{"canonical":"https://sealedbidder.com/opportunities/140r2025r0004","key":"140R2025R0004","url":"https://sealedbidder.com/opportunities/140r2025r0004","title":"Z--This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.","solicitation_number":"140R2025R0004","notice_type":"a","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-02-22T01:00:00Z","first_posted":"2024-12-19","last_posted":"2025-04-21","department":"INTERIOR, DEPARTMENT OF THE","subagency":"BUREAU OF RECLAMATION","office":"MP-REGIONAL OFFICE","naics":"237990","psc":"Z1KA","set_aside":"SBA","place_state":"CA","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"06067","place_county_name":"Sacramento County","place_city":"0624638","place_city_name":"Folsom","winner":"SUULUTAAQ, INC.","award_amount":"5005410","publications":[{"notice_id":"61d1b42eff11434383f7ab028a8dfd5c","title":"Z--Folsom Right Wing Dam - North Fork Ditch Bypass","solicitation_number":"140R2025R0004","notice_type":"p","base_type":"p","posted":"2024-12-19","posted_at":null,"due_at":"2025-01-04T01:00:00Z","due_date":"2025-01-03","cancelled":null,"archived":null,"archive_date":"2025-01-03","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/61d1b42eff11434383f7ab028a8dfd5c/view","enriched":false,"history":[]},{"notice_id":"ad6ff13b5f624e2098fa6a79b9c974e8","title":"Z--Folsom Right Wing Dam - North Fork Ditch Bypass","solicitation_number":"140R2025R0004","notice_type":"p","base_type":"p","posted":"2024-12-19","posted_at":null,"due_at":"2025-01-04T01:00:00Z","due_date":"2025-01-03","cancelled":null,"archived":null,"archive_date":"2025-01-03","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/ad6ff13b5f624e2098fa6a79b9c974e8/view","enriched":false,"history":[]},{"notice_id":"5a7c2023dade4187b49ede84d2ad9b3f","title":"Folsom Right Wing Dam Ditch Bypass Modifications","solicitation_number":"140R2025R0004","notice_type":"o","base_type":"p","posted":"2025-01-13","posted_at":"2025-01-13T19:41:03.288Z","due_at":"2025-02-13T01:00:00Z","due_date":"2025-02-12","cancelled":false,"archived":true,"archive_date":"2025-02-27","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5a7c2023dade4187b49ede84d2ad9b3f/view","enriched":true,"history":[{"index":7,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-13T20:01:38.913Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"46772e93aad040c6940cc4b4cfd1bf51","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":5,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T16:05:12.603Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e49337dede85412d95d963951abc154e","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":4,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-07T17:05:37.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dcf3df1b445245c1bdc3e3f4c69a95f0","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":3,"title":"Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T19:41:03.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","solicitation_number":"140R2025R0004","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":2,"title":"Z--Folsom Right Wing Dam - North Fork Ditch Bypass","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-20T00:14:48.673Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8","solicitation_number":"140R2025R0004","parent_opportunity_id":"61d1b42eff11434383f7ab028a8dfd5c"}]},{"notice_id":"dcf3df1b445245c1bdc3e3f4c69a95f0","title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","solicitation_number":"140R2025R0004","notice_type":"o","base_type":"o","posted":"2025-02-07","posted_at":"2025-02-07T17:05:37.288Z","due_at":"2025-02-20T01:00:00Z","due_date":"2025-02-19","cancelled":false,"archived":true,"archive_date":"2025-03-06","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/dcf3df1b445245c1bdc3e3f4c69a95f0/view","enriched":true,"history":[{"index":7,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-13T20:01:38.913Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"46772e93aad040c6940cc4b4cfd1bf51","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":5,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T16:05:12.603Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e49337dede85412d95d963951abc154e","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":4,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-07T17:05:37.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dcf3df1b445245c1bdc3e3f4c69a95f0","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":3,"title":"Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T19:41:03.