Solicitation, total small business set-aside, first published as presolicitation
Chiller Replacement at US Salinity Laboratory (USSL) (Riverside, CA)
12905B25R0012
Agricultural Research Service, USDA ARS Afm Apd. Plumbing, Heating, and Air-Conditioning Contractors.
Awarded
Grainger Contracting and Services, LLC
$1,139,381.33 obligated so far on USAspending
Get the next one like this from Agricultural Research Service by email, the day it is posted.Find my opportunities
This one was awarded in 2025
57 like it are open now in plumbing, heating, and air-conditioning contractors
- BRINE MAINTENANCE SVC - Base +4 OY ($0.00) [605] | POP: 01/01/2027 - 12/31/2031
Department of Veterans Affairs, 262-Network Contract Office 22
Sources soughtSDVOSBNAICS 238220Loma Linda, CA36C26227Q0149Due tomorrowNov 27 - CA-SAN LUIS NWR-FIRE SYSTEM REHAB
Departmental Offices, FWS Contracting Activity
Combined synopsis and solicitationSmall businessNAICS 238220California140FF027Q0035Due in 4 daysNov 30 - Water Treatment Services
Department of Veterans Affairs, 262-Network Contract Office 22
SolicitationSDVOSBNAICS 238220Los Angeles, CA36C26227Q0121Due in 5 daysDec 1
All 57 open in plumbing, heating, and air-conditioning contractors
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 238220 (plumbing, heating, and air-conditioning contractors), means no more than $19 million in average annual receipts, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 48 days from the day the solicitation was posted, May 29, 2025, to the deadline. The deadline moved 2 times: it was first May 20, 2025 and ended as July 16, 2025.
- Before the solicitation
- The agency published a presolicitation on May 5, 2025, 24 days before the solicitation.
- How it ended
- Awarded to Grainger Contracting and Services, LLC on August 14, 2025, 29 days after offers were due. The contracting office reported 10 offers (full and open competition after exclusion of sources).
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
***AMENDMENT 0002*** (See attached SF30)
The purpose of this amendment is to:
1. Provide Questions and Answers, see attached.
2. Extend the proposal submission due date to 3:00 PM EST on July 16, 2025.
###
***AMENDMENT 0001*** (See attached SF30)
The purpose of this amendment is to provide a copy of the Site Visit Sign-In Sheet (see attached);
###
The United States Department of Agriculture (USDA) Agricultural Research Service (ARS) U.S. Salinity Laboratory (USSL) requires that all labor, supervision, tools, and materials be provided for disconnect and removal of the existing evaporative cooler, chiller, cooling tower and pumps. Install new breakers in existing switchboard and provide two new chillers and all related appurtenant devices, and incidental related work. All work shall be performed in accordance with the specifications, drawings, and other attachments for this requirement. The project is located at USDA, ARS, USSL at 450 W Big Springs Road, Riverside, CA 92507.
Magnitude of Construction Project is $500,000 to $1,000,000.
SITE VISIT: A single organized site visit has been scheduled for 10:00 a.m. Pacific Time on Wednesday June 11, 2025. See clause L.6 Site Visit for more information and RSVP instructions.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 01-Chiller Replacement_DRAWINGS_IFC Submittal.pdf2.4 MB, May 5, 2025
- Attachment 7 ARS-372 - CONTRACTOR REQUEST FOR PAYMENT TRANSMITTAL.pdf30 KB, May 29, 2025
- 03-Chiller Replacement_SPECS_IFC Submittal.pdf932 KB, May 5, 2025
- Attachment 6 ARS-371 - CONSTRUCTION PROGRESS AND PAYMENT SCHEDULE.pdf52 KB, May 29, 2025
- Attachment 5 DOL WD CA20250025_03282025.pdf72 KB, May 29, 2025
- Attachment 4 Drawings.pdf2.4 MB, May 29, 2025
- Attachment 3 Specifications.pdf932 KB, May 29, 2025
- Attachment 2 Contract Line-Item Breakdown Form Excel .xlsx10 KB, May 29, 2025
- Attachment 1 SF1442 Provisions_Clauses.pdf536 KB, May 29, 2025
- Site Visit Sign-In Sheet.pdf1.1 MB, June 11, 2025
- SF30_12905B25R0012_0001.pdf570 KB, June 11, 2025
- Questions and Answers_12905B25R0012.pdf771 KB, June 26, 2025
- SF30_12905B25R0012_0002.pdf569 KB, June 26, 2025
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- UEI
- EWT1YS4HR333
- CAGE
- 7MUY3
- Vendor location
- Marietta, GA
- Contract
- 1232SA25C0018, definitive contract
- Obligated
- $1,139,381.33
- Actions
- 4 between August 14, 2025 and April 22, 2026
- Competition
- Full and Open Competition After Exclusion of Sources, 10 offers received
- Set-aside reported
- Small Business Set Aside - Total
- Described as
- Labor and Materials to Replace the Chiller at Usda-Ars-Riverside, California
- Match
- solicitation number 12905B25R0012 equals the FPDS solicitation identifier; same awarding office 1232SA (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 5, 2025
Presolicitation
Due May 20, 2025 at 12:00 PM EDT. SAM.gov, notice b4b338a8f1ae4b5aaaf2035a252286cf
2 revisions on SAM
- May 7, 2025: publish, presolicitation
- May 5, 2025: publish, presolicitation
May 7, 2025
Presolicitation
Due May 20, 2025 at 12:00 PM EDT. SAM.gov, notice 6e21f2182d8a4f15b654fcd2e505f2f2
3 revisions on SAM
- May 7, 2025: publish, presolicitation
- May 29, 2025: publish, solicitation
- May 5, 2025: publish, presolicitation
May 29, 2025
Solicitation, originally presolicitation
Due July 2, 2025 at 3:00 PM EDT. SAM.gov, notice 7535086a5bee4ce7bd2a8815e381e8e2
4 revisions on SAM
- June 26, 2025: publish, solicitation
- June 11, 2025: publish, solicitation
- May 7, 2025: publish, presolicitation
- May 29, 2025: publish, solicitation
June 11, 2025
Solicitation
Due July 2, 2025 at 3:00 PM EDT. SAM.gov, notice 204938ef20424c3194fa575edceb9d9e
4 revisions on SAM
- June 26, 2025: publish, solicitation
- June 11, 2025: publish, solicitation
- May 7, 2025: publish, presolicitation
- May 29, 2025: publish, solicitation
June 26, 2025
Solicitation
Due July 16, 2025 at 3:00 PM EDT. SAM.gov, notice 37c6a3102a4648daa09bac88da0bb8de
4 revisions on SAM
- June 26, 2025: publish, solicitation
- June 11, 2025: publish, solicitation
- May 7, 2025: publish, presolicitation
- May 29, 2025: publish, solicitation
Points of contact
- Spencer Hamiltonspencer.hamilton@usda.gov