Solicitation, total small business set-aside
LOWER BOOTH RIPRAP
1282B124Q0107
Forest Service, USDA Forest Service-Spoc Im. Highway, Street, and Bridge Construction.
Response deadline
September 3, 2024 at 5:00 PM EDT
Closed 814 days ago. Posted August 21, 2024. Scheduled to archive September 18, 2024.
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one closed in 2024
36 like it are open now in highway, street, and bridge construction
- AL-WHEELER NWR-WATERMAN GATE
Departmental Offices, FWS Contracting Activity
SolicitationNAICS 237310Ship to the buyer140FF027Q0077Due tomorrowNov 27 - W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation
Department of the Army, W07V Endist Rock Island
Presolicitation8(a)NAICS 237310MichiganW912EK27BA003Due in 4 daysNov 30 - NPS Repair or Alteration of Highways, Roads, Streets, Trails and Bridges Multip
Departmental Offices, National Park Service Contracting Activity
Sources soughtNAICS 237310Not tied to one place140PP027R0017Due in 4 daysNov 30
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 13 days from the day the solicitation was posted, August 21, 2024, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
This contract is for the furnishing, hauling and placement of South Dakota Class B riprap at four (4) designated locations on and near the dam as described in the Specifications and shown on the Drawings. Before the riprap is to be placed, minor excavation of the identified streambed and head-cut areas described in the Specifications and shown on the Drawings will occur and drainage fabric will be placed according to the Specifications and shown on the Drawings.
Additional South Dakota Class B riprap will be stockpiled at a location designated by the Government. After all ground disturbance activities have been completed, seeding and the placement of erosion control materials as described in the Specifications and shown on the Drawings will be the responsibility of the contractor. Work for the Lower Booth Dam Riprap project consists of the following:
Furnish, haul, and place South Dakota Class B ripap at four (4) designated locations on and near the dam as described in the Specifications and Shown on the Drawings. Furnish and place Type B Drainage Fabric under the riprap as described in the Specifications and Shown on the Drawings. Additional South Dakota Class B riprap will be stockpiled at a location designated by the Government. Excavate the streambed and head-cut areas as described in the Specifications and Shown on the Drawings. Seed and place erosion control materials at locations as described in the Specifications.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 21, 2024
Solicitation, originally presolicitation
Due September 3, 2024 at 5:00 PM EDT. SAM.gov, notice 97ab02f26348423aa71a92fd97f0e605
Points of contact
- Steven Dahlgrensteven.dahlgren@usda.gov
- JESSICA LYN H. RASMUSSENJESSICA.RASMUSSEN@USDA.GOV