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","solicitation_number":"140R2025R0004","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":2,"title":"Z--Folsom Right Wing Dam - North Fork Ditch Bypass","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-20T00:14:48.673Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8","solicitation_number":"140R2025R0004","parent_opportunity_id":"61d1b42eff11434383f7ab028a8dfd5c"}]},{"notice_id":"e49337dede85412d95d963951abc154e","title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","solicitation_number":"140R2025R0004","notice_type":"o","base_type":"o","posted":"2025-02-11","posted_at":"2025-02-11T16:05:12.603Z","due_at":"2025-02-20T01:00:00Z","due_date":"2025-02-19","cancelled":false,"archived":true,"archive_date":"2025-03-06","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e49337dede85412d95d963951abc154e/view","enriched":true,"history":[{"index":7,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-13T20:01:38.913Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"46772e93aad040c6940cc4b4cfd1bf51","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":5,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T16:05:12.603Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e49337dede85412d95d963951abc154e","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":4,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-07T17:05:37.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dcf3df1b445245c1bdc3e3f4c69a95f0","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":3,"title":"Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T19:41:03.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","solicitation_number":"140R2025R0004","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":2,"title":"Z--Folsom Right Wing Dam - North Fork Ditch Bypass","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-20T00:14:48.673Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8","solicitation_number":"140R2025R0004","parent_opportunity_id":"61d1b42eff11434383f7ab028a8dfd5c"}]},{"notice_id":"46772e93aad040c6940cc4b4cfd1bf51","title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","solicitation_number":"140R2025R0004","notice_type":"o","base_type":"o","posted":"2025-02-13","posted_at":"2025-02-13T20:01:38.913Z","due_at":"2025-02-22T01:00:00Z","due_date":"2025-02-21","cancelled":false,"archived":true,"archive_date":"2025-03-08","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/46772e93aad040c6940cc4b4cfd1bf51/view","enriched":true,"history":[{"index":10,"title":"Z--This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-21T18:49:30.488Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"a7d511d34b4b4f659708dbe262695661","solicitation_number":"140R2025R0004","related_opportunity_id":"46772e93aad040c6940cc4b4cfd1bf51"},{"index":7,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-13T20:01:38.913Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"46772e93aad040c6940cc4b4cfd1bf51","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":5,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T16:05:12.603Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e49337dede85412d95d963951abc154e","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":4,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-07T17:05:37.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dcf3df1b445245c1bdc3e3f4c69a95f0","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":3,"title":"Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T19:41:03.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","solicitation_number":"140R2025R0004","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":2,"title":"Z--Folsom Right Wing Dam - North Fork Ditch Bypass","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-20T00:14:48.673Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8","solicitation_number":"140R2025R0004","parent_opportunity_id":"61d1b42eff11434383f7ab028a8dfd5c"}]},{"notice_id":"a7d511d34b4b4f659708dbe262695661","title":"Z--This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.","solicitation_number":"140R2025R0004","notice_type":"a","base_type":"o","posted":"2025-04-21","posted_at":"2025-04-21T18:49:30.488Z","due_at":null,"due_date":null,"cancelled":false,"archived":true,"archive_date":"2025-05-06","removed_at":null,"award_number":"140R2025C0005","awardee_name":"SUULUTAAQ, INC.","amount":"5005410","link_sam":"https://sam.gov/workspace/contract/opp/a7d511d34b4b4f659708dbe262695661/view","enriched":true,"history":[{"index":5,"title":"Z--This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