{"canonical":"https://sealedbidder.com/opportunities/127eaw25r0031","key":"127EAW25R0031","url":"https://sealedbidder.com/opportunities/127eaw25r0031","title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","solicitation_number":"127EAW25R0031","notice_type":"a","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-06-20T18:00:00Z","first_posted":"2025-05-22","last_posted":"2025-08-26","department":"AGRICULTURE, DEPARTMENT OF","subagency":"FOREST SERVICE","office":"USDA-FS, CSA SOUTHWEST 6","naics":"237310","psc":"Z2LB","set_aside":"SBA","place_state":"CA","place_scope":"site","site":"San Bernardino National Forest","place_state_source":null,"place_evidence":null,"place_county":"06071","place_county_name":"San Bernardino County","place_city":"0606406","place_city_name":"Big Bear City","winner":"RODGERS, STEVEN R","award_amount":"89280.00","publications":[{"notice_id":"794de0af0ab34473b219be81d7c05bdf","title":"Line Fire BAER and Suppression Repair","solicitation_number":"127EAW25R0031","notice_type":"k","base_type":"k","posted":"2025-05-22","posted_at":"2025-05-22T12:21:12.673Z","due_at":"2025-06-13T17:00:00Z","due_date":"2025-06-13","cancelled":false,"archived":true,"archive_date":"2025-06-28","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/794de0af0ab34473b219be81d7c05bdf/view","enriched":true,"history":[{"index":6,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-13T18:54:34.242Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"a850d8de7d5b4201bc4e753a87eb234b","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":4,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-13T16:22:26.009Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"213a73bf26e4451a8e7fc3ecb57a3ebd","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":3,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-03T19:30:41.996Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"95dd164c3e9e41a5853799a767510488","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":2,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T15:42:01.155Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"3e63f330b96a4b969d3efede35be1ab5","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":1,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-22T12:21:12.673Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"794de0af0ab34473b219be81d7c05bdf","solicitation_number":"127EAW25R0031"}]},{"notice_id":"3e63f330b96a4b969d3efede35be1ab5","title":"Line Fire BAER and Suppression Repair","solicitation_number":"127EAW25R0031","notice_type":"k","base_type":"k","posted":"2025-05-29","posted_at":"2025-05-29T15:42:01.155Z","due_at":"2025-06-13T17:00:00Z","due_date":"2025-06-13","cancelled":false,"archived":true,"archive_date":"2025-06-28","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/3e63f330b96a4b969d3efede35be1ab5/view","enriched":true,"history":[{"index":6,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-13T18:54:34.242Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"a850d8de7d5b4201bc4e753a87eb234b","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":4,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-13T16:22:26.009Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"213a73bf26e4451a8e7fc3ecb57a3ebd","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":3,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-03T19:30:41.996Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"95dd164c3e9e41a5853799a767510488","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":2,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T15:42:01.155Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"3e63f330b96a4b969d3efede35be1ab5","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":1,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-22T12:21:12.673Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"794de0af0ab34473b219be81d7c05bdf","solicitation_number":"127EAW25R0031"}]},{"notice_id":"95dd164c3e9e41a5853799a767510488","title":"Line Fire BAER and Suppression Repair","solicitation_number":"127EAW25R0031","notice_type":"k","base_type":"k","posted":"2025-06-03","posted_at":"2025-06-03T19:30:41.996Z","due_at":"2025-06-13T17:00:00Z","due_date":"2025-06-13","cancelled":false,"archived":true,"archive_date":"2025-06-28","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/95dd164c3e9e41a5853799a767510488/view","enriched":true,"history":[{"index":6,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-13T18:54:34.242Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"a850d8de7d5b4201bc4e753a87eb234b","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":4,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-13T16:22:26.009Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"213a73bf26e4451a8e7fc3ecb57a3ebd","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":3,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-03T19:30:41.996Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"95dd164c3e9e41a5853799a767510488","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":2,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T15:42:01.155Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"3e63f330b96a4b969d3efede35be1ab5","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":1,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-22T12:21:12.673Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"794de0af0ab34473b219be81d7c05bdf","solicitation_number":"127EAW25R0031"}]},{"notice_id":"213a73bf26e4451a8e7fc3ecb57a3ebd","title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","solicitation_number":"127EAW25R0031","notice_type":"k","base_type":"k","posted":"2025-06-13","posted_at":"2025-06-13T16:22:26.009Z","due_at":"2025-06-20T18:00:00Z","due_date":"2025-06-20","cancelled":false,"archived":true,"archive_date":"2025-07-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/213a73bf26e4451a8e7fc3ecb57a3ebd/view","enriched":true,"history":[{"index":6,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-13T18:54:34.242Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"a850d8de7d5b4201bc4e753a87eb234b","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":4,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-13T16:22:26.009Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"213a73bf26e4451a8e7fc3ecb57a3ebd","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":3,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-03T19:30:41.996Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"95dd164c3e9e41a5853799a767510488","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":2,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T15:42:01.155Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"3e63f330b96a4b969d3efede35be1ab5","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":1,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-22T12:21:12.673Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"794de0af0ab34473b219be81d7c05bdf","solicitation_number":"127EAW25R0031"}]},{"notice_id":"a850d8de7d5b4201bc4e753a87eb234b","title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","solicitation_number":"127EAW25R0031","notice_type":"k","base_type":"k","posted":"2025-06-13","posted_at":"2025-06-13T18:54:34.242Z","due_at":"2025-06-20T18:00:00Z","due_date":"2025-06-20","cancelled":false,"archived":true,"archive_date":"2025-07-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a850d8de7d5b4201bc4e753a87eb234b/view","enriched":true,"history":[{"index":8,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-26T20:40:19.800Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"04f4f2b5887748a5933dd7d392e61327","solicitation_number":"127EAW25C0018","related_opportunity_id":"a850d8de7d5b4201bc4e753a87eb234b"},{"index":6,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-13T18:54:34.242Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"a850d8de7d5b4201bc4e753a87eb234b","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":4,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-13T16:22:26.009Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"213a73bf26e4451a8e7fc3ecb57a3ebd","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":3,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-03T19:30:41.996Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"95dd164c3e9e41a5853799a767510488","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":2,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T15:42:01.155Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"3e63f330b96a4b969d3efede35be1ab5","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":1,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-22T12:21:12.673Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"794de0af0ab34473b219be81d7c05bdf","solicitation_number":"127EAW25R0031"}]},{"notice_id":"04f4f2b5887748a5933dd7d392e61327","title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","solicitation_number":"127EAW25C0018","notice_type":"a","base_type":"k","posted":"2025-08-26","posted_at":"2025-08-26T20:40:19.800Z","due_at":null,"due_date":null,"cancelled":false,"archived":true,"archive_date":"2025-09-05","removed_at":null,"award_number":"127EAW25C0018","awardee_name":"RODGERS, STEVEN R","amount":"89280.00","link_sam":"https://sam.gov/workspace/contract/opp/04f4f2b5887748a5933dd7d392e61327/view","enriched":true,"history":[{"index":5,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-26T20:40:19.800Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"04f4f2b5887748a5933dd7d392e61327","solicitation_number":"127EAW25C0018","related_opportunity_id":"a850d8de7d5b4201bc4e753a87eb234b"},{"index":2,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-13T18:54:34.242Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"a850d8de7d5b4201bc4e753a87eb234b","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"}]}],"latest_notice_id":"04f4f2b5887748a5933dd7d392e61327","first_type":"k","notices":[{"dates":{"posted":"2025-05-22","posted_at":"2025-05-22T12:21:12.673Z","created_at":"2025-05-22T11:46:38.923Z","modified_at":"2025-07-05T04:04:30.137Z","response_deadline":{"raw":"2025-06-13T12:00:00-05:00","utc":"2025-06-13T17:00:00Z","date":"2025-06-13","time":"12:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/794de0af0ab34473b219be81d7c05bdf/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Line