Combined synopsis and solicitation, total small business set-aside
Punkin Center Window and Door Replacement
127EAX24Q039
Usda, Departmental Administration, Usda, Ocp-Pod-Acq-Mgmt-Branch-Ftc. Other Building Equipment Contractors.
Response deadline
September 12, 2024 at 5:00 PM EDT
Closed 805 days ago. Posted September 3, 2024, first published August 2, 2024. Scheduled to archive September 27, 2024.
Get the next one like this from Usda, Departmental Administration by email, the day it is posted.Find my opportunities
This one closed in 2024
17 like it are open now in other building equipment contractors
- JLM Roll Up Door Replacement
Department of Veterans Affairs, 256-Network Contract Office 16
Combined synopsis and solicitationSDVOSBNAICS 238290North Little Rock, AR36C25627Q0092Due in 4 daysNov 30 - Replace Elevators at FDC Miami
Federal Prison System / Bureau of Prisons, Fao
PresolicitationSmall businessNAICS 238290Miami, FL15BBNF26Q31000001Due in 7 daysDec 3 - 537-26-101 Construction of Ogden Elevator Cab Interiors Jesse Brown VA Medical Center
Department of Veterans Affairs, 252-Network Contract Office 12
Closes in 8 daysDec 4
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 238290 (other building equipment contractors), means no more than $22 million in average annual receipts, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 41 days from the day the solicitation was posted, August 2, 2024, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The Contractor shall provide all labor, materials, equipment, and tools, including incidentals, necessary to replace all the exterior windows and exterior doors at the Punkin Center Crew Quarters building on the Tonto Basin Ranger District. Replace Front Exterior Door includes all work necessary to remove and replace the front exterior door. The existing door, hinges, weather stripping and frame shall be removed and disposed of off National Forest lands.
Replacing the door shall include installing a left-inswing, steel exterior door, new door hinges, door frame, striker plates, deadbolt lock and lockable door handle. The exterior door shall be painted latex-based, exterior, semi-gloss white. The door frame shall be color matched to the exterior door trim (dark brown) and shall be latex exterior, semi-gloss type paint. The door shall have a deadbolt lock and lockable handle installed, keyed the same for the front and rear door locks.
Weather stripping shall be installed around the bottom of the door and door frame. Contractor shall verify dimensions prior to installation. Replace Rear Exterior Door includes all work necessary to remove and replace the front exterior door. The existing door, hinges, weather stripping and frame shall be removed and disposed of off National Forest lands.
Replacing the door shall include installing a left-inswing, steel exterior door, new door hinges, door frame, striker plates, deadbolt lock and lockable door handle. The exterior door shall be painted latex-based, exterior, semi-gloss white. The door frame shall be color matched to the exterior door trim (dark brown) and shall be latex exterior, semi-gloss type paint. The door shall have a deadbolt lock and lockable handle installed, keyed the same for the front and rear door locks.
Weather stripping 2 shall be installed around the bottom of the door and door frame. Contractor shall verify dimensions prior to installation. See statement of work for complete details.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Paige Francispaige.francis@usda.gov