-21T18:49:30.488Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"a7d511d34b4b4f659708dbe262695661","solicitation_number":"140R2025R0004","related_opportunity_id":"46772e93aad040c6940cc4b4cfd1bf51"},{"index":2,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-13T20:01:38.913Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"46772e93aad040c6940cc4b4cfd1bf51","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"}]}],"latest_notice_id":"a7d511d34b4b4f659708dbe262695661","first_type":"p","notices":[{"dates":{"posted":"2024-12-19","response_deadline":{"raw":"2025-01-03T17:00:00-08:00","utc":"2025-01-04T01:00:00Z","date":"2025-01-03","time":"17:00:00","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/61d1b42eff11434383f7ab028a8dfd5c/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Z--Folsom Right Wing Dam - North Fork Ditch Bypass","agency":{"office":{"code":"140R20","name":"MP-REGIONAL OFFICE"},"subtier":{"code":"1425","name":"BUREAU OF RECLAMATION"},"department":{"code":"014","name":"INTERIOR, DEPARTMENT OF THE"},"office_address":{"zip":"95825","city":"SACRAMENTO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-01-03","archive_type":"auto_custom"},"contacts":[{"fax":"916-978-5175","name":"Gamo, Ronald","role":"primary","email":"rgamo@usbr.gov","phone":"916-978-4304"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"61d1b42eff11434383f7ab028a8dfd5c","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"58d6782a6dcc49a46018e9c248f35a7b00e547a8fbe93da8bd0c4016d9f9ddf7","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"140R2025R0004","product_service_code":"Z1KA"},{"dates":{"posted":"2024-12-19","response_deadline":{"raw":"2025-01-03T17:00:00-08:00","utc":"2025-01-04T01:00:00Z","date":"2025-01-03","time":"17:00:00","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/ad6ff13b5f624e2098fa6a79b9c974e8/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Z--Folsom Right Wing Dam - North Fork Ditch Bypass","agency":{"office":{"code":"140R20","name":"MP-REGIONAL OFFICE"},"subtier":{"code":"1425","name":"BUREAU OF RECLAMATION"},"department":{"code":"014","name":"INTERIOR, DEPARTMENT OF THE"},"office_address":{"zip":"95825","city":"SACRAMENTO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-01-03","archive_type":"auto_custom"},"contacts":[{"fax":"916-978-5175","name":"Gamo, Ronald","role":"primary","email":"rgamo@usbr.gov","phone":"916-978-4304"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"ad6ff13b5f624e2098fa6a79b9c974e8","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"f92f6779c7f091bd1d57353f9ca7cf9ee5e7e9477bd2361084227e33b998d90f","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"The purpose of this amendment is to correct the name of the attachment of the solicitation to 140R2025R0004.","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"140R2025R0004","product_service_code":"Z1KA"},{"dates":{"posted":"2025-01-13","posted_at":"2025-01-13T19:41:03.288Z","created_at":"2025-01-13T19:40:54.195Z","modified_at":"2025-03-09T04:55:43.730Z","response_deadline":{"raw":"2025-02-12T17:00:00-08:00","utc":"2025-02-13T01:00:00Z","date":"2025-02-12","time":"17:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5a7c2023dade4187b49ede84d2ad9b3f/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Folsom Right Wing Dam Ditch Bypass Modifications","agency":{"office":{"code":"140R20","name":"MP-REGIONAL OFFICE"},"subtier":{"code":"1425","name":"BUREAU OF RECLAMATION"},"department":{"code":"014","name":"INTERIOR, DEPARTMENT OF THE"},"office_address":{"zip":"95825","city":"SACRAMENTO","state":"CA","country":"USA"},"organization_id":"100185781","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-02-27","archive_type":"auto15"},"history":[{"index":7,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-13T20:01:38.913Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"46772e93aad040c6940cc4b4cfd1bf51","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":5,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T16:05:12.603Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e49337dede85412d95d963951abc154e","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":4,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-07T17:05:37.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dcf3df1b445245c1bdc3e3f4c69a95f0","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":3,"title":"Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T19:41:03.