Fire BAER and Suppression Repair","agency":{"office":{"code":"127EAW","name":"USDA-FS, CSA SOUTHWEST 6"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"871023498","city":"Albuquerque","state":"NM","country":"USA"},"organization_id":"500168745","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-06-28","archive_type":"auto15"},"history":[{"index":6,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-13T18:54:34.242Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"a850d8de7d5b4201bc4e753a87eb234b","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":4,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-13T16:22:26.009Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"213a73bf26e4451a8e7fc3ecb57a3ebd","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":3,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-03T19:30:41.996Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"95dd164c3e9e41a5853799a767510488","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":2,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T15:42:01.155Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"3e63f330b96a4b969d3efede35be1ab5","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":1,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-22T12:21:12.673Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"794de0af0ab34473b219be81d7c05bdf","solicitation_number":"127EAW25R0031"}],"contacts":[{"name":"G. Jeremy Staggs","role":"primary","email":"george.staggs@usda.gov","phone":"2814821968"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"794de0af0ab34473b219be81d7c05bdf","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"794de0af0ab34473b219be81d7c05bdf","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-14T02:47:34.979845006Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"bb860a864e682368a1a8b9eb35be84d4f6b8103d48985ac5c07ec2ae11a89807","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-14T02:47:34.979845006Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><u><strong>SCOPE OF CONTRACT:</strong></u></p>\n\n<p>The purpose of this project is to replace guardrail burned by the Line Fire and to replace and repair overside drains that were damaged during Line Fire suppression efforts on the San Bernardino National Forest, Front Country and Mountaintop Ranger Districts. This contract provides for the equipment, labor, and services necessary to perform work ordered by the Government for installing 205 feet of guardrail, installing and removing 21 corrugated metal spillways, and resetting 3 corrugated metal spillways in compliance with the terms, specifications, drawings and provisions of this contract. Locations of work will be directed by the Forest Service. The contractor shall provide all labor, materials, equipment, permits, testing, incidentals, and supervision to perform the requirements of this SOW and associated task order award. This project task order contract shall include the terms and conditions of the base IDIQ contract and supplemented by any project-specific requirements/attachments. Existing contract clauses may be supplemented and new contract clauses may be added. All work will be performed in accordance with contract and applicable regulatory requirements.</p>\n\n<p><u><strong>PROJECT LOCATION:</strong></u></p>\n\n<p>The project location is in multiple locations on the Front Country and Mountaintop Ranger Districts. The terrain can be relatively flat in a few areas and moderately hilly and steep in others. Soil conditions vary as well, from soft and sandy to compacted and extremely rocky.</p>\n\n<p><u><strong>PERIOD OF PERFORMANCE: </strong></u></p>\n\n<p><strong>Projected start date: June 18, 2025.</strong></p>\n\n<p><strong>Time for completion: 105 calendar days from the issuance of the &ldquo;Notice to Proceed&rdquo;.</strong></p>\n\n<p><strong><u>REQUIREMENTS:</u> </strong></p>\n\n<p>The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities to perform the Statement of Work/Specifications referenced below. The Contractor shall minimize mechanical activity during rainy periods and the CO may shut down the operation if excessive soil disturbance and/or erosion problems occur. The Contractor shall repair all associated damage on established roads, adjacent vegetation or other improvements caused by their operations or equipment prior to partial or final payment. The Contractor shall provide technical submittals for all materials that may be furnished on this project for Forest Service review and approval prior to installation. The Contractor shall dispose of all project related trash and debris off of Forest lands prior to final payment.</p>\n\n<p>The Contractor is responsible for contacting the Forest dispatch center to obtain the fire predicted Project Activity Level (PAL) each day and restrict their work accordingly.<br />\nThe Contractor shall adhere to the pertinent requirements addressed in the Fire Plan. Fire Plan restrictions may require work to cease at 1:00 pm or not be initiated at all on a high fire activity (PAL) day.<br />\nThe Contractor is responsible for traffic control and equipment staging requirements in work areas when working on National Forest System Lands.<br />\nThe Contractor shall provide clean equipment for the project prior to driving on Forest and between project areas to prevent the introduction of invasive weeds to the Forest.</p>\n\n<p><u><strong>SPECIFICATIONS:</strong></u><br />\nA.FHWA Standard Specification 2024<br />\nB.Forest Service Supplemental Specifications [FSSS].</p>\n\n<p>Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24.<br />\nU.S. Customary Units and Forest Service Supplemental Specifications (FSSS).<br />\nFP-14 and Caltrans Specs where applicable.<br />\nElectronic copy can be downloaded at:<br />\nhttps://highways.dot.gov/federal-lands/specs/fp-24<br />\nThe following standard Forest Service specifications are included as a part of this contract:<br />\n&bull;840-2 Install<br />\n&bull;840-2a 18 Inch Detail<br />\nSan Bernardino National Forest maps are also available to assist in locating the individual roads and can be purchased at the Supervisor&rsquo;s Office.</p>\n\n<p><strong>IAW FAR 36.204, disclosed magnitude of&nbsp;construction cost is between $25,000 and $100,000.<br />\nNAICS CODE: 237310, Highway Street Bridge&nbsp;Construction, $45M</strong></p>\n\n<p><strong>SOLICITATION NO. 127EAW25R0031<br />\nDAVIS-BACON WAGES APPLY<br />\nBONDS ARE REQUIRED FOR PROJECTS WITH A VALUE OF&nbsp;$35,000.00 AND ABOVE</strong></p>","text":"SCOPE OF CONTRACT:\n\nThe purpose of this project is to replace guardrail burned by the Line Fire and to replace and repair overside drains that were damaged during Line Fire suppression efforts on the San Bernardino National Forest, Front Country and Mountaintop Ranger Districts. This contract provides for the equipment, labor, and services necessary to perform work ordered by the Government for installing 205 feet of guardrail, installing and removing 21 corrugated metal spillways, and resetting 3 corrugated metal spillways in compliance with the terms, specifications, drawings and provisions of this contract. Locations of work will be directed by the Forest Service. The contractor shall provide all labor, materials, equipment, permits, testing, incidentals, and supervision to perform the requirements of this SOW and associated task order award. This project task order contract shall include the terms and conditions of the base IDIQ contract and supplemented by any project-specific requirements/attachments. Existing contract clauses may be supplemented and new contract clauses may be added. All work will be performed in accordance with contract and applicable regulatory requirements.\n\nPROJECT LOCATION:\n\nThe project location is in multiple locations on the Front Country and Mountaintop Ranger Districts. The terrain can be relatively flat in a few areas and moderately hilly and steep in others. Soil conditions vary as well, from soft and sandy to compacted and extremely rocky.\n\nPERIOD OF PERFORMANCE:\n\nProjected start date: June 18, 2025.\n\nTime for completion: 105 calendar days from the issuance of the “Notice to Proceed”.\n\nREQUIREMENTS:\n\nThe Contractor shall furnish the necessary personnel, material, equipment, services, and facilities to perform the Statement of Work/Specifications referenced below. The Contractor shall minimize mechanical activity during rainy periods and the CO may shut down the operation if excessive soil disturbance and/or erosion problems occur. The Contractor shall repair all associated damage on established roads, adjacent vegetation or other improvements caused by their operations or equipment prior to partial or final payment. The Contractor shall provide technical submittals for all materials that may be furnished on this project for Forest Service review and approval prior to installation. The Contractor shall dispose of all project related trash and debris off of Forest lands prior to final payment.\n\nThe Contractor is responsible for contacting the Forest dispatch center to obtain the fire predicted Project Activity Level (PAL) each day and restrict their work accordingly.\n\nThe Contractor shall adhere to the pertinent requirements addressed in the Fire Plan. Fire Plan restrictions may require work to cease at 1:00 pm or not be initiated at all on a high fire activity (PAL) day.\n\nThe Contractor is responsible for traffic control and equipment staging requirements in work areas when working on National Forest System Lands.\n\nThe Contractor shall provide clean equipment for the project prior to driving on Forest and between project areas to prevent the introduction of invasive weeds to the Forest.\n\nSPECIFICATIONS:\n\nA.FHWA Standard Specification 2024\n\nB.Forest Service Supplemental Specifications [FSSS].\n\nStandard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24.\n\nU.S. Customary Units and Forest Service Supplemental Specifications (FSSS).\n\nFP-14 and Caltrans Specs where applicable.