Combined synopsis and solicitation, total small business set-aside
GREAT ONYX JC KENTUCKY LAGOON AERATION IMPROVEMENTS
12970224Q0007
Forest Service, USDA Forest Service-Spoc SW. Water and Sewer Line and Related Structures Construction.
Response deadline
March 13, 2024 at 1:00 PM EDT
Closed 987 days ago. Posted February 29, 2024, first published February 21, 2024. Scheduled to archive March 28, 2024.
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one closed in 2024
25 like it are open now in water and sewer line and related structures construction
- Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP)
Department of the Army, W072 Endist Louisville
Closes in 19 daysDec 14 - HAVO 326181 Rehabilitate Rainshed&Water Treatment
National Park Service, DSC Contracting Services Division
SolicitationNAICS 237110Hawaii140P2026R0091Due in 3 daysNov 28 - New Meadows Range Barn
Forest Service, Payette National Forest
Combined synopsis and solicitationSmall businessNAICS 237110Idaho1240LT27Q0027Due in 4 daysNov 29
All 25 open in water and sewer line and related structures construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 237110 (water and sewer line and related structures construction), means no more than $45 million in average annual receipts, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 21 days from the day the solicitation was posted, February 21, 2024, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized as follows:
1. Furnish and install 480V, 3 PH, 30A feeder from existing panelboard to proposed aeration equipment disconnects.
2. Furnish and install 480V, 3PH, 30A disconnect, including grounding system, post, pipe bollards, and conduits.
3. Furnish and install microbubble lagoon aeration system consisting of the following:
a. Control panel with individual motor overload protection circuit breakers.
b. Self-contained floating microbubble aerators cord connected to control panel with tethers and anchors (4 each).
4. Locate private and utility owned buried electrical lines in the area of work and provide location on as-built plans with reference measurements to existing infrastructure.
5. Furnish third-party inspection of electrical work included in this contract. The project Schedule of Items includes a section to organize the work into Base Items.
1. Provide pricing for all items listed in the Schedule of Items.
2. Contract award will be made for all Base Items.
3. Optional Items may or may not be awarded, depending on fund availability. Base Items 1. Base Item No. 0001 – Lagoon Aeration a. Measurement: This item is measured as a Lump Sum quantity.
2. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to:
a. Furnish and install 480V, 3 PH, 30A disconnect, including grounding system, post, pipe bollards, and conduits.
b. Furnish and install 480V, 3PH, 30A disconnect, including grounding system, post, pipe bollards, and conduits.
c. Furnish and install microbubble lagoon aeration system consisting of the following:
1. Control panel with individual motor overload protection circuit breakers.
2. Self-contained floating microbubble aerators cord connected to control panel with tethers and anchors (4 each) d. Locate private and utility owned buried electrical lines in the area of work and provide location on as-built plans with reference measurements to existing infrastructure. e. Furnish third-party inspection of electrical work included in this contract.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 21, 2024
Combined synopsis and solicitation
Due March 13, 2024 at 1:00 PM EDT. SAM.gov, notice a289dca877414169a3ad14c1502c5f3c
February 28, 2024
Combined synopsis and solicitation
Due March 13, 2024 at 1:00 PM EDT. SAM.gov, notice d0fe2ad204414cd7aa541db067dbf4ac
February 29, 2024
Combined synopsis and solicitation