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","solicitation_number":"140R2025R0004","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":2,"title":"Z--Folsom Right Wing Dam - North Fork Ditch Bypass","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-20T00:14:48.673Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8","solicitation_number":"140R2025R0004","parent_opportunity_id":"61d1b42eff11434383f7ab028a8dfd5c"}],"contacts":[{"fax":"916-978-5175","name":"Gamo, Ronald","role":"primary","email":"rgamo@usbr.gov","phone":"916-978-4304"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"5a7c2023dade4187b49ede84d2ad9b3f","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"5a7c2023dade4187b49ede84d2ad9b3f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-25T04:21:42.023479366Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"251be7c296194f958ef5f4efe14a24ca56b8ae011012fa811741ca7e10bc5319","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-25T04:21:42.023479366Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.","text":"This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"140R2025R0004","product_service_code":"Z1KA"},{"award":{},"dates":{"posted":"2025-02-07","posted_at":"2025-02-07T17:05:37.288Z","created_at":"2025-02-07T17:04:35.267Z","modified_at":"2025-03-09T04:55:43.730Z","response_deadline":{"raw":"2025-02-19T17:00:00-08:00","utc":"2025-02-20T01:00:00Z","date":"2025-02-19","time":"17:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/dcf3df1b445245c1bdc3e3f4c69a95f0/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","agency":{"office":{"code":"140R20","name":"MP-REGIONAL OFFICE"},"subtier":{"code":"1425","name":"BUREAU OF RECLAMATION"},"department":{"code":"014","name":"INTERIOR, DEPARTMENT OF THE"},"office_address":{"zip":"95825","city":"SACRAMENTO","state":"CA","country":"USA"},"organization_id":"100185781","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-03-06","archive_type":"auto15"},"history":[{"index":7,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-13T20:01:38.913Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"46772e93aad040c6940cc4b4cfd1bf51","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":5,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T16:05:12.603Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e49337dede85412d95d963951abc154e","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":4,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-07T17:05:37.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dcf3df1b445245c1bdc3e3f4c69a95f0","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":3,"title":"Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T19:41:03.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","solicitation_number":"140R2025R0004","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":2,"title":"Z--Folsom Right Wing Dam - North Fork Ditch Bypass","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-20T00:14:48.673Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8","solicitation_number":"140R2025R0004","parent_opportunity_id":"61d1b42eff11434383f7ab028a8dfd5c"}],"contacts":[{"fax":"916-978-5175","name":"Gamo, Ronald","role":"primary","email":"rgamo@usbr.gov","phone":"916-978-4304"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"dcf3df1b445245c1bdc3e3f4c69a95f0","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"5a7c2023dade4187b49ede84d2ad9b3f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-23T02:38:29.327194843Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"5088c300e8a277d2d81467233dda8921ec9d739ef7ff207433ac7a4258068ef7","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-23T02:38:29.327194843Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.","text":"This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"140R2025R0004","product_service_code":"Z1KA"},{"award":{},"dates":{"posted":"2025-02-11","posted_at":"2025-02-11T16:05:12.603Z","created_at":"2025-02-11T16:05:02.858Z","modified_at":"2025-03-09T04:55:43.730Z","response_deadline":{"raw":"2025-02-19T17:00:00-08:00","utc":"2025-02-20T01:00:00Z","date":"2025-02-19","time":"17:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e49337dede85412d95d963951abc154e/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","agency":{"office":{"code":"140R20","name":"MP-REGIONAL OFFICE"},"subtier":{"code":"1425","name":"BUREAU OF RECLAMATION"},"department":{"code":"014","name":"INTERIOR, DEPARTMENT OF THE"},"office_address":{"zip":"95825","city":"SACRAMENTO","state":"CA","country":"USA"},"organization_id":"100185781","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-03-06","archive_type":"auto15"},"history":[{"index":7,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-13T20:01:38.913Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"46772e93aad040c6940cc4b4cfd1bf51","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":5,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T16:05:12.603Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e49337dede85412d95d963951abc154e","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":4,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-07T17:05:37.