Solicitation, total small business set-aside
Harpers Ferry Scaffolding
1282A724Q0047
Forest Service, Harpers Ferry Job Corps. Hardware Manufacturing.
Response deadline
August 30, 2024 at 12:00 PM EDT
Closed 817 days ago. Posted August 23, 2024, first published August 23, 2024. Scheduled to archive August 31, 2024.
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one closed in 2024
255 like it are open now in hardware manufacturing
- Sources Sought for Co-Brand Agreement for Door Hardware
Committee for Purchase from People Who Are Blind or Severely Disabled, U.S. Abilityone Commission
Sources soughtNAICS 332510Ship to Washington, DCCP-10-27-2026-01Due todayNov 25 - SPMYM227Q0231 FOLDING PARTITION
Defense Logistics Agency, DLA Maritime - Puget Sound
SolicitationSmall businessNAICS 332510Ship to Bremerton, WASPMYM227Q0231Due in 2 daysNov 27 - BRACKET,ANGLE
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationNAICS 332510Ship to the buyerSPE7L427U0165Due in 3 daysNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 332510 (hardware manufacturing), means no more than 750 employees, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 7 days from the day the solicitation was posted, August 23, 2024, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Qty 1 - This 1/3 Scale Scaffold Kit is available as a 4-High kit.
SFS-400 Kit Contains: (4) Mud Sills (wood) (4) Leveling Jacks (8) Frames (8) Diagonal X-Braces (5) Planks (wood) (2) Guard Rail Ends (2) Mid-rails (2) Handrails All connectors & pins Qty 1 - This 1/3 Scale Scaffold Kit is available as a starter kit.
TUBE & CLAMP STARTER KIT Contains: (20) 24" Tubes (4) 32" Tubes (18) Swivel Clamps (22) Rigid Clamps (4) Base Plates (4) Mudsills (5) Planks (uncleated) (1) Ladder Section Nut Driver Qty 1 - This 1/3 Scale Scaffold Kit is available as a 2-High, the frames come with connector pins installed.
LSF-200 Kit contains: (4) Mud Sills (wood) (4) Leveling Jacks (4) Frames (4) Diagonal X Braces (5) Planks (wood) (2) Guard Rail Ends (2) Mid-rails (2) Handrails 4 All connectors & pins Qty 1 - System Scaffolding, Ring and pin for use in the classroom. Over all 40" tall 25" X 22" System Scaffolding 1/3 scale starter kit.
(4) 2 Ring tubes (Vertical) (4) 4 Ring tubes (Vertical) (10) 23" Horizontal Tubes (10) 22.25" Horizontal Tubes (4) Vertical Braces with clamp ends Clamp On Ladder (2 section) (5) Planks (4) Screw Jacks (4) Mud Sills Qty 1 This 1/6 Scale Scaffolding Training Kit, the frames (11"X11") come with connector pins and comes complete from base plates to handrails.
1/6 Frame SFS-200 Kit Contains: (Build 2 high or 2 bays wide) (6) Mud Sills (wood) (6) Leveling Jacks (4) Frames (4) Diagonal X-Braces (10) Planks (wood) (2) Guard Rail Ends (2) Center posts (4) Mid-rails (4) Handrails Toe Boards All Connectors & pins
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Jeffrey Salyersjeffrey.r.salyers@usda.gov423-426-0188