Solicitation, first published as sources sought
GAOA Taos Area Visitors Centers
140L0625R0010
Bureau of Land Management, National Operations Center. Commercial and Institutional Building Construction.
Response deadline
July 9, 2025 at 4:00 PM EDT
Closed 505 days ago. Posted June 30, 2025, first published March 14, 2025. Scheduled to archive July 24, 2025.
Get the next one like this from Bureau of Land Management by email, the day it is posted.Find my opportunities
This one closed in 2025
184 like it are open now in commercial and institutional building construction
- FY27 NRM - VISN Base Modernize Nurse Call - 539-23-101
Department of Veterans Affairs, 250-Network Contract Office 10
PresolicitationSDVOSBNAICS 236220Location not published36C25027B0009Due in 4 daysNov 30 - FY27 NRM - VISN Base Install Roof Equipment Railings - 539-22-206
Department of Veterans Affairs, 250-Network Contract Office 10
PresolicitationSDVOSBNAICS 236220Location not published36C25027B0008Due in 4 daysNov 30 - N4008426R7500 DB RMAC FACILITY IMPROVEMENT AT NETDC, SAN ANTONIO, ZAMBALES, PHILIPPINES
Department of the Navy, Navfacsyscom FAR East
SolicitationNAICS 236220Outside the USN4008426R7500Due in 5 daysDec 1
All 184 open in commercial and institutional building construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 30 days from the day the solicitation was posted, June 9, 2025, to the deadline. The deadline moved 2 times: it was first March 28, 2025 and ended as July 9, 2025.
- Before the solicitation
- The agency published a sources sought on March 14, 2025, 87 days before the solicitation.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 25R0010_Schematic_Design_WRVC_DRAFT_1.pdf5.4 MB, March 14, 2025
- Attachment_2B_Specification_Drawings_WRVC.pdf19.1 MB, June 9, 2025
- B01_PreSolNotice_2.pdf102 KB, May 1, 2025
- 25R0010_Schematic_Design_RGGVC_DRAFT_1.pdf6.3 MB, March 14, 2025
- Attachment_2A_Specification_Drawings_RGGVC.pdf18.1 MB, June 9, 2025
- 25R0010_Performance_Specs_WRVC_DRAFT_1.pdf25.7 MB, March 14, 2025
- Attachment_1_Statement_of_Work_RGGVC_and_WRVC.pdf10.7 MB, June 9, 2025
- 25R0010_Performance_Specs_RGGVC_DRAFT_1.pdf20.2 MB, March 14, 2025
- Attachment_8_Request_for_Information_Form.xlsx10 KB, June 9, 2025
- 25R0010_SOW_WRVC_DRAFT_1.pdf11.3 MB, March 14, 2025
- Attachment_6_BLM_Codes_and_Standards.pdf1.2 MB, June 9, 2025
- 25R0010_SOW_RGGVC_DRAFT_1.pdf11.3 MB, March 14, 2025
- Attachment_5__Asbestos_Survey_WRVC.pdf7.1 MB, June 9, 2025
- 25R0010_Sources_Sought_Announcement_1.pdf113 KB, March 14, 2025
- Attachment_4B_Exsisting_Conditions_WRVC.pdf16.3 MB, June 9, 2025
- Attachment_3_Schematics_RGGVC_and_WRVC.pdf8.6 MB, June 9, 2025
- Attachment_4A_Exsisting_Conditions_RGGVC.pdf10.8 MB, June 9, 2025
- Attachment_7_Experience_ProjectDataSheet.docx16 KB, June 9, 2025
- Attachment_10_BLM_Example_Forms.pdf2.5 MB, June 9, 2025
- Attachment_9_Past_Performance_Questionnaire.docx28 KB, June 9, 2025
- Sol_140L0625R0010.pdf646 KB, June 9, 2025
- Attachment_12_Taos_Site-Visit_Roster_0001.pdf1.2 MB, June 30, 2025
- Attachment_11_QuesAns_1_26Jun_0001.pdf97 KB, June 30, 2025
- SF30_ContPages_AM01_0001.docx243 KB, June 30, 2025
- Sol_140L0625R0010_Amd_0001.pdf86 KB, June 30, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 14, 2025
Sources sought
Due March 28, 2025 at 4:00 PM EDT. SAM.gov, notice d0b6a4a394d84220995836aa081dd5f4
3 revisions on SAM
- June 9, 2025: publish, solicitation
- May 1, 2025: publish, presolicitation
- March 14, 2025: publish, sources sought
May 1, 2025
Presolicitation, originally sources sought
Due May 15, 2025 at 5:00 PM EDT. SAM.gov, notice a65234f6603c4753a945d612ddfa2d3a
2 revisions on SAM
- May 1, 2025: publish, presolicitation
- March 14, 2025: publish, sources sought
June 9, 2025
Solicitation, originally sources sought
Due July 9, 2025 at 4:00 PM EDT. SAM.gov, notice 84d70a864d38449694f3e52e421646c6
3 revisions on SAM
- June 30, 2025: publish, solicitation
- June 9, 2025: publish, solicitation
- March 14, 2025: publish, sources sought
June 30, 2025
Solicitation
Due July 9, 2025 at 4:00 PM EDT. SAM.gov, notice 4b872f3428774782bc51ca18f362be5d
3 revisions on SAM
- June 30, 2025: publish, solicitation
- June 9, 2025: publish, solicitation
- March 14, 2025: publish, sources sought
Points of contact
- Hicks, Kassandrakhicks@blm.gov9186794674