{"canonical":"https://sealedbidder.com/opportunities/140l6225q0005","key":"140L6225Q0005","url":"https://sealedbidder.com/opportunities/140l6225q0005","title":"Y--BLM-WY IRA NEW FORK RIVER, SHEEP FENCE","solicitation_number":"140L6225Q0005","notice_type":"a","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-01-13T21:00:00Z","first_posted":"2024-12-13","last_posted":"2025-01-14","department":"INTERIOR, DEPARTMENT OF THE","subagency":"BUREAU OF LAND MANAGEMENT","office":"WYOMING STATE OFFICE","naics":"238990","psc":"Y1PZ","set_aside":"SBA","place_state":"WY","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"56035","place_county_name":"Sublette County","place_city":"5661580","place_city_name":"Pinedale","winner":"INDIAN SPRINGS WORKING RANCH LLC","award_amount":"100000","publications":[{"notice_id":"9ee4caf8b81448ae89c42d6429b5aa78","title":"IRA NEW FORK RIVER, SHEEP FENCE","solicitation_number":"140L6225Q0005","notice_type":"o","base_type":"o","posted":"2024-12-13","posted_at":null,"due_at":"2025-01-13T21:00:00Z","due_date":"2025-01-13","cancelled":null,"archived":null,"archive_date":"2025-01-28","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/9ee4caf8b81448ae89c42d6429b5aa78/view","enriched":false,"history":[]},{"notice_id":"2824897ed34f41c3bf0746107c5521ae","title":"Y--IRA NEW FORK RIVER, SHEEP FENCE","solicitation_number":"140L6225Q0005","notice_type":"o","base_type":"o","posted":"2024-12-31","posted_at":null,"due_at":"2025-01-13T21:00:00Z","due_date":"2025-01-13","cancelled":null,"archived":null,"archive_date":"2025-01-28","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/2824897ed34f41c3bf0746107c5521ae/view","enriched":false,"history":[]},{"notice_id":"c3c453ee4a4841b2b76410293f6b6165","title":"Y--IRA NEW FORK RIVER, SHEEP FENCE","solicitation_number":"140L6225Q0005","notice_type":"o","base_type":"o","posted":"2025-01-10","posted_at":"2025-01-10T21:54:45.629Z","due_at":"2025-01-13T21:00:00Z","due_date":"2025-01-13","cancelled":false,"archived":true,"archive_date":"2025-01-28","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/c3c453ee4a4841b2b76410293f6b6165/view","enriched":true,"history":[{"index":6,"title":"Y--BLM-WY IRA NEW FORK RIVER, SHEEP FENCE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-14T06:00:41.182Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"65b4c8315e844f4c98c9f02dc30d6c2f","solicitation_number":"140L6225Q0005","related_opportunity_id":"c3c453ee4a4841b2b76410293f6b6165"},{"index":5,"title":"Y--IRA NEW FORK RIVER, SHEEP FENCE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-10T21:54:45.629Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c3c453ee4a4841b2b76410293f6b6165","solicitation_number":"140L6225Q0005","parent_opportunity_id":"9ee4caf8b81448ae89c42d6429b5aa78"},{"index":2,"title":"Y--IRA NEW FORK RIVER, SHEEP FENCE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-31T16:32:23.698Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2824897ed34f41c3bf0746107c5521ae","solicitation_number":"140L6225Q0005","parent_opportunity_id":"9ee4caf8b81448ae89c42d6429b5aa78"},{"index":1,"title":"IRA NEW FORK RIVER, SHEEP FENCE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-13T20:48:09.989Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9ee4caf8b81448ae89c42d6429b5aa78","solicitation_number":"140L6225Q0005"}]},{"notice_id":"65b4c8315e844f4c98c9f02dc30d6c2f","title":"Y--BLM-WY IRA NEW FORK RIVER, SHEEP FENCE","solicitation_number":"140L6225Q0005","notice_type":"a","base_type":"o","posted":"2025-01-14","posted_at":"2025-01-14T06:00:41.182Z","due_at":null,"due_date":null,"cancelled":false,"archived":true,"archive_date":"2025-01-28","removed_at":null,"award_number":"140L6225P0008","awardee_name":"INDIAN SPRINGS WORKING RANCH LLC","amount":"100000","link_sam":"https://sam.gov/workspace/contract/opp/65b4c8315e844f4c98c9f02dc30d6c2f/view","enriched":true,"history":[{"index":5,"title":"Y--BLM-WY IRA NEW FORK RIVER, SHEEP FENCE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-14T06:00:41.182Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"65b4c8315e844f4c98c9f02dc30d6c2f","solicitation_number":"140L6225Q0005","related_opportunity_id":"c3c453ee4a4841b2b76410293f6b6165"},{"index":3,"title":"Y--IRA NEW FORK RIVER, SHEEP