Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,711 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Sources sought

DEVA - 335272, Repair Flood Damaged Titus Canyon R

140P2025R0096

National Park Service, DSC Contracting Services Division. Highway, Street, and Bridge Construction.

Response deadline

July 23, 2025 at 1:00 PM EDT

Closed 491 days ago. Posted July 9, 2025. Scheduled to archive August 7, 2025.

Get the next one like this from National Park Service by email, the day it is posted.Find my opportunities

This one closed in 2025

36 like it are open now in highway, street, and bridge construction

All 36 open in highway, street, and bridge construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
What comes next
No solicitation was published under this number after the sources sought of July 9, 2025. An agency sometimes issues the solicitation under a new number.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

This is a Sources Sought Notice (SSN) for the purpose of conducting market research. Proposals are NOT being requested, nor accepted at this time. Responses are being requested from both large and small businesses.

Purpose: The purpose of this notice is to gain knowledge regarding the type of interested businesses and their qualifications. The National Park Service (NPS) will use information obtained through this notice to develop an acquisition strategy.

The Government anticipates conducting a competitive acquisition for this requirement. The amount of interest or lack thereof will determine the possibility of a small business or other socio-economical small business set-aside for the solicitation. Analysis of the quality of responses to this source sought announcement will be considered in the market research being conducted, and in the making of any small business set-aside determination for this requirement.

Additional Information: No proposal package, solicitation, specification or drawings are available with this notice.

Cost Reimbursement: Response to this announcement is strictly voluntary; no reimbursement will be made for any costs associated with providing information in response to this sources sought announcement or any follow-up information requests.

North American Industry Classification System (NAICS) code: 237310 ¿ Highway Street and Bridge Construction

Small Business Size Standard: $45 Million

Solicitation: The NPS anticipates issuing a request for proposals in the Fall/Winer of 2025.

Bonding: The NPS anticipates bid, performance and payment bonds will be required.




Project Description:

Project Conditions:
The project is located at Death Valley National Park, California and Nevada.

The construction magnitude is $5,000,000.00 - $10,000,000.00.

The surrounding area is rural with limited staging available within the park boundary. There are no unique material delivery requirements. The construction site is 8 miles from the nearest lodging facilities and 80 miles from the nearest supplier. Titus Canyon Road will remain closed to the public until construction repairs are complete. However, the Park will remain open during construction; thus, contract activities and logistics must be structured and scheduled to minimize hazards to visitors and other travelers on roads outside the project area.

The site requires protective measures to ensure the surrounding area remains undisturbed. The road repairs will be done on an existing, unpaved, high-clearance vehicle road that is currently closed to the public due to storm damage.

The anticipated period of performance is 180 calendar days including any potential weather shutdown. There are no seasonal or other shutdowns mandated through the construction season. However, summer construction may be difficult or hazardous due to high temperatures.

Project Scope:
Work to be performed under this construction project includes:
The project will repair 14 miles of one-lane, unpaved road recently damaged in an extreme rain event that caused flood and erosion damage. The project starts and ends at GPS coordinates 36.8551°,-116.8789° and 36.8529°,-117.0622°. The road is located in mountainous terrain, and typically lies on a graded bench that has been cut into the hillsides. The damage to the road includes deep erosion gullies, deposition of larger material unsuitable for a driving surface, scoured out wash crossings, and loss of road bench width. Dry washes cross the surface of the roadway in a number of locations. Several of these wash crossings need to be repaired and armored with riprap to protect against damage in future storms. Previous grading repairs and maintenance after storms have resulted in long berms of sand and gravel on the roadside. These berms interfere with effective storm water drainage and lead to increased damage during storms. The project includes removal of these berms and reuse of the material on site to fill erosion gullies and resurface the roadway.

Drain humps, similar to water bars on hiking trails, will be installed at intervals to move storm water off the roadway surface. Drainage channels will also be graded off the roadside to move water off the roadway surface. To the extent possible, import of new material will be minimized in favor of reusing the existing sand, gravel and rock available on site within the project disturbance limits. Riprap for erosion control will be obtained primarily from material salvaged on site. Precast concrete barriers will be needed for constructing some of the drainage humps (the barriers are completely buried in the hump to act as barrier against erosion in extreme storm events).

Because the roadway is narrow (generally only one lane wide), numerous turn-around areas are designated for trucks and equipment to use during construction. Vehicles and equipment are otherwise prohibited from driving off road. In a 530¿-long road segment where the road width is insufficient, the inboard rock cut slope will be selectively scaled and excavated to make additional width. Excavations will range from 5¿ to 20¿ in height. Excavated material will be used as riprap and for other purposes on the project site.
The project includes flood damage repair at the Fall Canyon Trailhead, which is the small unpaved parking area at mouth of the canyon on the west side of the mountains, at GPS coordinates 36.8220°,-117.1741°. This area is not contiguous with the rest of the project. Repairs at the Fall Canyon Trailhead include regrading, placement of riprap, and replacement of a steel vehicle gate.

Submittal Contents: Interested (small and large) businesses should submit the following information:
(1) Company name, UEI number, address, point of contact, telephone number, and email address.
(2) Business type: Classification as a Large or Small Business under the above listed NAICS, Small Business Administration (SBA) certified Historically Underutilized Business Zone (HUBZone), Veteran-Owned Small Businesses (VOSB), Service-Disabled Veteran-Owned Small Businesses (SDVOSB), SBA certified Woman Owned Small Business (WOSB), Economically Disadvantaged Woman Owned Small Business (EDWOSB). The size of a small business firm includes all parents, subsidiaries, affiliates, etc.¿see 13 CFR 121.108.) Misrepresentation of size status can result in penalties.
(3) Statement regarding your company¿s bonding capacity. Letters from bonding companies are not required at this time.
(4) Information demonstrating experience and capability on projects of same or similar size, scope and magnitude, and constructed under similar conditions.

(5) In addition businesses may submit existing marketing materials such as capability statements and brochures.

Submittal Due Date/Time: Wednesday, July 23, 2025, no later than 11:00am MT.

Submit To: Please send all documents to the Contracting Officer, Rachel Dyer at Rachel_dyer@NPS.Gov.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 9, 2025

    Sources sought

    Due July 23, 2025 at 1:00 PM EDT. SAM.gov, notice f3644adab7ef42b5b4dff706bc2f1f09

    1 revision on SAM
    • July 9, 2025: publish, sources sought

Points of contact