# Tyler Dam Rehabilitation

Canonical: https://sealedbidder.com/opportunities/12fpc326b0012

- Solicitation number: 12FPC326B0012
- Notice type: Award notice (first published as combined synopsis and solicitation)
- Status: Awarded to Lucianos Excavation Inc. for $1,323,600.09
- Department: Department of Agriculture
- Agency: Farm Production and Conservation Business Center
- Contracting office: Fpac Bus Cntr-Acq Div (12FPAC)
- NAICS: 237990 Other Heavy and Civil Engineering Construction
- Product or service code: Y1QA Construction Of Restoration Of Real Property (Public Or Private)
- Set-aside: Total small business set-aside
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 237990)
- Place of performance: Massachusetts
- County: Middlesex County (FIPS 25017). https://sealedbidder.com/counties/middlesex-county-ma-25017
- City: Marlborough. https://sealedbidder.com/cities/marlborough-ma-2538715
- First posted: May 19, 2026
- Last posted: October 5, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/1cccbad7c64b464fa3554f28d27c8734/view

## Reading this notice

- Kind of notice: Award notice. Who won, when, and for how much.
- Who may compete: Total small business set-aside. Only small businesses may compete. Small, under NAICS 237990 (other heavy and civil engineering construction), means no more than $45 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders had 37 days from the day the solicitation was posted, May 19, 2026, to the deadline. The deadline moved 2 times: it was first June 19, 2026 and ended as June 25, 2026.
- How it ended: Awarded to Lucianos Excavation Inc. on September 21, 2026, 88 days after offers were due. The contracting office reported 4 offers (competed under simplified acquisition procedures).

## Description

Please see Tyler Dam Addendum No. 1 in the attachments/links section for further details and updates.

Tyler Dam Rehabilitation Worchester County, MA

Site Showing on:

Wednesday, May 27ᵗʰ at 10:00 AM at the site

200 Robin Hill Street

Marlborough, MA 01752

The work consists of rehabilitating the existing dam to be in compliance with current safety and performance standards. Engineering studies identified that the dam has inadequate auxiliary spillway capacity that would result in overtopping and breaching of the embankment during the probable maximum flood. The major items of work include: excavating the approach channel upstream

of the auxiliary spillway drop structure by 2.5 feet to improve flow efficiency; installing a geosynthetic clay liner in the auxiliary spillway approach; raising portions of the dam embankment crest to provide additional freeboard and create a uniform crest elevation; constructing a concrete crest wall to provide freeboard and prevent overtopping at a low spot where Robin Hill Street

intersects the top of dam; replacing concrete joint sealant above the waterline in the auxiliary spillway and in the principal spillway conduit; replacing existing chain-link fencing surrounding the auxiliary spillway drop structure; and removing trees within 20 feet of the right upstream embankment groin.

## Attachments

- [IFB - 12FPC326B0012 Combined Synopsis.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4af3115e9311400cab13aef6a9961b7d/download)
- [Attachment 3 - WD MA20250006 1-30-2026.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/47567e2a0d9f48028482b563029d0570/download)

## Award on USAspending

- Recipient: Lucianos Excavation Inc. (UEI KMKAHKFB79M3)
- Contract: 12FPC326C0009, definitive contract
- Obligated: $1,323,600.00
- Competition: Competed Under SAP, 4 offers received
- Link: solicitation number 12FPC326B0012 equals the FPDS solicitation identifier; same sub-agency 12D0 (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_12FPC326C0009_12D0_-NONE-_-NONE-/


## Open now in the same industry

144 open in NAICS 237990.

- East Bulkhead Replacement, East Boat Basin, Cape Cod Canal, Sandwich MA (W912WJ27BA005), due December 1, 2026 at 1:00 PM EST. https://sealedbidder.com/opportunities/w912wj27ba005
- Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island. (W912WJ27X1CUP), due December 3, 2026 at 1:00 PM EST. https://sealedbidder.com/opportunities/w912wj27x1cup
- CONS: 807CM3026 Crown Hill NC - Stormwater Infrastructure Improvements (VA-26-00082593) (36C78626B0031), due November 25, 2026 at 11:00 AM EST. https://sealedbidder.com/opportunities/36c78626b0031

## Publications

- May 19, 2026: Combined synopsis and solicitation, due June 19, 2026 at 1:00 PM EDT. Notice 765d4d1f291247d3be06016751e4b1d1. https://sam.gov/workspace/contract/opp/765d4d1f291247d3be06016751e4b1d1/view
- May 20, 2026: Combined synopsis and solicitation, due June 18, 2026 at 1:00 PM EDT. Notice 8eb83b2ee91b4b8b997bba01f3437005. https://sam.gov/workspace/contract/opp/8eb83b2ee91b4b8b997bba01f3437005/view
- June 11, 2026: Combined synopsis and solicitation, due June 25, 2026 at 1:00 PM EDT. Notice 007f0ef1aa00414482600c2a9436503f. https://sam.gov/workspace/contract/opp/007f0ef1aa00414482600c2a9436503f/view
- June 11, 2026: Combined synopsis and solicitation, due June 25, 2026 at 1:00 PM EDT. Notice 58f98c934ea44c4fb89961ebfbcf6b54. https://sam.gov/workspace/contract/opp/58f98c934ea44c4fb89961ebfbcf6b54/view
- June 25, 2026: Combined synopsis and solicitation, due June 25, 2026 at 1:00 PM EDT. Notice 01d055d827c84725aa1e9d3a9e130aea. https://sam.gov/workspace/contract/opp/01d055d827c84725aa1e9d3a9e130aea/view
- October 5, 2026: Award notice. Notice 1cccbad7c64b464fa3554f28d27c8734. https://sam.gov/workspace/contract/opp/1cccbad7c64b464fa3554f28d27c8734/view

## Points of contact

- Mark Domingo, mark.domingo@usda.gov

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/12fpc326b0012.