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dcf3df1b445245c1bdc3e3f4c69a95f0","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":3,"title":"Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T19:41:03.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","solicitation_number":"140R2025R0004","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":2,"title":"Z--Folsom Right Wing Dam - North Fork Ditch Bypass","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-20T00:14:48.673Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8","solicitation_number":"140R2025R0004","parent_opportunity_id":"61d1b42eff11434383f7ab028a8dfd5c"}],"contacts":[{"fax":"916-978-5175","name":"Gamo, Ronald","role":"primary","email":"rgamo@usbr.gov","phone":"916-978-4304"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"e49337dede85412d95d963951abc154e","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"5a7c2023dade4187b49ede84d2ad9b3f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-23T00:34:04.466726387Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"8c9999173b40a074ada7a57b7d0df1dd391c9f74b6efb1896573b9fe1c69d56b","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-23T00:34:04.466726387Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.","text":"This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"140R2025R0004","product_service_code":"Z1KA"},{"award":{},"dates":{"posted":"2025-02-13","posted_at":"2025-02-13T20:01:38.913Z","created_at":"2025-02-13T20:01:07.947Z","modified_at":"2025-03-09T04:55:43.730Z","response_deadline":{"raw":"2025-02-21T17:00:00-08:00","utc":"2025-02-22T01:00:00Z","date":"2025-02-21","time":"17:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/46772e93aad040c6940cc4b4cfd1bf51/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","agency":{"office":{"code":"140R20","name":"MP-REGIONAL OFFICE"},"subtier":{"code":"1425","name":"BUREAU OF RECLAMATION"},"department":{"code":"014","name":"INTERIOR, DEPARTMENT OF THE"},"office_address":{"zip":"95825","city":"SACRAMENTO","state":"CA","country":"USA"},"organization_id":"100185781","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-03-08","archive_type":"auto15"},"history":[{"index":10,"title":"Z--This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-21T18:49:30.488Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"a7d511d34b4b4f659708dbe262695661","solicitation_number":"140R2025R0004","related_opportunity_id":"46772e93aad040c6940cc4b4cfd1bf51"},{"index":7,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-13T20:01:38.913Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"46772e93aad040c6940cc4b4cfd1bf51","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":5,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T16:05:12.603Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e49337dede85412d95d963951abc154e","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":4,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-07T17:05:37.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dcf3df1b445245c1bdc3e3f4c69a95f0","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":3,"title":"Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T19:41:03.288Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","solicitation_number":"140R2025R0004","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"},{"index":2,"title":"Z--Folsom Right Wing Dam - North Fork Ditch Bypass","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-20T00:14:48.673Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8","solicitation_number":"140R2025R0004","parent_opportunity_id":"61d1b42eff11434383f7ab028a8dfd5c"}],"contacts":[{"fax":"916-978-5175","name":"Gamo, Ronald","role":"primary","email":"rgamo@usbr.gov","phone":"916-978-4304"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"46772e93aad040c6940cc4b4cfd1bf51","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"5a7c2023dade4187b49ede84d2ad9b3f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-22T10:14:22.293410904Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"1401b68320bd3ccb180bb36a2f21bf516f63864edeb85afeff75258665ca5cca","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-22T10:14:22.293410904Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.","text":"This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"140R2025R0004","product_service_code":"Z1KA"},{"award":{"date":"2025-04-21","amount":"5005410","number":"140R2025C0005","awardee":{"raw":"SUULUTAAQ, INC. 