Solicitation, total small business set-aside
WESTON HILLS 2024
140L6224R0008
Bureau of Land Management, Wyoming State Office. Highway, Street, and Bridge Construction.
Response deadline
August 19, 2024 at 4:00 PM EDT
Closed 829 days ago. Posted July 30, 2024. Scheduled to archive September 3, 2024.
Get the next one like this from Bureau of Land Management by email, the day it is posted.Find my opportunities
This one closed in 2024
36 like it are open now in highway, street, and bridge construction
- CO OMAD 300(71) Minuteman Missile Access
Federal Highway Administration, 6982AF Central Federal Lands Divisi
SolicitationSmall businessNAICS 237310Cheyenne, WY6982AF27B000010Due in 6 daysDec 2 - Access Road Repair National Elk Refuge
Departmental Offices, FWS Contracting Activity
SolicitationSmall businessNAICS 237310Wyoming140FF027Q0030Closes in 18 daysDec 14 - AL-WHEELER NWR-WATERMAN GATE
Departmental Offices, FWS Contracting Activity
SolicitationNAICS 237310Ship to the buyer140FF027Q0077Due tomorrowNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 20 days from the day the solicitation was posted, July 30, 2024, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Furnishing labor, equipment, supplies, and materials to perform ditch blading (75 feet), install one eighteen (18) inch CMP culvert 25 ft. in length. Repair existing 10 water bars, screen and stockpile 150 cubic yards of in-situ borrow with a 3 inch minus screen. Rejected aggregate greater than 3 inches can remain at the borrow site. The stockpiled aggregate will also be at the borrow site. The contractor shall provide at least one week notice to the BLM before starting work on the road. The road has aggregate surfacing. A Pre-award site visit will occur at the Weston Road.
Location: Work under this Contract is in Campbell County, Wyoming. Weston Hills road entrance: 44.6371, -105.33629 Weston Hills In-situ borrow area and stockpile area: 44.63858, -105.38081. Weston Hills 18¿ CMP culvert installation and ditch blading: 44.64308, -105.38584 Existing water bars repair, TBD upon pre-bid site visit.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 30, 2024
Solicitation
Due August 19, 2024 at 4:00 PM EDT. SAM.gov, notice aa3bea4d05e84659bc28bdddb8c808f7
Points of contact
- Le, Huonghle@blm.gov0000000000