\n\nElectronic copy can be downloaded at:\n\nhttps://highways.dot.gov/federal-lands/specs/fp-24\n\nThe following standard Forest Service specifications are included as a part of this contract:\n\n•840-2 Install\n\n•840-2a 18 Inch Detail\n\nSan Bernardino National Forest maps are also available to assist in locating the individual roads and can be purchased at the Supervisor’s Office.\n\nIAW FAR 36.204, disclosed magnitude of construction cost is between $25,000 and $100,000.\n\nNAICS CODE: 237310, Highway Street Bridge Construction, $45M\n\nSOLICITATION NO. 127EAW25R0031\n\nDAVIS-BACON WAGES APPLY\n\nBONDS ARE REQUIRED FOR PROJECTS WITH A VALUE OF $35,000.00 AND ABOVE","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"127EAW25R0031","place_of_performance":{"zip":"92314","city":{"code":"6406","name":"Big Bear City"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2LB"},{"dates":{"posted":"2025-05-29","posted_at":"2025-05-29T15:42:01.155Z","created_at":"2025-05-29T15:35:22.931Z","modified_at":"2025-07-05T04:04:30.137Z","response_deadline":{"raw":"2025-06-13T12:00:00-05:00","utc":"2025-06-13T17:00:00Z","date":"2025-06-13","time":"12:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/3e63f330b96a4b969d3efede35be1ab5/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Line Fire BAER and Suppression Repair","agency":{"office":{"code":"127EAW","name":"USDA-FS, CSA SOUTHWEST 6"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"871023498","city":"Albuquerque","state":"NM","country":"USA"},"organization_id":"500168745","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-06-28","archive_type":"auto15"},"history":[{"index":6,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-13T18:54:34.242Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"a850d8de7d5b4201bc4e753a87eb234b","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":4,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-13T16:22:26.009Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"213a73bf26e4451a8e7fc3ecb57a3ebd","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":3,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-03T19:30:41.996Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"95dd164c3e9e41a5853799a767510488","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":2,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T15:42:01.155Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"3e63f330b96a4b969d3efede35be1ab5","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":1,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-22T12:21:12.673Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"794de0af0ab34473b219be81d7c05bdf","solicitation_number":"127EAW25R0031"}],"contacts":[{"name":"G. Jeremy Staggs","role":"primary","email":"george.staggs@usda.gov","phone":"2814821968"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"3e63f330b96a4b969d3efede35be1ab5","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"794de0af0ab34473b219be81d7c05bdf","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-13T10:41:55.666593957Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"621aa566c674c623e4414383b69c1dda63d56fc97572762e2e48097e3cef24c8","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-13T10:41:55.666593957Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><u><strong>SCOPE OF CONTRACT:</strong></u></p>\n\n<p>The purpose of this project is to replace guardrail burned by the Line Fire and to replace and repair overside drains that were damaged during Line Fire suppression efforts on the San Bernardino National Forest, Front Country and Mountaintop Ranger Districts. This contract provides for the equipment, labor, and services necessary to perform work ordered by the Government for installing 205 feet of guardrail, installing and removing 21 corrugated metal spillways, and resetting 3 corrugated metal spillways in compliance with the terms, specifications, drawings and provisions of this contract. Locations of work will be directed by the Forest Service. The contractor shall provide all labor, materials, equipment, permits, testing, incidentals, and supervision to perform the requirements of this SOW and associated task order award. This project task order contract shall include the terms and conditions of the base IDIQ contract and supplemented by any project-specific requirements/attachments. Existing contract clauses may be supplemented and new contract clauses may be added. All work will be performed in accordance with contract and applicable regulatory requirements.</p>\n\n<p><u><strong>PROJECT LOCATION:</strong></u></p>\n\n<p>The project location is in multiple locations on the Front Country and Mountaintop Ranger Districts. The terrain can be relatively flat in a few areas and moderately hilly and steep in others. Soil conditions vary as well, from soft and sandy to compacted and extremely rocky.</p>\n\n<p><u><strong>PERIOD OF PERFORMANCE: </strong></u></p>\n\n<p><strong>Projected start date: June 18, 2025.</strong></p>\n\n<p><strong>Time for completion: 105 calendar days from the issuance of the &ldquo;Notice to Proceed&rdquo;.</strong></p>\n\n<p><strong><u>REQUIREMENTS:</u> </strong></p>\n\n<p>The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities to perform the Statement of Work/Specifications referenced below. The Contractor shall minimize mechanical activity during rainy periods and the CO may shut down the operation if excessive soil disturbance and/or erosion problems occur. The Contractor shall repair all associated damage on established roads, adjacent vegetation or other improvements caused by their operations or equipment prior to partial or final payment. The Contractor shall provide technical submittals for all materials that may be furnished on this project for Forest Service review and approval prior to installation. The Contractor shall dispose of all project related trash and debris off of Forest lands prior to final payment.</p>\n\n<p>The Contractor is responsible for contacting the Forest dispatch center to obtain the fire predicted Project Activity Level (PAL) each day and restrict their work accordingly.<br />\nThe Contractor shall adhere to the pertinent requirements addressed in the Fire Plan. Fire Plan restrictions may require work to cease at 1:00 pm or not be initiated at all on a high fire activity (PAL) day.<br />\nThe Contractor is responsible for traffic control and equipment staging requirements in work areas when working on National Forest System Lands.<br />\nThe Contractor shall provide clean equipment for the project prior to driving on Forest and between project areas to prevent the introduction of invasive weeds to the Forest.</p>\n\n<p><u><strong>SPECIFICATIONS:</strong></u><br />\nA.FHWA Standard Specification 2024<br />\nB.Forest Service Supplemental Specifications [FSSS].</p>\n\n<p>Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24.<br />\nU.S. Customary Units and Forest Service Supplemental Specifications (FSSS).<br />\nFP-14 and Caltrans Specs where applicable.<br />\nElectronic copy can be downloaded at:<br />\nhttps://highways.dot.gov/federal-lands/specs/fp-24<br />\nThe following standard Forest Service specifications are included as a part of this contract:<br />\n&bull;840-2 Install<br />\n&bull;840-2a 18 Inch Detail<br />\nSan Bernardino National Forest maps are also available to assist in locating the individual roads and can be purchased at the Supervisor&rsquo;s Office.</p>\n\n<p><strong>IAW FAR 36.204, disclosed magnitude of&nbsp;construction cost is between $25,000 and $100,000.<br />\nNAICS CODE: 237310, Highway Street Bridge&nbsp;Construction, $45M</strong></p>\n\n<p><strong>SOLICITATION NO. 127EAW25R0031<br />\nDAVIS-BACON WAGES APPLY<br />\nBONDS ARE REQUIRED FOR PROJECTS WITH A VALUE OF&nbsp;$35,000.00 AND ABOVE</strong></p>","text":"SCOPE OF CONTRACT:\n\nThe purpose of this project is to replace guardrail burned by the Line Fire and to replace and repair overside drains that were damaged during Line Fire suppression efforts on the San Bernardino National Forest, Front Country and Mountaintop Ranger Districts. This contract provides for the equipment, labor, and services necessary to perform work ordered by the Government for installing 205 feet of guardrail, installing and removing 21 corrugated metal spillways, and resetting 3 corrugated metal spillways in compliance with the terms, specifications, drawings and provisions of this contract. Locations of work will be directed by the Forest Service. The contractor shall provide all labor, materials, equipment, permits, testing, incidentals, and supervision to perform the requirements of this SOW and associated task order award. This project task order contract shall include the terms and conditions of the base IDIQ contract and supplemented by any project-specific requirements/attachments. Existing contract clauses may be supplemented and new contract clauses may be added. All work will be performed in accordance with contract and applicable regulatory requirements.\n\nPROJECT LOCATION:\n\nThe project location is in multiple locations on the Front Country and Mountaintop Ranger Districts. The terrain can be relatively flat in a few areas and moderately hilly and steep in others. Soil conditions vary as well, from soft and sandy to compacted and extremely rocky.\n\nPERIOD OF PERFORMANCE:\n\nProjected start date: June 18, 2025.\n\nTime for completion: 105 calendar days from the issuance of the “Notice to Proceed”.\n\nREQUIREMENTS:\n\nThe Contractor shall furnish the necessary personnel, material, equipment, services, and facilities to perform the Statement of Work/Specifications referenced below. The Contractor shall minimize mechanical activity during rainy periods and the CO may shut down the operation if excessive soil disturbance and/or erosion problems occur. The Contractor shall repair all associated damage on established roads, adjacent vegetation or other improvements caused by their operations or equipment prior to partial or final payment. The Contractor shall provide technical submittals for all materials that may be furnished on this project for Forest Service review and approval prior to installation. The Contractor shall dispose of all project related trash and debris off of Forest lands prior to final payment.