Sources sought, total small business set-aside, first published as solicitation
OR-KLAMATH FALLS FWO-PHASE 5 CONSTRUCTION
140FC324R0008
US Fish and Wildlife Service, Fws, Construction A/E Team 3. Other Heavy and Civil Engineering Construction.
Response deadline
April 29, 2024 at 3:00 PM EDT
Closed 942 days ago. Posted April 8, 2024, first published April 8, 2024. Scheduled to archive June 3, 2024.
Get the next one like this from US Fish and Wildlife Service by email, the day it is posted.Find my opportunities
This one closed in 2024
143 like it are open now in other heavy and civil engineering construction
- JOHN DAY DAM UNIT 10 PACKING BOX REPLACEMENT
Department of the Army, W071 Endist Portland
Due in 7 daysDec 4 - Bonneville Powerhouse II Unwatering Pump Replacement
Department of the Army, W071 Endist Portland
SolicitationSmall businessNAICS 237990OregonW9127N27BA012Closes in 10 daysDec 7 - W9127N27BA005 Foster Spillway Gate Nut Replacements and Re-Tensioning
Department of the Army, W071 Endist Portland
SolicitationSmall businessNAICS 237990OregonW9127N27BA005Closes in 19 daysDec 16
All 143 open in other heavy and civil engineering construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 237990 (other heavy and civil engineering construction), means no more than $45 million in average annual receipts, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 21 days from the day the solicitation was posted, April 8, 2024, to the deadline. The deadline moved once: it was first May 3, 2024 and ended as April 29, 2024.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Klamath Falls New Hatchery Phase 5 will add earthen lined aquaculture ponds to the site to increase the capabilities of the sucker fish hatchery. This phase of the project includes a 0.30 acre earthen, lined pond for water storage known as the Head Pond, and up to three earthen, lined ponds for aquaculture with harvest kettle structures built into their berms, water supply, and drainage.
The aquaculture ponds will typically be 5 to 7 feet deep with berms that are 6 to 12 feet tall and vary in size from 1/12-acre to 1/2-acre. Supply pipelines, drainage pipelines and access roads will be constructed around each of the ponds. Phase 5 will also include re-routing of approximately 415 feet of 8-inch diameter geothermal supply (GS) pipeline.
Construction work needed to facilitate the project includes excavation, fill placement, grading, temporary erosion and sedimentation control, permanent seeding, pond liners, elevated bird predation netting system, cast-in-place concrete structures, paving and crushed rock road surfacing, pressurized pipelines for geothermal water distribution, and gravity pipelines for drainage. Through this sources sought, USFWS is also seeking industry feedback on the proposed design.
We are looking for industry recommended best practices that should be included in our design package and if there are any issues with the design that would present challenges to construction.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Garrigas, Christachrista_garrigas@fws.gov0000000000