110 RAILROAD AVE STE A Suisun City CA 94585 USA","uei":"C9RAA5KDBKC5","cage":"6E9D1","name":"SUULUTAAQ, INC.","location":{"zip":"94585","city":{"code":"75630","name":"Suisun City"},"state":{"code":"CA","name":"California"},"street":"110 RAILROAD AVE STE A","country":{"code":"USA","name":"UNITED STATES"}}}},"dates":{"posted":"2025-04-21","posted_at":"2025-04-21T18:49:30.488Z","award_date":"2025-04-21","created_at":"2025-04-21T18:49:29.835Z","modified_at":"2025-05-07T03:55:45.824Z"},"links":{"sam":"https://sam.gov/workspace/contract/opp/a7d511d34b4b4f659708dbe262695661/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Z--This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.","agency":{"office":{"code":"140R20","name":"MP-REGIONAL OFFICE"},"subtier":{"code":"1425","name":"BUREAU OF RECLAMATION"},"department":{"code":"014","name":"INTERIOR, DEPARTMENT OF THE"},"office_address":{"zip":"95825","city":"SACRAMENTO","state":"CA","country":"USA"},"organization_id":"100185781","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-05-06","archive_type":"auto15"},"history":[{"index":5,"title":"Z--This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-21T18:49:30.488Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"a7d511d34b4b4f659708dbe262695661","solicitation_number":"140R2025R0004","related_opportunity_id":"46772e93aad040c6940cc4b4cfd1bf51"},{"index":2,"title":"Z--Folsom Right Wing Dam Ditch Bypass Modifications","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-13T20:01:38.913Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"46772e93aad040c6940cc4b4cfd1bf51","solicitation_number":"140R2025R0004","parent_opportunity_id":"5a7c2023dade4187b49ede84d2ad9b3f","related_opportunity_id":"ad6ff13b5f624e2098fa6a79b9c974e8"}],"contacts":[{"fax":"916-978-5175","name":"Davis, Brenda","role":"primary","email":"brendadavis@usbr.gov","phone":"9169785141"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"a7d511d34b4b4f659708dbe262695661","lineage_id":"5a7c2023dade4187b49ede84d2ad9b3f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-17T04:13:58.837224332Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"4117e8ac353603dcea8593d257f9ccbce3514d24d177ea45f00f855364275361","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-17T04:13:58.837224332Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.","text":"This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.","origin":"detail"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"140R2025R0004","product_service_code":"Z1KA"}],"due_at":"2025-02-22T01:00:00Z","due_date":"2025-02-21","closes_at":"2025-02-22T01:00:00Z","awardable":false,"dept_key":"d-014","dept_name":"INTERIOR, DEPARTMENT OF THE","sub_key":"s-1425","sub_name":"BUREAU OF RECLAMATION","office_key":"o-140R20","office_name":"MP-REGIONAL OFFICE","state":"CA","county":"06067","county_name":"Sacramento County","city":"0624638","city_name":"Folsom","country":null,"state_source":null,"state_evidence":null,"site_key":null,"winner_key":"C9RAA5KDBKC5","amount":"5005410","linked_awards":7,"cancelled":false,"archived":true,"updated_at":"2026-11-17T04:42:47.571825Z","principal_notice_id":"a7d511d34b4b4f659708dbe262695661","description":{"text":"This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.","html":"This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.","origin":"detail"},"contacts":[{"fax":"916-978-5175","name":"Davis, Brenda","role":"primary","email":"brendadavis@usbr.gov","phone":"9169785141"}],"place_of_performance":null,"office_address":{"zip":"95825","city":"SACRAMENTO","state":"CA","country":"USA"},"naics_codes":["237990"],"award":{"date":"2025-04-21","amount":"5005410","number":"140R2025C0005","awardee":{"raw":"SUULUTAAQ, INC. 110 RAILROAD AVE STE A Suisun City CA 94585 USA","uei":"C9RAA5KDBKC5","cage":"6E9D1","name":"SUULUTAAQ, INC.","location":{"zip":"94585","city":{"code":"75630","name":"Suisun City"},"state":{"code":"CA","name":"California"},"street":"110 RAILROAD AVE STE A","country":{"code":"USA","name":"UNITED