\n\nThe Contractor is responsible for contacting the Forest dispatch center to obtain the fire predicted Project Activity Level (PAL) each day and restrict their work accordingly.\n\nThe Contractor shall adhere to the pertinent requirements addressed in the Fire Plan. Fire Plan restrictions may require work to cease at 1:00 pm or not be initiated at all on a high fire activity (PAL) day.\n\nThe Contractor is responsible for traffic control and equipment staging requirements in work areas when working on National Forest System Lands.\n\nThe Contractor shall provide clean equipment for the project prior to driving on Forest and between project areas to prevent the introduction of invasive weeds to the Forest.\n\nSPECIFICATIONS:\n\nA.FHWA Standard Specification 2024\n\nB.Forest Service Supplemental Specifications [FSSS].\n\nStandard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24.\n\nU.S. Customary Units and Forest Service Supplemental Specifications (FSSS).\n\nFP-14 and Caltrans Specs where applicable.\n\nElectronic copy can be downloaded at:\n\nhttps://highways.dot.gov/federal-lands/specs/fp-24\n\nThe following standard Forest Service specifications are included as a part of this contract:\n\n•840-2 Install\n\n•840-2a 18 Inch Detail\n\nSan Bernardino National Forest maps are also available to assist in locating the individual roads and can be purchased at the Supervisor’s Office.\n\nIAW FAR 36.204, disclosed magnitude of construction cost is between $25,000 and $100,000.\n\nNAICS CODE: 237310, Highway Street Bridge Construction, $45M\n\nSOLICITATION NO. 127EAW25R0031\n\nDAVIS-BACON WAGES APPLY\n\nBONDS ARE REQUIRED FOR PROJECTS WITH A VALUE OF $35,000.00 AND ABOVE","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"127EAW25R0031","place_of_performance":{"zip":"92314","city":{"code":"6406","name":"Big Bear City"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2LB"},{"dates":{"posted":"2025-06-03","posted_at":"2025-06-03T19:30:41.996Z","created_at":"2025-06-03T19:29:03.169Z","modified_at":"2025-07-05T04:04:30.137Z","response_deadline":{"raw":"2025-06-13T12:00:00-05:00","utc":"2025-06-13T17:00:00Z","date":"2025-06-13","time":"12:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/95dd164c3e9e41a5853799a767510488/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Line Fire BAER and Suppression Repair","agency":{"office":{"code":"127EAW","name":"USDA-FS, CSA SOUTHWEST 6"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"871023498","city":"Albuquerque","state":"NM","country":"USA"},"organization_id":"500168745","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-06-28","archive_type":"auto15"},"history":[{"index":6,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-13T18:54:34.242Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"a850d8de7d5b4201bc4e753a87eb234b","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":4,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-13T16:22:26.009Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"213a73bf26e4451a8e7fc3ecb57a3ebd","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":3,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-03T19:30:41.996Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"95dd164c3e9e41a5853799a767510488","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":2,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T15:42:01.155Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"3e63f330b96a4b969d3efede35be1ab5","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":1,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-22T12:21:12.673Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"794de0af0ab34473b219be81d7c05bdf","solicitation_number":"127EAW25R0031"}],"contacts":[{"name":"G. Jeremy Staggs","role":"primary","email":"george.staggs@usda.gov","phone":"2814821968"},{"name":"Jeremy Bedner","role":"secondary","email":"jeremy.bedner@usda.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"95dd164c3e9e41a5853799a767510488","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"794de0af0ab34473b219be81d7c05bdf","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-13T07:35:38.317116250Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"ec0f3d796893515dd0cf7f223d36c8b87b13c17021543162c05d659856c31dd0","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-13T07:35:38.317116250Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><u><strong>SCOPE OF CONTRACT:</strong></u></p>\n\n<p>The purpose of this project is to replace guardrail burned by the Line Fire and to replace and repair overside drains that were damaged during Line Fire suppression efforts on the San Bernardino National Forest, Front Country and Mountaintop Ranger Districts. This contract provides for the equipment, labor, and services necessary to perform work ordered by the Government for installing 205 feet of guardrail, installing and removing 21 corrugated metal spillways, and resetting 3 corrugated metal spillways in compliance with the terms, specifications, drawings and provisions of this contract. Locations of work will be directed by the Forest Service. The contractor shall provide all labor, materials, equipment, permits, testing, incidentals, and supervision to perform the requirements of this SOW and associated task order award. This project task order contract shall include the terms and conditions of the base IDIQ contract and supplemented by any project-specific requirements/attachments. Existing contract clauses may be supplemented and new contract clauses may be added. All work will be performed in accordance with contract and applicable regulatory requirements.</p>\n\n<p><u><strong>PROJECT LOCATION:</strong></u></p>\n\n<p>The project location is in multiple locations on the Front Country and Mountaintop Ranger Districts. The terrain can be relatively flat in a few areas and moderately hilly and steep in others. Soil conditions vary as well, from soft and sandy to compacted and extremely rocky.</p>\n\n<p><u><strong>PERIOD OF PERFORMANCE: </strong></u></p>\n\n<p><strong>Projected start date: June 18, 2025.</strong></p>\n\n<p><strong>Time for completion: 105 calendar days from the issuance of the &ldquo;Notice to Proceed&rdquo;.</strong></p>\n\n<p><strong><u>REQUIREMENTS:</u> </strong></p>\n\n<p>The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities to perform the Statement of Work/Specifications referenced below. The Contractor shall minimize mechanical activity during rainy periods and the CO may shut down the operation if excessive soil disturbance and/or erosion problems occur. The Contractor shall repair all associated damage on established roads, adjacent vegetation or other improvements caused by their operations or equipment prior to partial or final payment. The Contractor shall provide technical submittals for all materials that may be furnished on this project for Forest Service review and approval prior to installation. The Contractor shall dispose of all project related trash and debris off of Forest lands prior to final payment.</p>\n\n<p>The Contractor is responsible for contacting the Forest dispatch center to obtain the fire predicted Project Activity Level (PAL) each day and restrict their work accordingly.<br />\nThe Contractor shall adhere to the pertinent requirements addressed in the Fire Plan. Fire Plan restrictions may require work to cease at 1:00 pm or not be initiated at all on a high fire activity (PAL) day.<br />\nThe Contractor is responsible for traffic control and equipment staging requirements in work areas when working on National Forest System Lands.<br />\nThe Contractor shall provide clean equipment for the project prior to driving on Forest and between project areas to prevent the introduction of invasive weeds to the Forest.</p>\n\n<p><u><strong>SPECIFICATIONS:</strong></u><br />\nA.FHWA Standard Specification 2024<br />\nB.Forest Service Supplemental Specifications [FSSS].</p>\n\n<p>Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24.<br />\nU.S. Customary Units and Forest Service Supplemental Specifications (FSSS).<br />\nFP-14 and Caltrans Specs where applicable.<br />\nElectronic copy can be downloaded at:<br />\nhttps://highways.dot.gov/federal-lands/specs/fp-24<br />\nThe following standard Forest Service specifications are included as a part of this contract:<br />\n&bull;840-2 Install<br />\n&bull;840-2a 18 Inch Detail<br />\nSan Bernardino National Forest maps are also available to assist in locating the individual roads and can be purchased at the Supervisor&rsquo;s Office.</p>\n\n<p><strong>IAW FAR 36.204, disclosed magnitude of&nbsp;construction cost is between $25,000 and $100,000.<br />\nNAICS CODE: 237310, Highway Street Bridge&nbsp;Construction, $45M</strong></p>\n\n<p><strong>SOLICITATION NO. 127EAW25R0031<br />\nDAVIS-BACON WAGES APPLY<br />\nBONDS ARE REQUIRED FOR PROJECTS WITH A VALUE OF&nbsp;$35,000.00 AND ABOVE</strong></p>","text":"SCOPE OF CONTRACT:\n\nThe purpose of this project is to replace guardrail burned by the Line Fire and to replace and repair overside drains that were damaged during Line Fire suppression efforts on the San Bernardino National Forest, Front Country and Mountaintop Ranger Districts. This contract provides for the equipment, labor, and services necessary to perform work ordered by the Government for installing 205 feet of guardrail, installing and removing 21 corrugated metal spillways, and resetting 3 corrugated metal spillways in compliance with the terms, specifications, drawings and provisions of this contract. Locations of work will be directed by the Forest Service. The contractor shall provide all labor, materials, equipment, permits, testing, incidentals, and supervision to perform the requirements of this SOW and associated task order award. This project task order contract shall include the terms and conditions of the base IDIQ contract and supplemented by any project-specific requirements/attachments. Existing contract clauses may be supplemented and new contract clauses may be added. All work will be performed in accordance with contract and applicable regulatory requirements.