Sources sought
M2 Pavement Patching at Mendocino NF, Grindstone Ranger District
127EAW25Q0002
Forest Service, Usda-Fs, Csa Southwest 6. Highway, Street, and Bridge Construction.
Response deadline
May 1, 2025 at 5:00 PM EDT
Closed 574 days ago. Posted April 17, 2025. Scheduled to archive May 16, 2025.
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one closed in 2025
36 like it are open now in highway, street, and bridge construction
- IDIQ SMALL BUSINESS SET-ASIDE MACC FOR PAVING PROJECTS AT VARIOUS GOVERNMENT INSTALLATIONS LOCATED IN CA, AZ, NV, UT, CO, AND NM
Department of the Navy, Navfacsyscom Southwest
SolicitationSmall businessNAICS 237310San Diego, CAN6247325R0004Closes in 12 daysDec 8 - HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT
Forest Service, White River National Forest
Combined synopsis and solicitationNAICS 237310Bridgeport, CA1240LT27Q0026Closes in 16 daysDec 12 - ANF Suppression Damage Chantry
Forest Service, Usda-Fs, Csa Southwest 6
Combined synopsis and solicitationSmall businessNAICS 237310California127EAW27Q0003Closes in 19 daysDec 15
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of April 17, 2025. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The Forest Service (FS) is conducting a market survey to determine the interest and capability of contractors for a possible upcoming project. All costs associated with providing information in response to this market survey shall be the responsibility of the firm. Any information submitted is voluntary. The Contracting Officer will make an acquisition strategy determination based on the results of this market survey.
Prime contractors interested in working at Mendocino National Forest in the Grindstone Ranger District the work will consist of:
Providing all labor, materials, tools and other equipment necessary for:
1. Remove the existing chip seal and/or asphalt concrete (AC) surface.
2. Perform the repairs of the surface layer chip seal. Asphalt concrete may be either hot or warm mix and will conform to a currently approved mix meeting state (CAL-DOT) or federal (FP-14) specifications for similar applications. (see SPS 703).
3. Establish and maintain the approved traffic control plan for the duration of the site work.
We anticipate that work would begin in Summer 2025.
The NAICS code for this project is 237310, Highway, Street, and Bridge Construction, with a small business size standard of $45M. The Magnitude of Construction anticipated is between $25,000 and $100,000. Interested contractors should also consider their construction bonding capacities when responding.
Contractor must be registered as a small business under the listed socio-economic categories in SAM (System for Award Management) under NAICS code 237310 to be considered/confirmed.
Overview: This project will include all mobilization, work, labor, and materials to complete this work to include Prime/Subcontracting oversight as follows: The government anticipates that the work will include removal of damaged surface layer(s) of the road (mostly double chip seal with some AC patched areas), preparation of remaining surfaces, placing of AC patches, and augmentation of shoulder backing along the road. Project location from Corning, travel west on TC A9 (Corning Road) for 19.5 miles to Paskenta. Continue west on TC 122 (Toomes Camp Road) for 3.3 miles to the intersection with Forest Service M2 at Pellows Road (Private), mile post 0.00 (39.9046, -122.5974). Paskenta can also be reached from the south via SR 162 (west from Willows) and GC
306/TC 58. All specifications documents/drawings will be provided if/when the government proceeds with a formal solicitation.
Interested firms must submit the attached Market Research Sources Sought Survey.
This market research is bening conducted to acquire additional information about potential contractors that may be interested in performing this work. This is not an invitation for bid (IFB) or request for quote (RFQ) and does not constitute any commitment by the government to issue any solicitation. All interested firms must respond to future solicitation announcements separately from responses to this market survey. Any solicitation that may be issued will be posted on SAM.gov.
All responses must be submitted via email not later than 1400 PST, 1 May 2025. Email address: Richard.ortega@usda.gov. Include the reference number (127EAW25Q0002) in the subject line.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- MR_Sources_Sought_Survey - M2 Pavement Patching.docx21 KB, April 17, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 17, 2025
Sources sought
Due May 1, 2025 at 5:00 PM EDT. SAM.gov, notice ad1d1154aaf1493593ac8114f6ba29da
2 revisions on SAM
- April 17, 2025: publish, sources sought
- May 15, 2025: publish, combined synopsis and solicitation
Points of contact
- Richard Ortegarichard.ortega@usda.gov