FENCE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-10T21:54:45.629Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c3c453ee4a4841b2b76410293f6b6165","solicitation_number":"140L6225Q0005","parent_opportunity_id":"9ee4caf8b81448ae89c42d6429b5aa78"}]}],"latest_notice_id":"65b4c8315e844f4c98c9f02dc30d6c2f","first_type":"o","notices":[{"dates":{"posted":"2024-12-13","response_deadline":{"raw":"2025-01-13T14:00:00-07:00","utc":"2025-01-13T21:00:00Z","date":"2025-01-13","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/9ee4caf8b81448ae89c42d6429b5aa78/view"},"naics":{"codes":["238990"],"primary":"238990"},"title":"IRA NEW FORK RIVER, SHEEP FENCE","agency":{"office":{"code":"140L62","name":"WYOMING STATE OFFICE"},"subtier":{"code":"1422","name":"BUREAU OF LAND MANAGEMENT"},"department":{"code":"014","name":"INTERIOR, DEPARTMENT OF THE"},"office_address":{"zip":"82009","city":"CHEYENNE","state":"WY","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-01-28","archive_type":"auto15"},"contacts":[{"fax":"(307) 775-6129","name":"Martinez, Crystal","role":"primary","email":"crystalm@blm.gov","phone":"3077756336"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"9ee4caf8b81448ae89c42d6429b5aa78","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"9ff0bfb3bb7048e1d84e549ac0a164b2d079e6b7d043876d8c5c96f2493858e8","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"IRA NEW FORK RIVER, SHEEP FENCE The work includes converting an existing barbed wire fence to a wildlife friendly fence. This fence consists of two segments: New Fork River Fence, and Sheep Fence on New Fork. The total length of the two segments combined is approximately 3.52 miles. It is the Contractor's responsibility to ensure that livestock does not cross through the opening between when the old fence is removed, and the new fence is constructed. Period of Performance for this fence is 08/15/25-11/15/25. Specifics for Segment No. 1 - New Fork River Fence: Location: T31N, R109W, Sections 21, 28, and 33 There are approximately 14,927 linear feet in this segment of fence to be removed and disposed of in accordance with the requirements in Section 02827, Fence Removal. There are approximately 14,927 linear feet of new 4-wire, all-wood post fence to be constructed in accordance with the drawings and Work Data Sheet. It is estimated to have each of the following: - Nineteen (19) stress panels (H-brace), - Zero (0) end panels, - Seven (7) 3-post corners, - Twelve (12) 16-foot wire gates, and - Seven (7) new X-gate wildlife crossing gates. Each wildlife crossing gate includes two (2) H-braces and wiring shown in the drawings. Leave any existing X-gate wildlife crossing gates. Specifics for Segment No. 2 - Sheep Fence on New Fork: Location: T30N, R109W, Sections 28 and 29 There are approximately 3,659 linear feet in this segment of fence to be removed and disposed of in accordance with the requirements in Section 02827, Fence Removal. There are approximately 3,659 linear feet of new 5-wire, all-wood post fence to be constructed in accordance with the drawings and Work Data Sheet. It is estimated to have each of the following: - Ten (10) stress panels (H-brace), - Four (4) end panels, - Zero (0) 3-post corners, - Two (2) 16-foot wire gates, and - Zero (0) new X-gate wildlife crossing gates. Leave any existing X-gate wildlife crossing gates. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation will not be issued. See the Attachments for the specifications. Questions Due Date: Friday, December 27th, 2024 at 12:00 pm MST All questions must be submitted in writing via email to the Contract Officer. Quotations Due Date: Monday, January 13th, 2025 at 2:00 pm MST Contract Officer: Crystal Martinez Period of Performance: 08/15/25 - 11/15/2025 Basic Contracting Requirements: 1. Active Registration: www.sam.gov/SAM 2. Invoicing and Payment: www.ipp.gov - 30-day prompt pay after delivery. We can accept and pay interim invoices. Instructions to Offerors: - Check your SAM registration, this must be current at the time you make your offer. - Please email with any questions you have, prior to the closing date, with enough time to research an answer. - Email your signed quote package to: crystalm@blm.gov, with the title and solicitation number in the subject line, no later than the closing date. Include your Unique Entity Identifier (UEI) number on your quote. - You may put your prices on the SF-1442 form but must also fill out the Bid Schedule. - Include enough description/information in order to determine technical acceptability.