Special notice
Industry Day Announcement for The Dalles transformers 9,10,11 repairs
Department of the Army, W071 Endist Portland. Electrical Contractors and Other Wiring Installation Contractors.
Response deadline
February 28, 2026 at 8:00 PM EST
Closed 270 days ago. Posted January 29, 2026, first published November 12, 2025. Scheduled to archive March 15, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2026
40 like it are open now in electrical contractors and other wiring installation contractors
- 541 Electrical Power Distribution Equipment Testing, Inspection, and Maintenance - VAMC Cleveland
Department of Veterans Affairs, 250-Network Contract Office 10
Combined synopsis and solicitationSmall businessNAICS 238210Cleveland, OH36C25027Q0014Due tomorrowNov 27 - Forest Service - Solar Batteries Frenchman Work Center
Forest Service, Usda-Fs, Csa Southwest 6
Combined synopsis and solicitationSmall businessNAICS 238210California127EAW27Q0002Due in 2 daysNov 28 - Request for Information/Market Intelligence Notice: Repair Electrical Distribution System Switchgear Stations & Addition of Redundancy Cable Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA)
Department of the Air Force, FA7060 11TH Contracting SQ PK
Sources soughtNAICS 238210District of ColumbiaFA706027R0001Due in 4 daysNov 30
All 40 open in electrical contractors and other wiring installation contractors
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
Description
As published on SAM.gov.
** Documents from Industry Day have been added to the Attachments Section.
RSVP due date NLT 1700 Pacific Standar Time on 28 February 2026
U.S. Army Corps of Engineers - Announcement from Portland District (NWP)
Repair of transformers 9, 10, and 11 for The Dalles Dam, OR.
This is a SPECIAL NOTICE and is for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION, OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2.
Notice Details: The U.S. Army Corps of Engineers (USACE), Portland District is hosting a one-hour virtual industry event at 0900 hours Pacific Standard Time (PST) on 29 January 2026 to provide a project update and to gather industry input as it evaluates project construction risks, industry capabilities, and strategies for the project below:
Firms who respond to this announcement with completed RSVP form and Survey form will be provided further details and a link to the virtual meeting. The Government will provide the presentation slides following the event. It is also requested each firm provide responses to a questionnaire to be launched at the conclusion of the event. Responses will be considered for use in the solicitation development.
Project Site Backgrounds/Scopes: The US Army Corps of Engineers (USACE) Portland District is searching for Heavy and Civil Engineering Construction Contractors who can provide construction services for The Dalles Dam. The Dalles T9, T10, and T11 transformers are identical 230,000/132,790-13200 Volt, 233,000 kVA class FOA three-phase transformers manufactured by General Electric’s Pittsfield, Massachusetts facility in 1972. The T10 transformer was forced out of service in 2018 due to a failed high-voltage neutral conductor internal to the tank between the H1 and H2 windings. All three transformers are located outside on the powerplant intake deck on the Columbia River.
A previous identical transformer, T8, also failed in the same manner in 2016 and was dissected during a forensic teardown for root-cause of failure. The neutral conductor is housed in a support tube which reduces oil flow and leads to an eventual complete blockage as the neutral lead thermally upgraded Kraft insulating paper overheats and degrades. Loss of cooling oil further increases conductor temperature leading to an eventual mechanical failure during switching events. The proposed procurement will perform a repair of the failed T10 transformer and improve the neutral conductor support to improve cooling. Via the same action, perform the same improvements of the T9 and T11 transformers to prevent the in-service failure due to the neutral conductor design issue. If there is physical evidence of overheating, replace the neutral conductor.
Submission Instructions: To attend the virtual project overview presentations, interested parties should send an email to the points of contact (POC) below to request an invitation with the following information:
SUBJECT: Industry Event – The Dalles Transformer Repair 9-11
CONTENT: Firm name, CAGE code, and project role interest (e.g., prime contractor, subcontractor, etc.).
POCs (address to both):
- Jeff Garrison, Technical Lead, jeffery.e.garrison@usace.army.mil
- Joseph Jarvis, Contract Specialist, joseph.b.jarvis@usace.army.mil
Response due date/time: Requests are due to the POCs on or before 1700 Pacific Standar Time on 12 December 2025. The virtual meeting information will be sent out to responsive firms.
Disclaimer: This notice does not obligate the Government to award a contract. No reimbursement will be made for any costs associated with participating in the event, providing information in response to this Special Notice, or any follow up information. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. The Government is not obligated to acknowledge receipt of the information received or to provide feedback to respondents with respect to any information submitted.
Event Details:
📅 Date: Wednesday, January 29th, 2026
📍 Location: Microsoft TEAMs (link sent when RSVP form received)
🕘 Time: 9:00 AM – 3:00 PM PST
What to Expect:
- Project overview and scope of work
- Environmental and safety considerations
- Breakout Q&A sessions with USACE staff upon request
- Networking with peers and program leadership
We look forward to your participation and to strengthening our partnerships with industry.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 1. Industry Day RSVP Form Template.pdf3.8 MB, November 12, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
November 12, 2025
Special notice
Due December 12, 2025 at 8:00 PM EST. SAM.gov, notice 13b2aa4b85624aeba88e8d101715bc68
5 revisions on SAM
- January 29, 2026: publish, special notice
- January 8, 2026: publish, special notice
- November 17, 2025: publish, special notice
- November 12, 2025: publish, special notice
- November 12, 2025: publish, special notice
November 12, 2025
Special notice
Due December 12, 2025 at 8:00 PM EST. SAM.gov, notice 9b362c0941704556abdcdb8474035302
5 revisions on SAM
- January 29, 2026: publish, special notice
- January 8, 2026: publish, special notice
- November 17, 2025: publish, special notice
- November 12, 2025: publish, special notice
- November 12, 2025: publish, special notice
November 17, 2025
Special notice
Due December 12, 2025 at 8:00 PM EST. SAM.gov, notice 1a0a588e7506435cadade2a29e973b72
5 revisions on SAM
- January 29, 2026: publish, special notice
- January 8, 2026: publish, special notice
- November 17, 2025: publish, special notice
- November 12, 2025: publish, special notice
- November 12, 2025: publish, special notice
January 8, 2026
Special notice
Due January 28, 2026 at 8:00 PM EST. SAM.gov, notice 93ba53781fa849b99aa865924061b0ab
5 revisions on SAM
- January 29, 2026: publish, special notice
- January 8, 2026: publish, special notice
- November 17, 2025: publish, special notice
- November 12, 2025: publish, special notice
- November 12, 2025: publish, special notice
January 29, 2026
Special notice
Due February 28, 2026 at 8:00 PM EST. SAM.gov, notice d73a22c685924ac2841a01146bb2ea03
5 revisions on SAM
- January 29, 2026: publish, special notice
- January 8, 2026: publish, special notice
- November 17, 2025: publish, special notice
- November 12, 2025: publish, special notice
- November 12, 2025: publish, special notice
Points of contact
- Joseph B. Jarvisjoseph.b.jarvis@usace.army.mil
- Cory Pfenningcory.r.pfenning@usace.army.mil