\n\nPROJECT LOCATION:\n\nThe project location is in multiple locations on the Front Country and Mountaintop Ranger Districts. The terrain can be relatively flat in a few areas and moderately hilly and steep in others. Soil conditions vary as well, from soft and sandy to compacted and extremely rocky.\n\nPERIOD OF PERFORMANCE:\n\nProjected start date: June 18, 2025.\n\nTime for completion: 105 calendar days from the issuance of the “Notice to Proceed”.\n\nREQUIREMENTS:\n\nThe Contractor shall furnish the necessary personnel, material, equipment, services, and facilities to perform the Statement of Work/Specifications referenced below. The Contractor shall minimize mechanical activity during rainy periods and the CO may shut down the operation if excessive soil disturbance and/or erosion problems occur. The Contractor shall repair all associated damage on established roads, adjacent vegetation or other improvements caused by their operations or equipment prior to partial or final payment. The Contractor shall provide technical submittals for all materials that may be furnished on this project for Forest Service review and approval prior to installation. The Contractor shall dispose of all project related trash and debris off of Forest lands prior to final payment.\n\nThe Contractor is responsible for contacting the Forest dispatch center to obtain the fire predicted Project Activity Level (PAL) each day and restrict their work accordingly.\n\nThe Contractor shall adhere to the pertinent requirements addressed in the Fire Plan. Fire Plan restrictions may require work to cease at 1:00 pm or not be initiated at all on a high fire activity (PAL) day.\n\nThe Contractor is responsible for traffic control and equipment staging requirements in work areas when working on National Forest System Lands.\n\nThe Contractor shall provide clean equipment for the project prior to driving on Forest and between project areas to prevent the introduction of invasive weeds to the Forest.\n\nSPECIFICATIONS:\n\nA.FHWA Standard Specification 2024\n\nB.Forest Service Supplemental Specifications [FSSS].\n\nStandard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24.\n\nU.S. Customary Units and Forest Service Supplemental Specifications (FSSS).\n\nFP-14 and Caltrans Specs where applicable.\n\nElectronic copy can be downloaded at:\n\nhttps://highways.dot.gov/federal-lands/specs/fp-24\n\nThe following standard Forest Service specifications are included as a part of this contract:\n\n•840-2 Install\n\n•840-2a 18 Inch Detail\n\nSan Bernardino National Forest maps are also available to assist in locating the individual roads and can be purchased at the Supervisor’s Office.\n\nIAW FAR 36.204, disclosed magnitude of construction cost is between $25,000 and $100,000.\n\nNAICS CODE: 237310, Highway Street Bridge Construction, $45M\n\nSOLICITATION NO. 127EAW25R0031\n\nDAVIS-BACON WAGES APPLY\n\nBONDS ARE REQUIRED FOR PROJECTS WITH A VALUE OF $35,000.00 AND ABOVE","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"127EAW25R0031","place_of_performance":{"zip":"92314","city":{"code":"6406","name":"Big Bear City"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2LB"},{"dates":{"posted":"2025-06-13","posted_at":"2025-06-13T16:22:26.009Z","created_at":"2025-06-13T15:32:06.053Z","modified_at":"2025-07-05T04:04:30.137Z","response_deadline":{"raw":"2025-06-20T11:00:00-07:00","utc":"2025-06-20T18:00:00Z","date":"2025-06-20","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/213a73bf26e4451a8e7fc3ecb57a3ebd/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","agency":{"office":{"code":"127EAW","name":"USDA-FS, CSA SOUTHWEST 6"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"871023498","city":"Albuquerque","state":"NM","country":"USA"},"organization_id":"500168745","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-07-05","archive_type":"auto15"},"history":[{"index":6,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-13T18:54:34.242Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"a850d8de7d5b4201bc4e753a87eb234b","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":4,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-13T16:22:26.009Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"213a73bf26e4451a8e7fc3ecb57a3ebd","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":3,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-03T19:30:41.996Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"95dd164c3e9e41a5853799a767510488","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":2,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T15:42:01.155Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"3e63f330b96a4b969d3efede35be1ab5","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":1,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-22T12:21:12.673Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"794de0af0ab34473b219be81d7c05bdf","solicitation_number":"127EAW25R0031"}],"contacts":[{"name":"Tanya Torres","role":"primary","email":"tanya.torres@usda.gov"},{"name":"Jeremy Bedner","role":"secondary","email":"jeremy.bedner@usda.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"213a73bf26e4451a8e7fc3ecb57a3ebd","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"794de0af0ab34473b219be81d7c05bdf","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-12T13:51:28.484535521Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"948bfe26df5845e519f2e006e6f05cdf71a704692bbcfdb841fdbab9a01c2fdf","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-12T13:51:28.484535521Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>Amendment 1 dated 06/13/2025 is issued.</p>\n\n<p>1.&nbsp;&nbsp; &nbsp;Extend the solicitation due date. The new extended proposal due date is 6/20/2025 at 11:00 AM PST<br />\n2.&nbsp;&nbsp; &nbsp;Provide an update on the proposal submission instructions. Send to Tanya Torres. tanya.torres@usda.gov<br />\n3.&nbsp;&nbsp; &nbsp;Provide an update on Request For Information (RFI) Responses</p>\n\n<p>--------------------------------------------------</p>\n\n<p><u><strong>SCOPE OF CONTRACT:</strong></u></p>\n\n<p>The purpose of this project is to replace guardrail burned by the Line Fire and to replace and repair overside drains that were damaged during Line Fire suppression efforts on the San Bernardino National Forest, Front Country and Mountaintop Ranger Districts. This contract provides for the equipment, labor, and services necessary to perform work ordered by the Government for installing 205 feet of guardrail, installing and removing 21 corrugated metal spillways, and resetting 3 corrugated metal spillways in compliance with the terms, specifications, drawings and provisions of this contract. Locations of work will be directed by the Forest Service. The contractor shall provide all labor, materials, equipment, permits, testing, incidentals, and supervision to perform the requirements of this SOW and associated task order award. This project task order contract shall include the terms and conditions of the base IDIQ contract and supplemented by any project-specific requirements/attachments. Existing contract clauses may be supplemented and new contract clauses may be added. All work will be performed in accordance with contract and applicable regulatory requirements.</p>\n\n<p><u><strong>PROJECT LOCATION:</strong></u></p>\n\n<p>The project location is in multiple locations on the Front Country and Mountaintop Ranger Districts. The terrain can be relatively flat in a few areas and moderately hilly and steep in others. Soil conditions vary as well, from soft and sandy to compacted and extremely rocky.</p>\n\n<p><u><strong>PERIOD OF PERFORMANCE: </strong></u></p>\n\n<p><strong>Projected start date: June 18, 2025.</strong></p>\n\n<p><strong>Time for completion: 105 calendar days from the issuance of the &ldquo;Notice to Proceed&rdquo;.</strong></p>\n\n<p><strong><u>REQUIREMENTS:</u> </strong></p>\n\n<p>The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities to perform the Statement of Work/Specifications referenced below. The Contractor shall minimize mechanical activity during rainy periods and the CO may shut down the operation if excessive soil disturbance and/or erosion problems occur. The Contractor shall repair all associated damage on established roads, adjacent vegetation or other improvements caused by their operations or equipment prior to partial or final payment. The Contractor shall provide technical submittals for all materials that may be furnished on this project for Forest Service review and approval prior to installation. The Contractor shall dispose of all project related trash and debris off of Forest lands prior to final payment.</p>\n\n<p>The Contractor is responsible for contacting the Forest dispatch center to obtain the fire predicted Project Activity Level (PAL) each day and restrict their work accordingly.<br />\nThe Contractor shall adhere to the pertinent requirements addressed in the Fire Plan. Fire Plan restrictions may require work to cease at 1:00 pm or not be initiated at all on a high fire activity (PAL) day.<br />\nThe Contractor is responsible for traffic control and equipment staging requirements in work areas when working on National Forest System Lands.<br />\nThe Contractor shall provide clean equipment for the project prior to driving on Forest and between project areas to prevent the introduction of invasive weeds to the Forest.</p>\n\n<p><u><strong>SPECIFICATIONS:</strong></u><br />\nA.FHWA Standard Specification 2024<br />\nB.Forest Service Supplemental Specifications [FSSS].</p>\n\n<p>Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24.<br />\nU.S. Customary Units and Forest Service Supplemental Specifications (FSSS).<br />\nFP-14 and Caltrans Specs where applicable.<br />\nElectronic copy can be downloaded at:<br />\nhttps://highways.dot.gov/federal-lands/specs/fp-24<br />\nThe following standard Forest Service specifications are included as a part of this contract:<br />\n&bull;840-2 Install<br />\n&bull;840-2a 18 Inch Detail<br />\nSan Bernardino National Forest maps are also available to assist in locating the individual roads and can be purchased at the Supervisor&rsquo;s Office.