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"140L6225Q0005","place_of_performance":{"zip":"82941","city":{"name":"Pinedale"},"state":{"code":"WY"},"street":"1625 West Pine Street","country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2024-12-31","response_deadline":{"raw":"2025-01-13T14:00:00-07:00","utc":"2025-01-13T21:00:00Z","date":"2025-01-13","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/2824897ed34f41c3bf0746107c5521ae/view"},"naics":{"codes":["238990"],"primary":"238990"},"title":"Y--IRA NEW FORK RIVER, SHEEP FENCE","agency":{"office":{"code":"140L62","name":"WYOMING STATE OFFICE"},"subtier":{"code":"1422","name":"BUREAU OF LAND MANAGEMENT"},"department":{"code":"014","name":"INTERIOR, DEPARTMENT OF THE"},"office_address":{"zip":"82009","city":"CHEYENNE","state":"WY","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-01-28","archive_type":"auto15"},"contacts":[{"fax":"(307) 775-6129","name":"Martinez, Crystal","role":"primary","email":"crystalm@blm.gov","phone":"3077756336"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"2824897ed34f41c3bf0746107c5521ae","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"11d238cde1b0604ea34580d2605b1b01d657971731bade9d093cc607a49ad8cc","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"IRA NEW FORK RIVER, SHEEP FENCE The work includes converting an existing barbed wire fence to a wildlife friendly fence. This fence consists of two segments: New Fork River Fence, and Sheep Fence on New Fork. The total length of the two segments combined is approximately 3.52 miles. It is the Contractor's responsibility to ensure that livestock does not cross through the opening between when the old fence is removed, and the new fence is constructed. Period of Performance for this fence is 08/15/25-11/15/25. Specifics for Segment No. 1 - New Fork River Fence: Location: T31N, R109W, Sections 21, 28, and 33 There are approximately 14,927 linear feet in this segment of fence to be removed and disposed of in accordance with the requirements in Section 02827, Fence Removal. There are approximately 14,927 linear feet of new 4-wire, all-wood post fence to be constructed in accordance with the drawings and Work Data Sheet. It is estimated to have each of the following: - Nineteen (19) stress panels (H-brace), - Zero (0) end panels, - Seven (7) 3-post corners, - Twelve (12) 16-foot wire gates, and - Seven (7) new X-gate wildlife crossing gates. Each wildlife crossing gate includes two (2) H-braces and wiring shown in the drawings. Leave any existing X-gate wildlife crossing gates. Specifics for Segment No. 2 - Sheep Fence on New Fork: Location: T30N, R109W, Sections 28 and 29 There are approximately 3,659 linear feet in this segment of fence to be removed and disposed of in accordance with the requirements in Section 02827, Fence Removal. There are approximately 3,659 linear feet of new 5-wire, all-wood post fence to be constructed in accordance with the drawings and Work Data Sheet. It is estimated to have each of the following: - Ten (10) stress panels (H-brace), - Four (4) end panels, - Zero (0) 3-post corners, - Two (2) 16-foot wire gates, and - Zero (0) new X-gate wildlife crossing gates. Leave any existing X-gate wildlife crossing gates. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation will not be issued. See the Attachments for the specifications. Questions Due Date: Friday, December 27th, 2024 at 12:00 pm MST All questions must be submitted in writing via email to the Contract Officer. Quotations Due Date: Monday, January 13th, 2025 at 2:00 pm MST Contract Officer: Crystal Martinez Period of Performance: 08/15/25 - 11/15/2025 Basic Contracting Requirements: 1. Active Registration: www.sam.gov/SAM 2. Invoicing and Payment: www.ipp.gov - 30-day prompt pay after delivery. We can accept and pay interim invoices. Instructions to Offerors: - Check your SAM registration, this must be current at the time you make your offer. - Please email with any questions you have, prior to the closing date, with enough time to research an answer. - Email your signed quote package to: crystalm@blm.gov, with the title and solicitation number in the subject line, no later than the closing date. Include your Unique Entity Identifier (UEI) number on your quote. - You may put your prices on the SF-1442 form but must also fill out the Bid Schedule. - Include enough description/information in order to determine technical acceptability.