STATES"}}}},"attachments":[{"resource_id":"ef3aa5a587c14938acfaea46244288f5","name":"C05_04__Attachment_8_-_Offeror_Responsibility_Information.pdf","kind":"file","mime_type":".pdf","size_bytes":226459,"posted_at":"2025-01-13T19:41:03.288Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ef3aa5a587c14938acfaea46244288f5/download","mirrored":false},{"resource_id":"31ff9792578543b79c2aa14b95742fc9","name":"C05_04__Attachment_7_-_Past_Performance_Data_Form.pdf","kind":"file","mime_type":".pdf","size_bytes":615609,"posted_at":"2025-01-13T19:41:03.288Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/31ff9792578543b79c2aa14b95742fc9/download","mirrored":false},{"resource_id":"1dae9a8b91cd40828e767a8c2552786d","name":"Construction_Contract_Administration.docx","kind":"file","mime_type":".docx","size_bytes":12880,"posted_at":"2025-01-13T19:41:03.288Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1dae9a8b91cd40828e767a8c2552786d/download","mirrored":false},{"resource_id":"7368f1b665b743a3afab0ce4e20ff80f","name":"C05_04__Attachment_9_-_Electronic_Proposal_Submission_Instructions_Kiteworks.pdf","kind":"file","mime_type":".pdf","size_bytes":328315,"posted_at":"2025-01-13T19:41:03.288Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7368f1b665b743a3afab0ce4e20ff80f/download","mirrored":false},{"resource_id":"6e0b996ca3224de0bd29682f5b846e3a","name":"C05_04__Attachment_4_-_Release_of_Claims.pdf","kind":"file","mime_type":".pdf","size_bytes":430313,"posted_at":"2025-01-13T19:41:03.288Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6e0b996ca3224de0bd29682f5b846e3a/download","mirrored":false},{"resource_id":"5a5c839b5e92413bb0bb63b03bdeb545","name":"C05_04__Attachment_6_-_Past_Performance_Questionnaire.pdf","kind":"file","mime_type":".pdf","size_bytes":713025,"posted_at":"2025-01-13T19:41:03.288Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5a5c839b5e92413bb0bb63b03bdeb545/download","mirrored":false},{"resource_id":"f299073f866f47e2902eb76e62398480","name":"C05_04_140R2025R0004_Solicitation_-_Folsom_RWD.pdf","kind":"file","mime_type":".pdf","size_bytes":1801888,"posted_at":"2025-01-13T19:41:03.288Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f299073f866f47e2902eb76e62398480/download","mirrored":false},{"resource_id":"bf551110ca89473489b9299d04cceb2a","name":"C05_04__Attachment_5_-_General_Decision_No__CA20250007.pdf","kind":"file","mime_type":".pdf","size_bytes":255203,"posted_at":"2025-01-13T19:41:03.288Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bf551110ca89473489b9299d04cceb2a/download","mirrored":false},{"resource_id":"b9126f273d434a2da4abcef0ffb2169a","name":"Sol_140R2025R0004.pdf","kind":"file","mime_type":".pdf","size_bytes":100603,"posted_at":"2025-01-13T19:41:03.288Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b9126f273d434a2da4abcef0ffb2169a/download","mirrored":false},{"resource_id":"ce0adda6125b4244ac264b5c21467766","name":"Attachment_13_-_In_Person_Site_Visit_Agenda_0001.pdf","kind":"file","mime_type":".pdf","size_bytes":165937,"posted_at":"2025-02-07T17:05:37.288Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ce0adda6125b4244ac264b5c21467766/download","mirrored":false},{"resource_id":"71117015eb9c4ec0b2d6323c7c39a19a","name":"Attachment_10_-_Virtual_Site_Visit_Attendance_23JAN25_0001.pdf","kind":"file","mime_type":".pdf","size_bytes":47202,"posted_at":"2025-02-07T17:05:37.288Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/71117015eb9c4ec0b2d6323c7c39a19a/download","mirrored":false},{"resource_id":"49e779f69a8f4700bcb3e2557cc9308e","name":"Attachment_12_-_In_Person_Site_Visit_Sign_in_Sheet_0001.pdf","kind":"file","mime_type":".pdf","size_bytes":119318,"posted_at":"2025-02-07T17:05:37.288Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/49e779f69a8f4700bcb3e2557cc9308e/download","mirrored":false},{"resource_id":"0dd94c7a6eab4aaa8d1e6b6fcca3a3d6","name":"Amendment_0001_to_140R2025R0004_0001.pdf","kind":"file","mime_type":".pdf","size_bytes":189585,"posted_at":"2025-02-07T17:05:37.288Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0dd94c7a6eab4aaa8d1e6b6fcca3a3d6/download","mirrored":false},{"resource_id":"25594b20a56445559f1c7e04ac9b0725","name":"Attachment_11_-_Virtual_Presentation_Slides_0001.pptx","kind":"file","mime_type":".pptx","size_bytes":24514065,"posted_at":"2025-02-07T17:05:37.288Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/25594b20a56445559f1c7e04ac9b0725/download","mirrored":false},{"resource_id":"494dcc61a9674ea89c6ea8c2d91506aa","name":"Sol_140R2025R0004_Amd_0001.pdf","kind":"file","mime_type":".pdf","size_bytes":89117,"posted_at":"2025-02-07T17:05:37.288Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/494dcc61a9674ea89c6ea8c2d91506aa/download","mirrored":false