</p>\n\n<p><strong>IAW FAR 36.204, disclosed magnitude of&nbsp;construction cost is between $25,000 and $100,000.<br />\nNAICS CODE: 237310, Highway Street Bridge&nbsp;Construction, $45M</strong></p>\n\n<p><strong>SOLICITATION NO. 127EAW25R0031<br />\nDAVIS-BACON WAGES APPLY<br />\nBONDS ARE REQUIRED FOR PROJECTS WITH A VALUE OF&nbsp;$35,000.00 AND ABOVE</strong></p>","text":"Amendment 1 dated 06/13/2025 is issued.\n\n1. Extend the solicitation due date. The new extended proposal due date is 6/20/2025 at 11:00 AM PST\n\n2. Provide an update on the proposal submission instructions. Send to Tanya Torres. tanya.torres@usda.gov\n\n3. Provide an update on Request For Information (RFI) Responses\n\n--------------------------------------------------\n\nSCOPE OF CONTRACT:\n\nThe purpose of this project is to replace guardrail burned by the Line Fire and to replace and repair overside drains that were damaged during Line Fire suppression efforts on the San Bernardino National Forest, Front Country and Mountaintop Ranger Districts. This contract provides for the equipment, labor, and services necessary to perform work ordered by the Government for installing 205 feet of guardrail, installing and removing 21 corrugated metal spillways, and resetting 3 corrugated metal spillways in compliance with the terms, specifications, drawings and provisions of this contract. Locations of work will be directed by the Forest Service. The contractor shall provide all labor, materials, equipment, permits, testing, incidentals, and supervision to perform the requirements of this SOW and associated task order award. This project task order contract shall include the terms and conditions of the base IDIQ contract and supplemented by any project-specific requirements/attachments. Existing contract clauses may be supplemented and new contract clauses may be added. All work will be performed in accordance with contract and applicable regulatory requirements.\n\nPROJECT LOCATION:\n\nThe project location is in multiple locations on the Front Country and Mountaintop Ranger Districts. The terrain can be relatively flat in a few areas and moderately hilly and steep in others. Soil conditions vary as well, from soft and sandy to compacted and extremely rocky.\n\nPERIOD OF PERFORMANCE:\n\nProjected start date: June 18, 2025.\n\nTime for completion: 105 calendar days from the issuance of the “Notice to Proceed”.\n\nREQUIREMENTS:\n\nThe Contractor shall furnish the necessary personnel, material, equipment, services, and facilities to perform the Statement of Work/Specifications referenced below. The Contractor shall minimize mechanical activity during rainy periods and the CO may shut down the operation if excessive soil disturbance and/or erosion problems occur. The Contractor shall repair all associated damage on established roads, adjacent vegetation or other improvements caused by their operations or equipment prior to partial or final payment. The Contractor shall provide technical submittals for all materials that may be furnished on this project for Forest Service review and approval prior to installation. The Contractor shall dispose of all project related trash and debris off of Forest lands prior to final payment.\n\nThe Contractor is responsible for contacting the Forest dispatch center to obtain the fire predicted Project Activity Level (PAL) each day and restrict their work accordingly.\n\nThe Contractor shall adhere to the pertinent requirements addressed in the Fire Plan. Fire Plan restrictions may require work to cease at 1:00 pm or not be initiated at all on a high fire activity (PAL) day.\n\nThe Contractor is responsible for traffic control and equipment staging requirements in work areas when working on National Forest System Lands.\n\nThe Contractor shall provide clean equipment for the project prior to driving on Forest and between project areas to prevent the introduction of invasive weeds to the Forest.\n\nSPECIFICATIONS:\n\nA.FHWA Standard Specification 2024\n\nB.Forest Service Supplemental Specifications [FSSS].\n\nStandard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24.\n\nU.S. Customary Units and Forest Service Supplemental Specifications (FSSS).\n\nFP-14 and Caltrans Specs where applicable.\n\nElectronic copy can be downloaded at:\n\nhttps://highways.dot.gov/federal-lands/specs/fp-24\n\nThe following standard Forest Service specifications are included as a part of this contract:\n\n•840-2 Install\n\n•840-2a 18 Inch Detail\n\nSan Bernardino National Forest maps are also available to assist in locating the individual roads and can be purchased at the Supervisor’s Office.\n\nIAW FAR 36.204, disclosed magnitude of construction cost is between $25,000 and $100,000.\n\nNAICS CODE: 237310, Highway Street Bridge Construction, $45M\n\nSOLICITATION NO. 127EAW25R0031\n\nDAVIS-BACON WAGES APPLY\n\nBONDS ARE REQUIRED FOR PROJECTS WITH A VALUE OF $35,000.00 AND ABOVE","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"127EAW25R0031","place_of_performance":{"zip":"92314","city":{"code":"6406","name":"Big Bear City"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2LB"},{"dates":{"posted":"2025-06-13","posted_at":"2025-06-13T18:54:34.242Z","created_at":"2025-06-13T18:50:35.673Z","modified_at":"2025-07-05T04:04:30.137Z","response_deadline":{"raw":"2025-06-20T11:00:00-07:00","utc":"2025-06-20T18:00:00Z","date":"2025-06-20","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a850d8de7d5b4201bc4e753a87eb234b/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","agency":{"office":{"code":"127EAW","name":"USDA-FS, CSA SOUTHWEST 6"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"871023498","city":"Albuquerque","state":"NM","country":"USA"},"organization_id":"500168745","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-07-05","archive_type":"auto15"},"history":[{"index":8,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-26T20:40:19.800Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"04f4f2b5887748a5933dd7d392e61327","solicitation_number":"127EAW25C0018","related_opportunity_id":"a850d8de7d5b4201bc4e753a87eb234b"},{"index":6,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-13T18:54:34.242Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"a850d8de7d5b4201bc4e753a87eb234b","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":4,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-13T16:22:26.009Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"213a73bf26e4451a8e7fc3ecb57a3ebd","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":3,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-03T19:30:41.996Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"95dd164c3e9e41a5853799a767510488","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":2,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-29T15:42:01.155Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"3e63f330b96a4b969d3efede35be1ab5","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"},{"index":1,"title":"Line Fire BAER and Suppression Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-22T12:21:12.673Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"794de0af0ab34473b219be81d7c05bdf","solicitation_number":"127EAW25R0031"}],"contacts":[{"name":"Tanya Torres","role":"primary","email":"tanya.torres@usda.gov"},{"name":"Jeremy Bedner","role":"secondary","email":"jeremy.bedner@usda.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"a850d8de7d5b4201bc4e753a87eb234b","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"794de0af0ab34473b219be81d7c05bdf","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-12T14:23:22.962893095Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"8011daab5d41aa355eee7700871636e2ed5abd48da7bf05cbbb4e17da9ad5b99","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-12T14:23:22.962893095Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>Amendment 2 dated 06/13/2025 is issued.<br />\n<br />\n1.&nbsp; &nbsp;Request For Information (RFI) Responses have been provided<br />\n2.&nbsp; &nbsp;Attachment 12, titled &quot;Line Fire Guardrail,&quot; is now included</p>\n\n<p>--------------------------------------------------</p>\n\n<p>Amendment 1 dated 06/13/2025 is issued.</p>\n\n<p>1.&nbsp;&nbsp; &nbsp;Extend the solicitation due date. The new extended proposal due date is 6/20/2025 at 11:00 AM PST<br />\n2.&nbsp;&nbsp; &nbsp;Provide an update on the proposal submission instructions. Send to Tanya Torres. tanya.torres@usda.gov<br />\n3.&nbsp;&nbsp; &nbsp;Provide an update on Request For Information (RFI) Responses</p>\n\n<p>--------------------------------------------------</p>\n\n<p><u><strong>SCOPE OF CONTRACT:</strong></u></p>\n\n<p>The purpose of this project is to replace guardrail burned by the Line Fire and to replace and repair overside drains that were damaged during Line Fire suppression efforts on the San Bernardino National Forest, Front Country and Mountaintop Ranger Districts. This contract provides for the equipment, labor, and services necessary to perform work ordered by the Government for installing 205 feet of guardrail, installing and removing 21 corrugated metal spillways, and resetting 3 corrugated metal spillways in compliance with the terms, specifications, drawings and provisions of this contract. Locations of work will be directed by the Forest Service. The contractor shall provide all labor, materials, equipment, permits, testing, incidentals, and supervision to perform the requirements of this SOW and associated task order award. This project task order contract shall include the terms and conditions of the base IDIQ contract and supplemented by any project-specific requirements/attachments. Existing contract clauses may be supplemented and new contract clauses may be added. All work will be performed in accordance with contract and applicable regulatory requirements.</p>\n\n<p><u><strong>PROJECT LOCATION:</strong></u></p>\n\n<p>The project location is in multiple locations on the Front Country and Mountaintop Ranger Districts. The terrain can be relatively flat in a few areas and moderately hilly and steep in others. Soil conditions vary as well, from soft and sandy to compacted and extremely rocky.