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"140L6225Q0005","place_of_performance":{"zip":"82941","city":{"name":"Pinedale"},"state":{"code":"WY"},"street":"1625 West Pine Street","country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"award":{},"dates":{"posted":"2025-01-10","posted_at":"2025-01-10T21:54:45.629Z","created_at":"2025-01-10T21:54:42.188Z","modified_at":"2025-01-29T04:55:45.114Z","response_deadline":{"raw":"2025-01-13T14:00:00-07:00","utc":"2025-01-13T21:00:00Z","date":"2025-01-13","time":"14:00:00","timezone":"America/Denver","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/c3c453ee4a4841b2b76410293f6b6165/view"},"naics":{"codes":["238990"],"primary":"238990"},"title":"Y--IRA NEW FORK RIVER, SHEEP FENCE","agency":{"office":{"code":"140L62","name":"WYOMING STATE OFFICE"},"subtier":{"code":"1422","name":"BUREAU OF LAND MANAGEMENT"},"department":{"code":"014","name":"INTERIOR, DEPARTMENT OF THE"},"office_address":{"zip":"82009","city":"CHEYENNE","state":"WY","country":"USA"},"organization_id":"100166818","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-01-28","archive_type":"auto15"},"history":[{"index":6,"title":"Y--BLM-WY IRA NEW FORK RIVER, SHEEP FENCE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-14T06:00:41.182Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"65b4c8315e844f4c98c9f02dc30d6c2f","solicitation_number":"140L6225Q0005","related_opportunity_id":"c3c453ee4a4841b2b76410293f6b6165"},{"index":5,"title":"Y--IRA NEW FORK RIVER, SHEEP FENCE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-10T21:54:45.629Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c3c453ee4a4841b2b76410293f6b6165","solicitation_number":"140L6225Q0005","parent_opportunity_id":"9ee4caf8b81448ae89c42d6429b5aa78"},{"index":2,"title":"Y--IRA NEW FORK RIVER, SHEEP FENCE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-31T16:32:23.698Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2824897ed34f41c3bf0746107c5521ae","solicitation_number":"140L6225Q0005","parent_opportunity_id":"9ee4caf8b81448ae89c42d6429b5aa78"},{"index":1,"title":"IRA NEW FORK RIVER, SHEEP FENCE","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-13T20:48:09.989Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9ee4caf8b81448ae89c42d6429b5aa78","solicitation_number":"140L6225Q0005"}],"contacts":[{"fax":"(307) 775-6129","name":"Martinez, Crystal","role":"primary","email":"crystalm@blm.gov","phone":"3077756336"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"c3c453ee4a4841b2b76410293f6b6165","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"9ee4caf8b81448ae89c42d6429b5aa78","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-26T02:13:41.683532324Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"f88c60bd4e40bdb9c4a1623558fdda389ffc213556cd5237e7bee8d17dc119ee","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-26T02:13:41.683532324Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"IRA NEW FORK RIVER, SHEEP FENCE<br/><br/>The work includes converting an existing barbed wire fence to a wildlife friendly fence. This fence consists of two segments: New Fork River Fence, and Sheep Fence on New Fork. <br/>The total length of the two segments combined is approximately 3.52 miles. <br/>It is the Contractor's responsibility to ensure that livestock does not cross through the opening between when the old fence is removed, and the new fence is constructed. <br/>Period of Performance for this fence is 08/15/25-11/15/25. <br/><br/>Specifics for Segment No. 1 - New Fork River Fence: <br/>Location: T31N, R109W, Sections 21, 28, and 33 <br/>There are approximately 14,927 linear feet in this segment of fence to be removed and disposed of in accordance with the requirements in Section 02827, Fence Removal. There are approximately 14,927 linear feet of new 4-wire, all-wood post fence to be constructed in accordance with the drawings and Work Data Sheet. It is estimated to have each of the following: <br/>- Nineteen (19) stress panels (H-brace), <br/>- Zero (0) end panels, <br/>- Seven (7) 3-post corners, <br/>- Twelve (12) 16-foot wire gates, and <br/>- Seven (7) new X-gate wildlife crossing gates. <br/><br/>Each wildlife crossing gate includes two (2) H-braces and wiring shown in the drawings. Leave any existing X-gate wildlife crossing gates.