Special notice
Title III Services
140P5125Q0044
National Park Service, Ser East Mabo. Architectural Services.
Awarded
Lord Aeck Sargent Planning & Design Inc.
$0.00 obligated so far on USAspending
Get the next one like this from National Park Service by email, the day it is posted.Find my opportunities
This one was awarded in 2025
4 like it are open now in architectural services
- Sources Sought Advisory and Assistance Services contract.
Department of the Air Force, FA2521 45 Cons PK
Sources sought8(a)NAICS 541310Patrick AFB, FLA-E_A-SServices2027Due in 7 daysDec 3 - INDEFINITE DELIVERY/ INDEFINITE QUANTITY (IDIQ) CONTRACT FOR ARCHITECT-ENGINEER (A-E) SERVICES FOR FACILITIES WITH SECURED SPACES LOCATED THROUGHOUT NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND AREA OF RESPONSIBILITY, WORLDWIDE
Department of the Navy, Navfacsyscom Atlantic
Combined synopsis and solicitationNAICS 541310Norfolk, VAN6247026R0022Closes in 14 daysDec 10 - Multi-Discipline Architect-Engineer (A-E) services
Department of the Navy, Naval Surface Warfare Center
Combined synopsis and solicitationSmall businessNAICS 541310Location not publishedN6133127R0003Closes in 39 daysJan 4, 2027
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
- How it ended
- Awarded to Lord Aeck Sargent Planning & Design Inc. on September 2, 2025. The contracting office reported 1 offer (not available for competition).
Description
As published on SAM.gov.
GENERAL DESCRIPTION OF WORK:
The work shall consist of submittal reviews, Request for Information (RFI) responses, office services, and site visits as outlined below. The A&E representatives shall attend weekly construction progress meetings.
SCOPE OF SERVICE REQUIREMENTS:
Key personnel shall not change during the performance of this task order unless written approval is obtained from the CO.
Action Submittal Review
1. Submittal Review: Includes Specification Divisions 2 through 49 reviews of shop drawings, samples, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data and similar materials furnished by Construction Contractor to explain in detail specific portions of the work required by the Contract.
2. Processing Procedures: A/E shall thoroughly review construction documents and applicable standards and codes then recommend to the Government if approves, approves with notations, or disapproves submittals. Reviews shall be completed with recommended actions indicated and returned and received by the COR within 12 calendar days of receipt of such submittals. Processing time shall begin upon receiving a submittal from the Government and end at the return of the fully processed submittal to the COR.
3. Approval Procedures: Each submittal shall be verified for conformance to the Construction Documents. Corrections to the submittal shall be noted in red.
4. Estimating Time for Submittal Review: Refer to the Submittal List and Review Estimate template for information on specific submittals to be reviewed by the A/E. Use this template to establish a basis for estimating the time required to complete reviews. A/E is responsible for reviewing action submittals, not informational submittals. Failure by A/E to complete the Submittal List and Review Estimate template during design shall not relieve the A/E of responsibility to provide review of contract specified action submittals at no additional cost to the Government above task order price.
Request for Information (RFI) Review
1. RFI services shall not be performed unless the specific services are authorized in writing by the COR assigned to this task order. The COR will use the Standard Communication Form to document and approve specific office services prior to the initiation of the work.
2. Processing Procedures: A/E shall review and respond to construction originated RFIs. Reviews shall be completed and responses posted to the NPS project management and communication software within 7calendar days of receiving RFIs. (Highest priority RFIs may require shorter turnaround time.) Processing time shall begin upon receiving RFI from the Government and end at the return of the fully processed RFI to the Government.
3. Clarifying RFIs: RFIs arising from insufficient clarity of construction documents shall be responded to by A/E at no cost to the Government.
Office Services
As requested by the CO, the A/E shall provide services to assist the CO in matters other than submittal reviews, RFI reviews, and coordination of sustainability requirements. Services could include preparing or analyzing construction schedules, reviewing value engineering proposals, preparing sketches, cost estimating, and other work. Office services shall not be performed unless the specific services are authorized in writing by the COR assigned to this task order. The COR will use the Standard Communication Form to document and approve specific office services prior to the initiation of the work.
Forty (40) hours of Office Services are anticipated.
As-Constructed Drawings
Using previously prepared AutoCAD construction drawing files, provide office services as required to prepare As-Constructed Drawings. The Government will furnish a set of Project Record drawings, field sketches, construction modification drawings, notes, etc. for inclusion.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- UEI
- M89KVHGSL2M3
- CAGE
- 957T3
- Vendor location
- Atlanta, GA
- Contract
- 140P5125P0089, purchase order
- Obligated
- $0.00
- Actions
- 2 between September 2, 2025 and September 18, 2026
- Competition
- Not Available for Competition, 1 offer received
- Set-aside reported
- No Set Aside Used.
- Described as
- Architect/Engineer (A/E) Services That Will Provide RFI Response, Submittal Review, and Office Services to Provide Technical Support to Chickamauga and Chattanooga National Military Park Fort Oglethorpe, Georgia.
- Match
- solicitation number 140P5125Q0044 equals the FPDS solicitation identifier; same awarding office 140P51 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 12, 2025
Special notice
Due August 18, 2025 at 1:00 PM EDT. SAM.gov, notice d1d7701559934c53b4ba76aeb5f53456
1 revision on SAM
- August 12, 2025: publish, special notice
Points of contact
- Dingle, Edwardedward_dingle@nps.gov4045075747