Provide Architecture and Engineering (A&E) Design Services - MACA Re-design
140P5125Q0045
National Park Service, Ser East Mabo. Architectural Services.
Awarded
$69,625.80 obligated so far on USAspending
Get the next one like this from National Park Service by email, the day it is posted.Find my opportunities
This one was awarded in 2025
4 like it are open now in architectural services
- Sources Sought Advisory and Assistance Services contract.
Department of the Air Force, FA2521 45 Cons PK
Sources sought8(a)NAICS 541310Patrick AFB, FLA-E_A-SServices2027Due in 7 daysDec 3 - INDEFINITE DELIVERY/ INDEFINITE QUANTITY (IDIQ) CONTRACT FOR ARCHITECT-ENGINEER (A-E) SERVICES FOR FACILITIES WITH SECURED SPACES LOCATED THROUGHOUT NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND AREA OF RESPONSIBILITY, WORLDWIDE
Department of the Navy, Navfacsyscom Atlantic
Combined synopsis and solicitationNAICS 541310Norfolk, VAN6247026R0022Closes in 14 daysDec 10 - Multi-Discipline Architect-Engineer (A-E) services
Department of the Navy, Naval Surface Warfare Center
Combined synopsis and solicitationSmall businessNAICS 541310Location not publishedN6133127R0003Closes in 39 daysJan 4, 2027
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
- How it ended
- Awarded to Vanasse Hangen Brustlin, Inc. on August 27, 2025. The contracting office reported 1 offer (not available for competition).
Description
As published on SAM.gov.
GENERAL DESCRIPTION OF WORK:
Architecture & Engineering (A&E) Design Services for a Project to Reconstruct Rafinesque Hall Cave Trail within Mammoth Cave National Park, Edmonson County.
SCOPE OF SERVICE REQUIREMENTS:
Task 1: Update Trail Construction Drawings and Specifications for "No-Dig" Requirements Objective: Revise construction drawings and specifications to reflect "No-Dig" requirements for Rafinesque Cave Trail, ensuring alignment with SHPO and NPS historical and archaeological standards.
Scope:
• Review all existing 100% construction drawings and specifications.
• Revise both drawings and specifications to clearly state that all work must remain on the surface layer without excavation, grading, or subsurface alteration.
• Defining the starting point of the "No-Dig" approach at the existing trail edge near Little Bat Avenue and extend forward along the trail. A conference call will be held following NTP to confirm the limitation of “no-dig” areas.
• Specify surface-only installation of pavers and lint guards using approved, non-intrusive anchoring methods.
• Submit updated drawings and specifications to the park for review and approval.
Task 2: Incorporate Constraints into Updated Documents
Objective: Ensure the revised drawings and specifications reflect all constraints necessary to protect historical and natural features.
Scope:
• Integrate SHPO requirements for maintaining visibility of natural features and avoiding direct lighting impacts.
• Ensure trail alignment and gather space expansion remain within previously developed and cleared areas, as shown in Attachment 1 (NPS is to provide Attachment 1 prior to beginning of the re-design).
• Submit updated documents for Park review and comments, with revisions applied as needed.
Task 3: Finalize Updated Construction Document Package
Objective: Deliver a fully-up-to-date construction document package, incorporating all Park feedback and finalizing both drawings and specifications.
Scope:
• Incorporate final Park and SHPO feedback into both specifications and drawings to address all constraints and requirements. Park is to coordinate with SHPO.
• Submit a finalized package in combined PDF format and individual files, including updated specifications and drawings.
• Ensure all final drawings retain the original engineer’s seal and date from the initial 100% CDs, where applicable. NPS is to clarify if all sheets are to be redated, or only the revised sheets.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Vanasse Hangen Brustlin, Inc.
- UEI
- GRE7FRHVM919
- CAGE
- 0LYL1
- Vendor location
- Watertown, MA
- Contract
- 140P5125P0096, purchase order
- Obligated
- $69,625.80
- Actions
- 2 between August 27, 2025 and November 19, 2025
- Competition
- Not Available for Competition, 1 offer received
- Set-aside reported
- No Set Aside Used.
- Described as
- Provide Architecture and Engineering (A&e) Design Services. Re-Design Services to Reconstruct Rafinesque Hall Cave Trail (Rafinesque Avenue Re-Design) for Mammoth Cave National Park Mammoth Cave, Kentucky
- Match
- solicitation number 140P5125Q0045 equals the FPDS solicitation identifier; same awarding office 140P51 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 22, 2025
Special notice
Due September 12, 2025 at 1:00 PM EDT. SAM.gov, notice 5bcb3e6e49324d74970ba307b37bf19b
1 revision on SAM
- August 22, 2025: publish, special notice
Points of contact
- Dingle, Edwardedward_dingle@nps.gov4045075747