<br/>Specifics for Segment No. 2 - Sheep Fence on New Fork: <br/>Location: T30N, R109W, Sections 28 and 29 <br/>There are approximately 3,659 linear feet in this segment of fence to be removed and disposed of in accordance with the requirements in Section 02827, Fence Removal. There are approximately 3,659 linear feet of new 5-wire, all-wood post fence to be constructed in accordance with the drawings and Work Data Sheet. It is estimated to have each of the following: <br/>- Ten (10) stress panels (H-brace), <br/>- Four (4) end panels, <br/>- Zero (0) 3-post corners, <br/>- Two (2) 16-foot wire gates, and <br/>- Zero (0) new X-gate wildlife crossing gates. <br/><br/>Leave any existing X-gate wildlife crossing gates.<br/><br/>This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation will not be issued. See the Attachments for the specifications.<br/><br/>Questions Due Date: Friday, December 27th, 2024 at 12:00 pm MST<br/>All questions must be submitted in writing via email to the Contract Officer.<br/><br/>Quotations Due Date: Monday, January 13th, 2025 at 2:00 pm MST<br/>Contract Officer: Crystal Martinez<br/><br/>Period of Performance: 08/15/25 - 11/15/2025<br/><br/>Basic Contracting Requirements:<br/>1. Active Registration: www.sam.gov/SAM<br/>2. Invoicing and Payment: www.ipp.gov - 30-day prompt pay after delivery. We can accept and pay interim invoices.<br/>Instructions to Offerors:<br/>- Check your SAM registration, this must be current at the time you make your offer.<br/>- Please email with any questions you have, prior to the closing date, with enough time to research an answer.<br/>- Email your signed quote package to: crystalm@blm.gov, with the title and solicitation number in the subject line, no later than the closing date. Include your Unique Entity Identifier (UEI) number on your quote.<br/>- You may put your prices on the SF-1442 form but must also fill out the Bid Schedule.<br/>- Include enough description/information in order to determine technical acceptability.<br/>","text":"IRA NEW FORK RIVER, SHEEP FENCE\n\nThe work includes converting an existing barbed wire fence to a wildlife friendly fence. This fence consists of two segments: New Fork River Fence, and Sheep Fence on New Fork.\nThe total length of the two segments combined is approximately 3.52 miles.\nIt is the Contractor's responsibility to ensure that livestock does not cross through the opening between when the old fence is removed, and the new fence is constructed.\nPeriod of Performance for this fence is 08/15/25-11/15/25.\n\nSpecifics for Segment No. 1 - New Fork River Fence:\nLocation: T31N, R109W, Sections 21, 28, and 33\nThere are approximately 14,927 linear feet in this segment of fence to be removed and disposed of in accordance with the requirements in Section 02827, Fence Removal. There are approximately 14,927 linear feet of new 4-wire, all-wood post fence to be constructed in accordance with the drawings and Work Data Sheet. It is estimated to have each of the following:\n- Nineteen (19) stress panels (H-brace),\n- Zero (0) end panels,\n- Seven (7) 3-post corners,\n- Twelve (12) 16-foot wire gates, and\n- Seven (7) new X-gate wildlife crossing gates.\n\nEach wildlife crossing gate includes two (2) H-braces and wiring shown in the drawings. Leave any existing X-gate wildlife crossing gates.\nSpecifics for Segment No. 2 - Sheep Fence on New Fork:\nLocation: T30N, R109W, Sections 28 and 29\nThere are approximately 3,659 linear feet in this segment of fence to be removed and disposed of in accordance with the requirements in Section 02827, Fence Removal. There are approximately 3,659 linear feet of new 5-wire, all-wood post fence to be constructed in accordance with the drawings and Work Data Sheet. It is estimated to have each of the following:\n- Ten (10) stress panels (H-brace),\n- Four (4) end panels,\n- Zero (0) 3-post corners,\n- Two (2) 16-foot wire gates, and\n- Zero (0) new X-gate wildlife crossing gates.\n\nLeave any existing X-gate wildlife crossing gates.