},{"resource_id":"9d403535bab04b56b30705b0c2b12a26","name":"Amendment_0002_to_Solicitation_140R2025R0004_0002.pdf","kind":"file","mime_type":".pdf","size_bytes":8155934,"posted_at":"2025-02-11T16:05:12.603Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9d403535bab04b56b30705b0c2b12a26/download","mirrored":false},{"resource_id":"3aca2d314563466389270badd287066b","name":"Sol_140R2025R0004_Amd_0002.pdf","kind":"file","mime_type":".pdf","size_bytes":93372,"posted_at":"2025-02-11T16:05:12.603Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3aca2d314563466389270badd287066b/download","mirrored":false},{"resource_id":"fd36864467554c80b669bb67692a8b52","name":"Amendment_0003_to_140R2025R0004_0003.pdf","kind":"file","mime_type":".pdf","size_bytes":127818,"posted_at":"2025-02-13T20:01:38.913Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fd36864467554c80b669bb67692a8b52/download","mirrored":false},{"resource_id":"7a2fa950f175436a855b2da38300c9a9","name":"Sol_140R2025R0004_Amd_0003.pdf","kind":"file","mime_type":".pdf","size_bytes":88921,"posted_at":"2025-02-13T20:01:38.913Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7a2fa950f175436a855b2da38300c9a9/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_140R2025C0005_1425_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_140R2025C0005_1425_-NONE-_-NONE-/","piid":"140R2025C0005","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"C9RAA5KDBKC5","recipient_name":"SUULUTAAQ, INC.","recipient_uei":"C9RAA5KDBKC5","recipient_cage":"6E9D1","recipient_city":"SUISUN CITY","recipient_state":"CA","sub_name":"Bureau of Reclamation","office_name":"MP-REGIONAL OFFICE","office_key":"o-140R20","first_action_date":"2025-04-21","last_action_date":"2026-10-20","actions":3,"obligated":"5005410.00","current_total_value":"5005410.00","potential_total_value":"5005410.00","naics":"237990","psc":"Z1KA","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SMALL BUSINESS SET ASIDE - TOTAL","offers_received":2,"description":"THIS REQUIREMENT INVOLVES REMOVING EXISTING CONDUIT REMOVING CONCRETE HEADWALL, ADDING A SEEPAGE STABILITY BERM, AND INSTALLING TOE DRAIN INSPECTION WELLS.","method":"piid","confidence":"high","evidence":["award number 140R2025C0005 equals the contract number","same awarding office 140R20"],"opportunity_key":null,"opportunity_title":null}],"related":[],"similar_open":[{"key":"140FF027R0003","latest_notice_id":"88b31d0386cc489680a8118477836ff9","title":"FWS - Pixley NWR Water Recirculation Design-Build","solicitation_number":"140FF027R0003","notice_type":"k","first_type":"k","first_posted":"2026-10-30","last_posted":"2026-10-30","notices":1,"due_at":"2026-11-30T17:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-014","dept_name":"INTERIOR, DEPARTMENT OF THE","sub_key":"s-1406","sub_name":"DEPARTMENTAL OFFICES","office_key":"o-140FF0","office_name":"FWS CONTRACTING ACTIVITY","naics":"237990","psc":"Y1JZ","set_aside":"SBA","state":"CA","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"description","state_evidence":"NATIONAL WILDLIFE REFUGE 10811 CORCORAN ROAD DELANO, CA 93215","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-31T03:50:03.904859Z"},{"key":"W912P727S0002","latest_notice_id":"9e0853c1c7f147e3bacff6805aa589a3","title":"FY27 San Francisco District Maintenance Dredging","solicitation_number":"W912P727S0002","notice_type":"r","first_type":"r","first_posted":"2026-11-04","last_posted":"2026-11-04","notices":1,"due_at":"2026-12-04T23:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-04T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912P7","office_name":"W075 ENDIST SAN FRAN","naics":"237990","psc":"Z1KF","set_aside":null,"state":"CA","county":"06075","county_name":"San Francisco County","city":"0667000","city_name":"San Francisco","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-05T04:36:35.392694Z"},{"key":"W9123827BA001","latest_notice_id":"8e0bfb2528914288a383f9fddedba256","title":"USACE SPK DBB Construction - LAR C3B North - Sacramento, CA","solicitation_number":"W9123827BA001","notice_type":"o","first_type":"p","first_posted":"2026-10-02","last_posted":"2026-11-20","notices":3,"due_at":"2026-12-18T17:00:00Z","due_date":"2026-12-18","closes_at":"2026-12-18T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W91238","office_name":"W075 ENDIST SACRAMENTO","naics":"237990","psc":"Y1LC","set_aside":"SBA","state":"CA","county":"06067","county_name":"Sacramento County","city":"0664000","city_name":"Sacramento","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"}],"similar_open_total":142,"indexable":false}