# Buffalo Creek Work Center Office & Engine Storage Additions

Canonical: https://sealedbidder.com/opportunities/1282b125r0021

- Solicitation number: 1282B125R0021
- Notice type: Solicitation
- Status: Awarded to Iicon Construction Colorado, LLC
- Department: Department of Agriculture
- Agency: Forest Service
- Contracting office: USDA Forest Service-Spoc Im (1282B1)
- NAICS: 236220 Commercial and Institutional Building Construction
- Product or service code: Z2AA Repair Or Alteration Of Office Buildings
- Set-aside: Total small business set-aside
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 236220)
- Place of performance: Buffalo Creek, Colorado
- County: Jefferson County (FIPS 08059). https://sealedbidder.com/counties/jefferson-county-co-08059
- First posted: May 20, 2025
- Last posted: July 14, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/d4a2d79dea6147608bfd2f83756500a7/view

## Reading this notice

- Kind of notice: Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline.
- Who may compete: Total small business set-aside. Only small businesses may compete. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders had 58 days from the day the solicitation was posted, May 20, 2025, to the deadline. The deadline moved 2 times: it was first June 24, 2025 and ended as July 17, 2025.
- How it ended: Awarded to Iicon Construction Colorado, LLC on August 20, 2025, 34 days after offers were due. The contracting office reported 5 offers (full and open competition after exclusion of sources).

## Description

JULY 14, 2025: POSTING OF AMENDMENT 0003 (A0003_BCWC). READ IN ITS ENTIRETY. SEE THE ATTACHMENTS/LINKS.

JUNE 24, 2025: POSTING OF AMENDMENT 0002 (A0002_BCWC). READ IN ITS ENTIRETY. SEE THE ATTACHMENTS/LINKS.

JUNE 23, 2025: POSTING OF AMENDMENT 0001 (A0001_BCWC). READ IN ITS ENTIRETY. SEE THE ATTACHMENTS/LINKS.

May 22, 2025:  Due to the large file size of Attachment 7 - Drawings 5 of 7 Elec, the file was not able to be opened by some contractors.  To resolve this issue, this attachment has been reduced in size and separated into two files.  They are now  uploaded in the Attachment/Links as "Reduced_ Attach 7a- Drawings 5 of 7 Elec" and "Reduced_Attach 7b - Drawings 5 of 7 Elec".  Please use these two reduced files (Reduced _Attach 7a and Reduced_Attach 7b) instead of the initial Attach 7 -Drawings 5 of 7 Elec.  Also, Attachment 12 - A and E Report BCWC has been reduced in size so that it may be opened without issues. This is still one attachment; however, it has been reduced in file size. It has also been uploaded to the Attachment/Links and can be found as "Reduced_Attach 12 - A and E Report BCWC".  Please use this document instead of the initial document, Attach 12 - A and E Report BCWC.  All information remained the same in the reduced attachments. Should you have questions, contact both of the following via email: Janice King at janice.king@usda.gov and Lucas Dahlman at lucas.dahlman@usda.gov.

PROJECT:  BUFFALO CREEK WORK CENTER OFFICE & ENGINE STORAGE ADDITIONS

**SEE THE SOLICITATION and ATTACHMENTS in the ATTACHMENTS/LINKS for more details and the SITE VISIT***

(Due to file size, the Drawings have been included as Attachments 3 - 9 and the Specifications as Attachments 10a -10 i).

An asset of the Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands (PSICC) South Platte Ranger District (RD), the Buffalo Creek Work Center was built in 1938 by the Works Projects Administration and is located at 18046 County Road 126, Buffalo Creek, CO 80425. The Work Center of roughly 3&frac12; acres hosts several structures, including, but not limited to, the Office, Garage/Shop, and Dwelling constructed in 1938, and the Barracks and Engine Storage constructed in 2002, as well as several other miscellaneous structures and utility features. Like many historical buildings of this age, the office is very inefficient in terms of energy consumption and space utilization. Under this contract new office space and an additional engine bay space will be constructed as an addition to the existing Engine Storage building. Work in the base items includes mobilization; quality control; construction staking and layout; construction of site utilities for water, sewer, natural gas, power and telecommunications; final site grading; parking area construction; demolition of existing site features and utilities; and foundation, building, and mechanical/electrical/plumbing systems construction.