\n\nThis announcement constitutes the only solicitation; quotes are being requested, and a written solicitation will not be issued. See the Attachments for the specifications.\n\nQuestions Due Date: Friday, December 27th, 2024 at 12:00 pm MST\nAll questions must be submitted in writing via email to the Contract Officer.\n\nQuotations Due Date: Monday, January 13th, 2025 at 2:00 pm MST\nContract Officer: Crystal Martinez\n\nPeriod of Performance: 08/15/25 - 11/15/2025\n\nBasic Contracting Requirements:\n1. Active Registration: www.sam.gov/SAM\n2. Invoicing and Payment: www.ipp.gov - 30-day prompt pay after delivery. We can accept and pay interim invoices.\nInstructions to Offerors:\n- Check your SAM registration, this must be current at the time you make your offer.\n- Please email with any questions you have, prior to the closing date, with enough time to research an answer.\n- Email your signed quote package to: crystalm@blm.gov, with the title and solicitation number in the subject line, no later than the closing date. Include your Unique Entity Identifier (UEI) number on your quote.\n- You may put your prices on the SF-1442 form but must also fill out the Bid Schedule.\n- Include enough description/information in order to determine technical acceptability.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"140L6225Q0005","place_of_performance":{"zip":"82941","city":{"code":"61580","name":"Pinedale"},"state":{"code":"WY","name":"Wyoming"},"street":"1625 West Pine Street","country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1PZ"},{"award":{"date":"2025-01-13","amount":"100000","number":"140L6225P0008","awardee":{"raw":"INDIAN SPRINGS WORKING RANCH LLC 649 E CENTRAL AVE Eagar AZ 85925 USA","uei":"MUE6PNRMM4Y5","cage":"9FV09","name":"INDIAN SPRINGS WORKING RANCH LLC","location":{"zip":"85925","city":{"code":"20960","name":"Eagar"},"state":{"code":"AZ","name":"Arizona"},"street":"649 E CENTRAL AVE","country":{"code":"USA","name":"UNITED STATES"}}}},"dates":{"posted":"2025-01-14","posted_at":"2025-01-14T06:00:41.182Z","award_date":"2025-01-13","created_at":"2025-01-14T06:00:40.199Z","modified_at":"2025-01-29T04:55:45.114Z"},"links":{"sam":"https://sam.gov/workspace/contract/opp/65b4c8315e844f4c98c9f02dc30d6c2f/view"},"naics":{"codes":["238990"],"primary":"238990"},"title":"Y--BLM-WY IRA NEW FORK RIVER, SHEEP FENCE","agency":{"office":{"code":"140L62","name":"WYOMING STATE OFFICE"},"subtier":{"code":"1422","name":"BUREAU OF LAND MANAGEMENT"},"department":{"code":"014","name":"INTERIOR, DEPARTMENT OF THE"},"office_address":{"zip":"82009","city":"CHEYENNE","state":"WY","country":"USA"},"organization_id":"100166818","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-01-28","archive_type":"auto15"},"history":[{"index":5,"title":"Y--BLM-WY IRA NEW FORK RIVER, SHEEP FENCE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-14T06:00:41.182Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"65b4c8315e844f4c98c9f02dc30d6c2f","solicitation_number":"140L6225Q0005","related_opportunity_id":"c3c453ee4a4841b2b76410293f6b6165"},{"index":3,"title":"Y--IRA NEW FORK RIVER, SHEEP FENCE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-10T21:54:45.629Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c3c453ee4a4841b2b76410293f6b6165","solicitation_number":"140L6225Q0005","parent_opportunity_id":"9ee4caf8b81448ae89c42d6429b5aa78"}],"contacts":[{"fax":"(307) 775-6129","name":"Martinez, Crystal","role":"primary","email":"crystalm@blm.gov","phone":"3077756336"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"65b4c8315e844f4c98c9f02dc30d6c2f","lineage_id":"9ee4caf8b81448ae89c42d6429b5aa78","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-25T03:40:22.271161912Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"253d6c4cd8fd3487b1b53716c7185eb23ed347a85fa813e2f0e42fc2c5bf4199","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-25T03:40:22.271161912Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"IRA NEW FORK RIVER, SHEEP FENCE -  convert approximately 3.52 miles existing barbed wire fence to a wildlife friendly fence. <br/><br/>Awarded to Low Price Technically Acceptable Responsive Offer","text":"IRA NEW FORK RIVER, SHEEP FENCE - convert approximately 3.52 miles existing barbed wire fence to a wildlife friendly fence.