – Power and Communication Line and Related Structures Construction
PSC: Y1MD Construction of Electrical Installations and Power Plants
1. NOTICE DESCRIPTION
This Sources Sought announcement is issued solely for market research and planning purposes in accordance with FAR Part 10.
This is NOT a solicitation, request for proposal, bid, or quote.
No contract will be awarded from this notice. No reimbursement will be provided for costs associated with responding.
Information received will be used to enhance acquisition planning for a future competitive requirement under FAR Parts 15 and 36.
2. PROJECT LOCATION
Glen Canyon Powerplant and Lake Powell Switchyard
Glen Canyon Dam
Coconino County, Arizona (approx. 2 miles northwest of Page, AZ)
3. PROJECT OVERVIEW
The Bureau of Reclamation anticipates a construction requirement to furnish and install three (3) outdoor, three-phase station service transformers and perform associated electrical, protection, and structural work.
4. PRINCIPAL COMPONENTS OF WORK
A. Transformer Removal and Replacement
Removal and disposal of two (2) existing station service transformers.
Furnishing, installing, and commissioning three (3) new transformers:
Two (2) transformers:
• 3phase outdoor stepdown
• 3.75/4.687 MVA (KxAN/KxAF), 55°C rise
• 60 Hz
• High side: 13.8 kV, 150 kV BIL
• Low side: 4.16 kV, 75 kV BIL
• 6.5% impedance on 3.75 MVA
• Tap changer: ±2.5%, 5%
• Insulating fluid: Natural ester
One (1) transformer:
• 3phase outdoor stepdown
• 3.75/4.687 MVA (KxAN/KxAF), 55°C rise
• 60 Hz
• High side: 25 kV, 150 kV BIL
• Low side: 4.16 kV, 75 kV BIL
• 6.5% impedance on 3.75 MVA
• Tap changer: ±2.5%, 5%
• Insulating fluid: Natural ester
B. Additional Electrical & Structural Modifications
• Install new neutral grounding resistors.
• Remove/replace nonsegregated bus on lowside of two transformers.
• Modify highside isolatedphase bus.
• Furnish and install one (1) interrupter switch.
• Remove two (2) existing transformer protection relays; install three (3) new relays.
• Install six (6) current transformers.
• Remove existing concrete containment; install three (3) new containment systems.
• Remove/install 5 kV cable through powerplant.
• Remove/install approx. 2,000 LF of 25 kV armored cable via tunnel and underground conduit.
• Install three (3) singlepole fused disconnect switches.
• Remove and replace three (3) surge arresters.
5. ESTIMATED MAGNITUDE OF CONSTRUCTION
Between $10,000,000 and $25,000,000
6. ANTICIPATED PERIOD OF PERFORMANCE
• Period of Performance: TBD
• Anticipated Contract Award: 2nd Quarter FY 2027
7. SUBMISSION REQUIREMENTS
Interested and capable firms are requested to submit the following:
Company Information
• Name, physical address, UEI, points of contact, phone, and email.
Business Size & SBA Program Status under NAICS 237130 and 335311
• Indicate Small Business, HUBZone, 8(a), SDVOSB, WOSB, SDB, or Large Business.
• SBA certification must be verifiable in SAM.gov.
Capabilities Statement
• Demonstrate relevant experience and capability to perform all required work.
Transformer Manufacturer Information
• Manufacturer name and country of origin.
• Documentation supporting compliance with FAR 52.2255 (Trade Agreements) and/or 52.22511 (Buy American – Construction Materials).
Estimated Transformer Lead Time
• Assume NTP = January 25, 2027 for market research purposes.
Market Conditions & Economic Price Adjustment Input
• Brief statement on anticipated supply chain volatility and whether an EPA clause is advisable.
Transformer Pricing Indices Used
• Identify indices commonly applied for transformers with these characteristics.
Bonding Capacity
• Provide aggregate and single project bonding limits.
8. RESPONSE DELIVERY
Email responses only to:
Lisa Laughbon
Contracting Officer
Email: lisa_laughbon@ios.doi.gov
Response Deadline: COB 5/1/2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 31, 2026
Sources sought
Due May 1, 2026 at 7:00 PM EDT. SAM.gov, notice 1e0e535d26ff42f6b0ea2359cecfeaf7
1 revision on SAM
- March 31, 2026: publish, sources sought
Points of contact
- Laughbon, Lisallaughbon@usbr.gov8015243732