Incidental work includes submittals for quality control; submittals for safety and accident prevention; coordination with local utility companies; submittals for products and shop drawings; the construction schedule; construction waste management; operation and maintenance manuals, as well as system demonstration and training.

## Attachments

- [Attach 18_Buffalo Creek HazMat Report 032825.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d4ec467e75974716b646fdfd798080c2/download)
- [Attach 17 - WD_CO20250023 dated 05.16.2025.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/777e1f3113d44fb5b0350092989742c3/download)
- [Attach 16 - Survey.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d5f153c66d914435a4612ab68452351b/download)
- [Attach 15 - Materials Board.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bcd868ae5be2480286661a3da6fb526d/download)
- [Attach 14 - Guiding Principles.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/951c36fe74b340d68cba163ccc827f0b/download)
- [Attach 13 - Commissioning Plan.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8a0c79987c5546fe85515f2e0bead23c/download)
- [Attach 12 - A and E Report BCWC.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ea6d78e70fc74c5db9c34c095ff24c1e/download)
- [Attach 11 - Geotechnical Report.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d9171fe6afb84bbdb8befed0a965b0f0/download)
- [Attach 10 i_Parts 57-64 Specifications BCWC.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a5254b9fd6ab49ec89f3d336f3d81d89/download)
- [Attach 10 h_Parts 50 -56 Specifications BCWC.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/98060a93bae4483a96af4124a5f8e182/download)
- [Attach 10 g_Parts 44 -49 Specifications BCWC.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/591ac9e05c9540a3b244ef8f9a8342d4/download)
- [Attach 10 f_Parts 36 -43 Specifications BCWC.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9ed7959dcaf6477fad2db76574eb2b1b/download)
- [Attach 10 e_Parts 27 -35 Specifications BCWC.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b396488626dc4fa6ba2e39d4c91aeca6/download)
- [Attach 10 d_Parts 23 -26 Specifications BCWC.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7b3d57204d254b03b0394c5f499a949e/download)
- [Attach 10 c_Parts 16 -22 Specifications BCWC.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e8c4ac3248f3496d843daf1fa3aad56e/download)
- [Attach 10 b_Parts 11-15 Specifications BCWC.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bc5758de88d44044ad621f94d5f7a1a0/download)
- [Attach 10 a_Parts 1-10 Specifications BCWC.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/31f7ff9be65a4991a4d21f9c96806fd2/download)
- [Attach 9 - Drawings 7 of 7 Tech.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a1fff4ac4cd946ef98ced1a52688bf97/download)
- [Attach 8 - Drawings 6 of 7 Fire.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f512e373a5dd4241a1d45abcdd557870/download)
- [Attach 7 - Drawings 5 of 7 Elec.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/699bd970a92445789b67c1bd5786d4ea/download)
- [Attach 6 - Drawings 4 of 7 Mech_Plumb.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0fb19ba2094341968eadc98ac6564460/download)
- [Attach 5 - Drawings 3 of 7 Structural.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/558afe43f7424e63913879800b477264/download)
- [Attach 4- Drawings 2 of 7 Civil.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/63225be5b30c47f1899d01687d0505a6/download)
- [Attach 3 - Drawings 1 of 7 Arch.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7475c6f861fd4a6fb3ac1c002dce46a3/download)
- [Attach 2_Schedule of Items.xlsx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5902683099904a7d89a9dcfe476b007d/download)
- [Attach 1 SOW - Statement of Work.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/17ab899ae5d846d5acf9b61494f21034/download)
- [1282B125R0021_BCWC.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8d20e6032dd8422a8b4b94e068c51a70/download)
- [Reduced_Attach 7a - Drawings 5 of 7 Elec.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/dddea5ed63cc41979d44df235151e833/download)
- [Reduced_Attach 7b - Drawings 5 of 7 Elec.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b2da58245978425dbc2fa81b4e041dcc/download)
- [Reduced _Attach 12 - A and E Report BCWC.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c38f920ad1d2483fb7ba129dc34b8371/download)
- [A0001_BCWC.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/52f1acde242b43dfb46da7e1ce11f86b/download)
- [2022-10-12_R2 - CO_PKSI - BCWC_Existing Fence.jpg](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d1eadc1aee2845f1a3cf473a7266d737/download)
- [2022-12-29_R2 - CO_PKSI - BCWC_MEP Summary.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/75d167e166bb49938c409e7c8948f7da/download)
- [2024-10-10_R2 - CO_PKSI - BCWC_CORE Electric Construction Removal.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/40b7033b5d394d0688b7115edc3678df/download)
- [2024-10-10_R2 - CO_PKSI - BCWC_CORE Electric Construction Install.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8b16407341c64dee9d83f8ceb34d9749/download)
- [2024-01-01_R2 - CO_PKSI - BCWC_CORE Electric Builder Developer Service Requirements.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9ba66356679247ddb55af4b63eb168b5/download)
- [2023-06-05_R2 - CO_PKSI - BCWC_Water Wastewater Memo.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/321a3edc088844f3a0ce5ccf37f5f9a4/download)
- [Attach 03 - Updated Drawings_06.24.2025.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/21009f8bcecb48729cb0c8a74e66ba94/download)
- [Attach 10-Specifications Project Manual 06.24.25.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9f242e9e249c4b98962d7609e09571b4/download)
- [A0002_BCWC.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c55c69bc51d049149f6bd1ab1ebd7710/download)
- [A0002_SUMMARY OF CHANGES.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7d6c49bfe1b940859aea578297084fbc/download)