\n\nAwarded to Low Price Technically Acceptable Responsive Offer","origin":"detail"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"140L6225Q0005","place_of_performance":{"zip":"82941","city":{"code":"61580","name":"Pinedale"},"state":{"code":"WY","name":"Wyoming"},"street":"1625 West Pine Street","country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1PZ"}],"due_at":"2025-01-13T21:00:00Z","due_date":"2025-01-13","closes_at":"2025-01-13T21:00:00Z","awardable":false,"dept_key":"d-014","dept_name":"INTERIOR, DEPARTMENT OF THE","sub_key":"s-1422","sub_name":"BUREAU OF LAND MANAGEMENT","office_key":"o-140L62","office_name":"WYOMING STATE OFFICE","state":"WY","county":"56035","county_name":"Sublette County","city":"5661580","city_name":"Pinedale","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"MUE6PNRMM4Y5","amount":"100000","linked_awards":4,"cancelled":false,"archived":true,"updated_at":"2026-11-25T04:14:46.474821Z","principal_notice_id":"65b4c8315e844f4c98c9f02dc30d6c2f","description":{"text":"IRA NEW FORK RIVER, SHEEP FENCE - convert approximately 3.52 miles existing barbed wire fence to a wildlife friendly fence.\n\nAwarded to Low Price Technically Acceptable Responsive Offer","html":"IRA NEW FORK RIVER, SHEEP FENCE -  convert approximately 3.52 miles existing barbed wire fence to a wildlife friendly fence. <br/><br/>Awarded to Low Price Technically Acceptable Responsive Offer","origin":"detail"},"contacts":[{"fax":"(307) 775-6129","name":"Martinez, Crystal","role":"primary","email":"crystalm@blm.gov","phone":"3077756336"}],"place_of_performance":{"zip":"82941","city":{"code":"61580","name":"Pinedale"},"state":{"code":"WY","name":"Wyoming"},"street":"1625 West Pine Street","country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"82009","city":"CHEYENNE","state":"WY","country":"USA"},"naics_codes":["238990"],"award":{"date":"2025-01-13","amount":"100000","number":"140L6225P0008","awardee":{"raw":"INDIAN SPRINGS WORKING RANCH LLC 649 E CENTRAL AVE Eagar AZ 85925 USA","uei":"MUE6PNRMM4Y5","cage":"9FV09","name":"INDIAN SPRINGS WORKING RANCH LLC","location":{"zip":"85925","city":{"code":"20960","name":"Eagar"},"state":{"code":"AZ","name":"Arizona"},"street":"649 E CENTRAL AVE","country":{"code":"USA","name":"UNITED STATES"}}}},"attachments":[{"resource_id":"b013130160904229bf908241e456949b","name":"Attachment_3-_Maps.pdf","kind":"file","mime_type":".pdf","size_bytes":797384,"posted_at":"2024-12-13T20:48:09.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b013130160904229bf908241e456949b/download","mirrored":false},{"resource_id":"9153eb0c42234872bdedc731740abdaa","name":"Attachment_2-_Bid_Schedule.pdf","kind":"file","mime_type":".pdf","size_bytes":101910,"posted_at":"2024-12-13T20:48:09.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9153eb0c42234872bdedc731740abdaa/download","mirrored":false},{"resource_id":"5286414867c24b958378ee1193a80c02","name":"Attachment_1-_Statement_of_Work.pdf","kind":"file","mime_type":".pdf","size_bytes":566360,"posted_at":"2024-12-13T20:48:09.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5286414867c24b958378ee1193a80c02/download","mirrored":false},{"resource_id":"032f837b366a4f8f8f3c84b3f31280c0","name":"Attachment_7-__Limitations_on_Subcontracting_Breakout.pdf","kind":"file","mime_type":".pdf","size_bytes":153943,"posted_at":"2024-12-13T20:48:09.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/032f837b366a4f8f8f3c84b3f31280c0/download","mirrored":false},{"resource_id":"35c6977c75be4faa9a26abb8b6f4716e","name":"Attachment_6-_SF_1442_Completion_Instructions.pdf","kind":"file","mime_type":".pdf","size_bytes":198368,"posted_at":"2024-12-13T20:48:09.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/35c6977c75be4faa9a26abb8b6f4716e/download","mirrored":false},{"resource_id":"6ebfd740ec804c159478290fd327c07e","name":"Attachment_5-_Drawings.pdf","kind":"file","mime_type":".pdf","size_bytes":238541,"posted_at":"2024-12-13T20:48:09.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6ebfd740ec804c159478290fd327c07e/download","mirrored":false},{"resource_id":"4136edf0cc914834a7a1b4c30d78b69e","name":"Attachment_4-_Wage_Determination_WY20240031.pdf","kind":"file","mime_type":".pdf","size_bytes":64160,"posted_at":"2024-12-13T20:48:09.