</p>\n\n<p><u><strong>PERIOD OF PERFORMANCE: </strong></u></p>\n\n<p><strong>Projected start date: June 18, 2025.</strong></p>\n\n<p><strong>Time for completion: 105 calendar days from the issuance of the &ldquo;Notice to Proceed&rdquo;.</strong></p>\n\n<p><strong><u>REQUIREMENTS:</u> </strong></p>\n\n<p>The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities to perform the Statement of Work/Specifications referenced below. The Contractor shall minimize mechanical activity during rainy periods and the CO may shut down the operation if excessive soil disturbance and/or erosion problems occur. The Contractor shall repair all associated damage on established roads, adjacent vegetation or other improvements caused by their operations or equipment prior to partial or final payment. The Contractor shall provide technical submittals for all materials that may be furnished on this project for Forest Service review and approval prior to installation. The Contractor shall dispose of all project related trash and debris off of Forest lands prior to final payment.</p>\n\n<p>The Contractor is responsible for contacting the Forest dispatch center to obtain the fire predicted Project Activity Level (PAL) each day and restrict their work accordingly.<br />\nThe Contractor shall adhere to the pertinent requirements addressed in the Fire Plan. Fire Plan restrictions may require work to cease at 1:00 pm or not be initiated at all on a high fire activity (PAL) day.<br />\nThe Contractor is responsible for traffic control and equipment staging requirements in work areas when working on National Forest System Lands.<br />\nThe Contractor shall provide clean equipment for the project prior to driving on Forest and between project areas to prevent the introduction of invasive weeds to the Forest.</p>\n\n<p><u><strong>SPECIFICATIONS:</strong></u><br />\nA.FHWA Standard Specification 2024<br />\nB.Forest Service Supplemental Specifications [FSSS].</p>\n\n<p>Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24.<br />\nU.S. Customary Units and Forest Service Supplemental Specifications (FSSS).<br />\nFP-14 and Caltrans Specs where applicable.<br />\nElectronic copy can be downloaded at:<br />\nhttps://highways.dot.gov/federal-lands/specs/fp-24<br />\nThe following standard Forest Service specifications are included as a part of this contract:<br />\n&bull;840-2 Install<br />\n&bull;840-2a 18 Inch Detail<br />\nSan Bernardino National Forest maps are also available to assist in locating the individual roads and can be purchased at the Supervisor&rsquo;s Office.</p>\n\n<p><strong>IAW FAR 36.204, disclosed magnitude of&nbsp;construction cost is between $25,000 and $100,000.<br />\nNAICS CODE: 237310, Highway Street Bridge&nbsp;Construction, $45M</strong></p>\n\n<p><strong>SOLICITATION NO. 127EAW25R0031<br />\nDAVIS-BACON WAGES APPLY<br />\nBONDS ARE REQUIRED FOR PROJECTS WITH A VALUE OF&nbsp;$35,000.00 AND ABOVE</strong></p>","text":"Amendment 2 dated 06/13/2025 is issued.\n\n1. Request For Information (RFI) Responses have been provided\n\n2. Attachment 12, titled \"Line Fire Guardrail,\" is now included\n\n--------------------------------------------------\n\nAmendment 1 dated 06/13/2025 is issued.\n\n1. Extend the solicitation due date. The new extended proposal due date is 6/20/2025 at 11:00 AM PST\n\n2. Provide an update on the proposal submission instructions. Send to Tanya Torres. tanya.torres@usda.gov\n\n3. Provide an update on Request For Information (RFI) Responses\n\n--------------------------------------------------\n\nSCOPE OF CONTRACT:\n\nThe purpose of this project is to replace guardrail burned by the Line Fire and to replace and repair overside drains that were damaged during Line Fire suppression efforts on the San Bernardino National Forest, Front Country and Mountaintop Ranger Districts. This contract provides for the equipment, labor, and services necessary to perform work ordered by the Government for installing 205 feet of guardrail, installing and removing 21 corrugated metal spillways, and resetting 3 corrugated metal spillways in compliance with the terms, specifications, drawings and provisions of this contract. Locations of work will be directed by the Forest Service. The contractor shall provide all labor, materials, equipment, permits, testing, incidentals, and supervision to perform the requirements of this SOW and associated task order award. This project task order contract shall include the terms and conditions of the base IDIQ contract and supplemented by any project-specific requirements/attachments. Existing contract clauses may be supplemented and new contract clauses may be added. All work will be performed in accordance with contract and applicable regulatory requirements.\n\nPROJECT LOCATION:\n\nThe project location is in multiple locations on the Front Country and Mountaintop Ranger Districts. The terrain can be relatively flat in a few areas and moderately hilly and steep in others. Soil conditions vary as well, from soft and sandy to compacted and extremely rocky.\n\nPERIOD OF PERFORMANCE:\n\nProjected start date: June 18, 2025.\n\nTime for completion: 105 calendar days from the issuance of the “Notice to Proceed”.\n\nREQUIREMENTS:\n\nThe Contractor shall furnish the necessary personnel, material, equipment, services, and facilities to perform the Statement of Work/Specifications referenced below. The Contractor shall minimize mechanical activity during rainy periods and the CO may shut down the operation if excessive soil disturbance and/or erosion problems occur. The Contractor shall repair all associated damage on established roads, adjacent vegetation or other improvements caused by their operations or equipment prior to partial or final payment. The Contractor shall provide technical submittals for all materials that may be furnished on this project for Forest Service review and approval prior to installation. The Contractor shall dispose of all project related trash and debris off of Forest lands prior to final payment.\n\nThe Contractor is responsible for contacting the Forest dispatch center to obtain the fire predicted Project Activity Level (PAL) each day and restrict their work accordingly.\n\nThe Contractor shall adhere to the pertinent requirements addressed in the Fire Plan. Fire Plan restrictions may require work to cease at 1:00 pm or not be initiated at all on a high fire activity (PAL) day.\n\nThe Contractor is responsible for traffic control and equipment staging requirements in work areas when working on National Forest System Lands.\n\nThe Contractor shall provide clean equipment for the project prior to driving on Forest and between project areas to prevent the introduction of invasive weeds to the Forest.\n\nSPECIFICATIONS:\n\nA.FHWA Standard Specification 2024\n\nB.Forest Service Supplemental Specifications [FSSS].\n\nStandard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24.\n\nU.S. Customary Units and Forest Service Supplemental Specifications (FSSS).\n\nFP-14 and Caltrans Specs where applicable.\n\nElectronic copy can be downloaded at:\n\nhttps://highways.dot.gov/federal-lands/specs/fp-24\n\nThe following standard Forest Service specifications are included as a part of this contract:\n\n•840-2 Install\n\n•840-2a 18 Inch Detail\n\nSan Bernardino National Forest maps are also available to assist in locating the individual roads and can be purchased at the Supervisor’s Office.\n\nIAW FAR 36.204, disclosed magnitude of construction cost is between $25,000 and $100,000.\n\nNAICS CODE: 237310, Highway Street Bridge Construction, $45M\n\nSOLICITATION NO. 127EAW25R0031\n\nDAVIS-BACON WAGES APPLY\n\nBONDS ARE REQUIRED FOR PROJECTS WITH A VALUE OF $35,000.00 AND ABOVE","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"127EAW25R0031","place_of_performance":{"zip":"92314","city":{"code":"6406","name":"Big Bear City"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2LB"},{"award":{"date":"2025-08-21","amount":"89280.00","number":"127EAW25C0018","awardee":{"raw":"RODGERS, STEVEN R Arcadia CA 91007 USA","uei":"H6LZHL6SY1K8","cage":"3V2V1","name":"RODGERS, STEVEN R","location":{"zip":"91007","city":{"code":"2462","name":"Arcadia"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}}}},"dates":{"posted":"2025-08-26","posted_at":"2025-08-26T20:40:19.800Z","award_date":"2025-08-21","created_at":"2025-08-26T20:35:01.997Z","modified_at":"2025-09-06T03:55:54.031Z"},"links":{"sam":"https://sam.gov/workspace/contract/opp/04f4f2b5887748a5933dd7d392e61327/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","agency":{"office":{"code":"127EAW","name":"USDA-FS, CSA SOUTHWEST 6"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"871023498","city":"Albuquerque","state":"NM","country":"USA"},"organization_id":"500168745","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-09-05","archive_type":"auto15"},"history":[{"index":5,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-26T20:40:19.800Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"04f4f2b5887748a5933dd7d392e61327","solicitation_number":"127EAW25C0018","related_opportunity_id":"a850d8de7d5b4201bc4e753a87eb234b"},{"index":2,"title":"Line Fire BAER and Suppression Repair. San Bernardino National Forest.","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-13T18:54:34.242Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"a850d8de7d5b4201bc4e753a87eb234b","solicitation_number":"127EAW25R0031","parent_opportunity_id":"794de0af0ab34473b219be81d7c05bdf"}],"contacts":[{"name":"Tanya Torres","role":"primary","email":"tanya.torres@usda.