## Award on USAspending

- Recipient: Iicon Construction Colorado, LLC (UEI MRW1LEMJT5U5)
- Contract: 1240LT25C0016, definitive contract
- Obligated: $3,316,115.59
- Competition: Full and Open Competition After Exclusion of Sources, 5 offers received
- Link: solicitation number 1282B125R0021 equals the FPDS solicitation identifier; same sub-agency 12C2 (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_1240LT25C0016_12C2_-NONE-_-NONE-/


## Open now in the same industry

193 open in NAICS 236220.

- High Temp Hot Water Distribution System and Heat Plant Suite of Repairs to the US Air Force Academy COLORADO (W9128F27SM003), due December 14, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/w9128f27sm003
- Byron White Courthouse Rug Replacement (47PD5127Q9970), due December 15, 2026 at 5:00 PM EST. https://sealedbidder.com/opportunities/47pd5127q9970
- Department Of Energy - National Nuclear Security Administration Joint Cyber Facility Construction Solicitation (47PB5427R0003), due December 21, 2026 at 1:00 PM EST. https://sealedbidder.com/opportunities/47pb5427r0003

## Publications

- May 20, 2025: Solicitation, due June 24, 2025 at 11:00 AM EDT. Notice 156982583e3d4a079ac8a87528d78599. https://sam.gov/workspace/contract/opp/156982583e3d4a079ac8a87528d78599/view
- May 22, 2025: Solicitation, due June 24, 2025 at 11:00 AM EDT. Notice 0fc6bbc46fbe46449fb005145c94858f. https://sam.gov/workspace/contract/opp/0fc6bbc46fbe46449fb005145c94858f/view
- June 23, 2025: Solicitation, due July 15, 2025 at 11:00 AM EDT. Notice 94f612b0e73c4cc181ce13a4d3dbd638. https://sam.gov/workspace/contract/opp/94f612b0e73c4cc181ce13a4d3dbd638/view
- June 24, 2025: Solicitation, due July 15, 2025 at 11:00 AM EDT. Notice 2d25ef46c4ef4e72897f4592b1aa31b5. https://sam.gov/workspace/contract/opp/2d25ef46c4ef4e72897f4592b1aa31b5/view
- June 26, 2025: Solicitation, due July 15, 2025 at 11:00 AM EDT. Notice 491f8d48b07e42dd8d719da461070ba9. https://sam.gov/workspace/contract/opp/491f8d48b07e42dd8d719da461070ba9/view
- July 14, 2025: Solicitation, due July 17, 2025 at 11:00 AM EDT. Notice d4a2d79dea6147608bfd2f83756500a7. https://sam.gov/workspace/contract/opp/d4a2d79dea6147608bfd2f83756500a7/view

## Points of contact

- Janice King\, janice.king@usda.gov
- Lucas Dahlman, lucas.dahlman@usda.gov

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/1282b125r0021.