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4136edf0cc914834a7a1b4c30d78b69e/download","mirrored":false},{"resource_id":"d710fb6404764122bcc6671710cee17a","name":"Sol_140L6225Q0005.pdf","kind":"file","mime_type":".pdf","size_bytes":525458,"posted_at":"2024-12-13T20:48:09.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d710fb6404764122bcc6671710cee17a/download","mirrored":false},{"resource_id":"c619c633c59a4e569f4bc1c82b10174f","name":"Questions_Addressed-_140L6225Q0005_0001.docx","kind":"file","mime_type":".docx","size_bytes":296896,"posted_at":"2024-12-31T16:32:23.698Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c619c633c59a4e569f4bc1c82b10174f/download","mirrored":false},{"resource_id":"7a1ed6dca29a4fa0921600a8402af99f","name":"Sol_140L6225Q0005_Amd_0001.pdf","kind":"file","mime_type":".pdf","size_bytes":93192,"posted_at":"2024-12-31T16:32:23.698Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7a1ed6dca29a4fa0921600a8402af99f/download","mirrored":false},{"resource_id":"59e3634649d3463ebced216105907087","name":"Questions_Addressed-_140L6225Q0005_0002.docx","kind":"file","mime_type":".docx","size_bytes":19727,"posted_at":"2025-01-10T21:54:45.629Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/59e3634649d3463ebced216105907087/download","mirrored":false},{"resource_id":"6be0393a981b4517baafd90fc02f115b","name":"Sol_140L6225Q0005_Amd_0002.pdf","kind":"file","mime_type":".pdf","size_bytes":93207,"posted_at":"2025-01-10T21:54:45.629Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6be0393a981b4517baafd90fc02f115b/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_140L6225P0008_1422_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_140L6225P0008_1422_-NONE-_-NONE-/","piid":"140L6225P0008","parent_piid":null,"award_type":"PURCHASE ORDER","vendor_key":"MUE6PNRMM4Y5","recipient_name":"INDIAN SPRINGS WORKING RANCH LLC","recipient_uei":"MUE6PNRMM4Y5","recipient_cage":"9FV09","recipient_city":"EAGAR","recipient_state":"AZ","sub_name":"Bureau of Land Management","office_name":"WYOMING STATE OFFICE","office_key":"o-140L62","first_action_date":"2025-01-13","last_action_date":"2025-01-13","actions":1,"obligated":"100000.00","current_total_value":"100000.00","potential_total_value":"100000.00","naics":"238990","psc":"Y1PZ","extent_competed":"COMPETED UNDER SAP","set_aside":"SMALL BUSINESS SET ASIDE - TOTAL","offers_received":24,"description":"IRA NEW FORK RIVER, SHEEP FENCE - CONVERT APPROXIMATELY 3.52 MILES EXISTING BARBED WIRE FENCE TO A WILDLIFE FRIENDLY FENCE.","method":"piid","confidence":"high","evidence":["award number 140L6225P0008 equals the contract number","same awarding office 140L62"],"opportunity_key":null,"opportunity_title":null}],"related":[],"similar_open":[{"key":"2027TYNDALLGATR15","latest_notice_id":"12fcfc711496424997c41223aecc8bff","title":"Sources sought GATR grounding","solicitation_number":"2027TYNDALLGATR15","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-11-27T20:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA4819","office_name":"FA4819 325 CONS PKP","naics":"238990","psc":"Y1BG","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"N4008527NORFPGREATLAKESROICC5395","latest_notice_id":"2e3f6b5013164071b01ff8e72cc9ebcf","title":"Investigation, Repairs, and Removal and Disposal of Marine Attachments to Raw Water Intake","solicitation_number":"N40085-27-NORFP-GREAT-LAKES-ROICC-5395","notice_type":"r","first_type":"r","first_posted":"2026-11-04","last_posted":"2026-11-04","notices":1,"due_at":"2026-11-30T19:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N40085","office_name":"NAVFACSYSCOM MID-ATLANTIC","naics":"238990","psc":"Z2NZ","set_aside":null,"state":"IL","county":"17097","county_name":"Lake County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-05T04:36:35.392694Z"},{"key":"SP470327Q0004","latest_notice_id":"17d74d55f88145b98e25a59e35a337a2","title":"Door Repair IDPO; Defense Supply Center Richmond(DSCR)","solicitation_number":"SP470327Q0004","notice_type":"p","first_type":"p","first_posted":"2026-11-05","last_posted":"2026-11-16","notices":3,"due_at":"2026-12-03T22:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SP4703","office_name":"DCSO RICHMOND DIVISION #1","naics":"238990","psc":"Z1PZ","set_aside":"SBA","state":"VA","county":"51041","county_name":"Chesterfield County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"}],"similar_open_total":20,"indexable":false}