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"04f4f2b5887748a5933dd7d392e61327","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"794de0af0ab34473b219be81d7c05bdf","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-02T03:26:33.262530795Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"e54200524ca532672e42d6b448f2e60510f12e6dcb7b0b6637974aa68562726e","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-02T03:26:33.262530795Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>Line Fire Road Treatment &amp; Suppression Repair<br />\nSan Bernardino National Forest</p>","text":"Line Fire Road Treatment & Suppression Repair\n\nSan Bernardino National Forest","origin":"detail"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"127EAW25C0018","place_of_performance":{"zip":"92314","city":{"code":"6406","name":"Big Bear City"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2LB"}],"due_at":"2025-06-20T18:00:00Z","due_date":"2025-06-20","closes_at":"2025-06-20T18:00:00Z","awardable":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-127EAW","office_name":"USDA-FS, CSA SOUTHWEST 6","state":"CA","county":"06071","county_name":"San Bernardino County","city":"0606406","city_name":"Big Bear City","country":"USA","state_source":null,"state_evidence":null,"site_key":"san-bernardino-national-forest-ca","winner_key":"H6LZHL6SY1K8","amount":"89280.00","linked_awards":6,"cancelled":false,"archived":true,"updated_at":"2026-11-02T03:44:24.930450Z","principal_notice_id":"04f4f2b5887748a5933dd7d392e61327","description":{"text":"Line Fire Road Treatment & Suppression Repair\n\nSan Bernardino National Forest","html":"<p>Line Fire Road Treatment &amp; Suppression Repair<br />\nSan Bernardino National Forest</p>","origin":"detail"},"contacts":[{"name":"Tanya Torres","role":"primary","email":"tanya.torres@usda.gov"}],"place_of_performance":{"zip":"92314","city":{"code":"6406","name":"Big Bear City"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"871023498","city":"Albuquerque","state":"NM","country":"USA"},"naics_codes":["237310"],"award":{"date":"2025-08-21","amount":"89280.00","number":"127EAW25C0018","awardee":{"raw":"RODGERS, STEVEN R Arcadia CA 91007 USA","uei":"H6LZHL6SY1K8","cage":"3V2V1","name":"RODGERS, STEVEN R","location":{"zip":"91007","city":{"code":"2462","name":"Arcadia"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}}}},"attachments":[{"resource_id":"633c64c0ada24d42817889002c516332","name":"10. Past Performance Questionnaire.pdf","kind":"file","mime_type":".pdf","size_bytes":158455,"posted_at":"2025-05-22T12:21:12.673Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/633c64c0ada24d42817889002c516332/download","mirrored":false},{"resource_id":"067878f7b4964453a821fc400a351215","name":"11. SAM.gov Q&A.xlsx","kind":"file","mime_type":".xlsx","size_bytes":11242,"posted_at":"2025-05-29T15:42:01.155Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/067878f7b4964453a821fc400a351215/download","mirrored":false},{"resource_id":"a6cad44c2a07442181b4f6ab89afa3f8","name":"9. DBA CA20250026 Dated 28 Mar25.pdf","kind":"file","mime_type":".pdf","size_bytes":9788385,"posted_at":"2025-05-22T12:21:12.673Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a6cad44c2a07442181b4f6ab89afa3f8/download","mirrored":false},{"resource_id":"5b570f2f9e12440ba32cc913fed26991","name":"8. R5 Road Maintenance Specs.pdf","kind":"file","mime_type":".pdf","size_bytes":1410231,"posted_at":"2025-05-22T12:21:12.673Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5b570f2f9e12440ba32cc913fed26991/download","mirrored":false},{"resource_id":"924663bb3d2e4f0080686753952bc753","name":"7. Fire Plan Line Fire.pdf","kind":"file","mime_type":".pdf","size_bytes":317551,"posted_at":"2025-05-22T12:21:12.673Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/924663bb3d2e4f0080686753952bc753/download","mirrored":false},{"resource_id":"d3e8ea3c7a9747828aa67bf9eee3ab59","name":"6. 840-2a 18 Inch Detail.pdf","kind":"file","mime_type":".pdf","size_bytes":265451,"posted_at":"2025-05-22T12:21:12.673Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d3e8ea3c7a9747828aa67bf9eee3ab59/download","mirrored":false},{"resource_id":"0c54d09c4d07465199fd26fb92be25b5","name":"5. 840-2 Install.pdf","kind":"file","mime_type":".pdf","size_bytes":457588,"posted_at":"2025-05-22T12:21:12.673Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0c54d09c4d07465199fd26fb92be25b5/download","mirrored":false},{"resource_id":"03c57dd3ac944e37b13658ae585d3c2a","name":"4. Line Fire Suppression Repair Map 36x48.pdf","kind":"file","mime_type":".pdf","size_bytes":16887281,"posted_at":"2025-05-22T12:21:12.673Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/03c57dd3ac944e37b13658ae585d3c2a/download","mirrored":false},{"resource_id":"6499c929e8994ec5a8b5311e36eaf7a1","name":"3. BDF PAL Area Map.pdf","kind":"file","mime_type":".pdf","size_bytes":338474,"posted_at":"2025-05-22T12:21:12.673Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6499c929e8994ec5a8b5311e36eaf7a1/download","mirrored":false},{"resource_id":"fb5581e707924ab8ae9e11d917263003","name":"2. Statement of Work Line BAER.pdf","kind":"file","mime_type":".pdf","size_bytes":254173,"posted_at":"2025-05-22T12:21:12.673Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fb5581e707924ab8ae9e11d917263003/download","mirrored":false},{"resource_id":"ee8c6d2bd4cb410881cd7a94af5cf10e","name":"1. RFP 127EAW25R0031 Lake Fire Road Treatment Suppression Repair, BDF.pdf","kind":"file","mime_type":".pdf","size_bytes":613098,"posted_at":"2025-05-22T12:21:12.673Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ee8c6d2bd4cb410881cd7a94af5cf10e/download","mirrored":false},{"resource_id":"afd4ef2bbdd74fc7b29b26209bf3214c","name":"AMENDMENT 1 127EAW25R0031 Line Fire Road Treatment and Suppression Repair.pdf","kind":"file","mime_type":".pdf","size_bytes":990991,"posted_at":"2025-06-13T16:22:26.009Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/afd4ef2bbdd74fc7b29b26209bf3214c/download","mirrored":false},{"resource_id":"4e61bd35429842e18afca5607156b938","name":"Amendment 2 - 127EAW25R0031 - Line Fire Road Treatment and Suppression Repair.pdf","kind":"file","mime_type":".pdf","size_bytes":615822,"posted_at":"2025-06-13T18:54:34.242Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4e61bd35429842e18afca5607156b938/download","mirrored":false},{"resource_id":"a83e690a2a834ab481e017e32f167ff9","name":"12. Line Fire Guardrail.pdf","kind":"file","mime_type":".pdf","size_bytes":1046298,"posted_at":"2025-06-13T18:54:34.242Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a83e690a2a834ab481e017e32f167ff9/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_127EAW25C0018_12C2_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_127EAW25C0018_12C2_-NONE-_-NONE-/","piid":"127EAW25C0018","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"H6LZHL6SY1K8","recipient_name":"RODGERS, STEVEN R","recipient_uei":"H6LZHL6SY1K8","recipient_cage":"3V2V1","recipient_city":"ARCADIA","recipient_state":"CA","sub_name":"Forest Service","office_name":"USDA-FS, CSA SOUTHWEST 6","office_key":"o-127EAW","first_action_date":"2025-08-21","last_action_date":"2026-04-07","actions":2,"obligated":"8928.00","current_total_value":"8928.00","potential_total_value":"8928.00","naics":"237310","psc":"Z2LB","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SMALL BUSINESS SET ASIDE - TOTAL","offers_received":5,"description":"MORATORIUM CLASS EXCEPTION. FIRE. BURNED AREA EMERGENCY RESPONSE (BARE) LINE FIRE ROAD TREATMENT & SUPPRESSION REPAIR, SAN BERNADINO NF.","method":"solicitation","confidence":"high","evidence":["solicitation number 127EAW25R0031 equals the FPDS solicitation identifier","same awarding office 127EAW"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"127EAW27Q0002","latest_notice_id":"59c24c6aad3541448f35b465324ba88b","title":"Forest Service - Solar Batteries Frenchman Work Center","solicitation_number":"127EAW27Q0002","notice_type":"k","first_type":"k","first_posted":"2026-11-05","last_posted":"2026-11-17","notices":3,"due_at":"2026-11-28T00:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-28T00:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-127EAW","office_name":"USDA-FS, CSA SOUTHWEST 6","naics":"238210","psc":"N061","set_aside":"SBA","state":"CA","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"127EAW27Q0003","latest_notice_id":"c9f94fb331374177878eb4473741b7c7","title":"ANF Suppression Damage Chantry","solicitation_number":"127EAW27Q0003","notice_type":"k","first_type":"k","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-12-15T19:00:00Z","due_date":"2026-12-15","closes_at":"2026-12-15T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-127EAW","office_name":"USDA-FS, CSA SOUTHWEST 6","naics":"237310","psc":"Z2LB","set_aside":"SBA","state":"CA","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"}],"similar_open":[{"key":"N6247325R0004","latest_notice_id":"7aee513b670c4568b172f27fee5ed789","title":"IDIQ SMALL BUSINESS SET-ASIDE MACC FOR PAVING PROJECTS AT VARIOUS GOVERNMENT INSTALLATIONS LOCATED IN CA, AZ, NV, UT, CO, AND NM","solicitation_number":"N6247325R0004","notice_type":"o","first_type":"r","first_posted":"2025-03-20","last_posted":"2026-11-25","notices":3,"due_at":"2026-12-08T22:00:00Z","due_date":"2026-12-08","closes_at":"2026-12-08T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N62473","office_name":"NAVFACSYSCOM SOUTHWEST","naics":"237310","psc":"Z1LB","set_aside":"SBA","state":"CA","county":"06073","county_name":"San Diego County","city":"0666000","city_name":"San Diego","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-26T04:43:42.403930Z"},{"key":"1240LT27Q0026","latest_notice_id":"f4d8fcf758644e7ead926156453daa2e","title":"HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT","solicitation_number":"1240LT27Q0026","notice_type":"k","first_type":"k","first_posted":"2026-10-29","last_posted":"2026-11-20","notices":6,"due_at":"2026-12-12T00:00:00Z","due_date":"2026-12-11","closes_at":"2026-12-12T00:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-1282D7","office_name":"White River National Forest","naics":"237310","psc":"Y1LB","set_aside":null,"state":"CA","county":"06051","county_name":"Mono County","city":"0608240","city_name":"Bridgeport","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"127EAW27Q0003","latest_notice_id":"c9f94fb331374177878eb4473741b7c7","title":"ANF Suppression Damage Chantry","solicitation_number":"127EAW27Q0003","notice_type":"k","first_type":"k","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-12-15T19:00:00Z","due_date":"2026-12-15","closes_at":"2026-12-15T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-127EAW","office_name":"USDA-FS, CSA SOUTHWEST 6","naics":"237310","psc":"Z2LB","set_aside":"SBA","state":"CA","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"}],"similar_open_total":36,"indexable":false}