{"canonical":"https://sealedbidder.com/opportunities/127eav26r0010","key":"127EAV26R0010","url":"https://sealedbidder.com/opportunities/127eav26r0010","title":"Trail Hardening MUT, Lake Loop Section","solicitation_number":"127EAV26R0010","notice_type":"a","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-05-08T19:00:00Z","first_posted":"2026-02-09","last_posted":"2026-08-15","department":"AGRICULTURE, DEPARTMENT OF","subagency":"FOREST SERVICE","office":"Southwestern Regional Office, Region 3","naics":"237990","psc":"Z1PA","set_aside":"SBA","place_state":"TX","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"48005","place_county_name":"Angelina County","place_city":"4845072","place_city_name":"Lufkin","winner":"TURNER, RAMIREZ AND ASSOCIATES, INC.","award_amount":"853352.94","publications":[{"notice_id":"835af6cdc73f4978ad41740fe79077e6","title":"Sam Houston Trail Bridge Replacement","solicitation_number":"127EAV26R0010","notice_type":"p","base_type":"p","posted":"2026-02-09","posted_at":"2026-02-09T15:26:30.311Z","due_at":"2026-02-23T19:00:00Z","due_date":"2026-02-23","cancelled":false,"archived":true,"archive_date":"2026-03-10","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/835af6cdc73f4978ad41740fe79077e6/view","enriched":true,"history":[{"index":3,"title":"Sam Houston Trail Bridge Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-09T16:42:40.035Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"fcef42a391894435a84ba68e941d5024","solicitation_number":"127EAV26R0010","parent_opportunity_id":"835af6cdc73f4978ad41740fe79077e6"},{"index":1,"title":"Sam Houston Trail Bridge Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-09T15:26:30.311Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"835af6cdc73f4978ad41740fe79077e6","solicitation_number":"127EAV26R0010"}]},{"notice_id":"fcef42a391894435a84ba68e941d5024","title":"Sam Houston Trail Bridge Replacement","solicitation_number":"127EAV26R0010","notice_type":"p","base_type":"p","posted":"2026-02-09","posted_at":"2026-02-09T16:42:40.035Z","due_at":"2026-02-23T19:00:00Z","due_date":"2026-02-23","cancelled":false,"archived":true,"archive_date":"2026-03-10","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/fcef42a391894435a84ba68e941d5024/view","enriched":true,"history":[{"index":3,"title":"Sam Houston Trail Bridge Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-09T16:42:40.035Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"fcef42a391894435a84ba68e941d5024","solicitation_number":"127EAV26R0010","parent_opportunity_id":"835af6cdc73f4978ad41740fe79077e6"},{"index":1,"title":"Sam Houston Trail Bridge Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-09T15:26:30.311Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"835af6cdc73f4978ad41740fe79077e6","solicitation_number":"127EAV26R0010"}]},{"notice_id":"4e70fcd5345f40bdbf3d4ec70acd3715","title":"Trail Hardening MUT, Lake Loop Section","solicitation_number":"127EAV26R0010","notice_type":"o","base_type":"o","posted":"2026-03-16","posted_at":"2026-03-17T00:08:01.649Z","due_at":"2026-04-17T21:00:00Z","due_date":"2026-04-17","cancelled":false,"archived":true,"archive_date":"2026-05-02","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/4e70fcd5345f40bdbf3d4ec70acd3715/view","enriched":true,"history":[{"index":5,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-14T14:35:37.864Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"7c466f7348d54bedaec484073aa1333f","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":3,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-17T00:29:49.699Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"89552b2ef2a2401f94623ee7a496cf56","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":2,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-17T00:08:01.649Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4e70fcd5345f40bdbf3d4ec70acd3715","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":1,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-16T23:59:26.998Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9c3959e4511a4657a046080c495ca7d7","solicitation_number":"127EAV26R0010"}]},{"notice_id":"89552b2ef2a2401f94623ee7a496cf56","title":"Trail Hardening MUT, Lake Loop Section","solicitation_number":"127EAV26R0010","notice_type":"o","base_type":"o","posted":"2026-03-16","posted_at":"2026-03-17T00:29:49.699Z","due_at":"2026-04-17T21:00:00Z","due_date":"2026-04-17","cancelled":false,"archived":true,"archive_date":"2026-05-02","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/89552b2ef2a2401f94623ee7a496cf56/view","enriched":true,"history":[{"index":5,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-14T14:35:37.864Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"7c466f7348d54bedaec484073aa1333f","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":3,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-17T00:29:49.699Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"89552b2ef2a2401f94623ee7a496cf56","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":2,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-17T00:08:01.649Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4e70fcd5345f40bdbf3d4ec70acd3715","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":1,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-16T23:59:26.998Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9c3959e4511a4657a046080c495ca7d7","solicitation_number":"127EAV26R0010"}]},{"notice_id":"9c3959e4511a4657a046080c495ca7d7","title":"Trail Hardening MUT, Lake Loop Section","solicitation_number":"127EAV26R0010","notice_type":"o","base_type":"o","posted":"2026-03-16","posted_at":"2026-03-16T23:59:26.998Z","due_at":"2026-04-17T21:00:00Z","due_date":"2026-04-17","cancelled":false,"archived":true,"archive_date":"2026-05-02","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/9c3959e4511a4657a046080c495ca7d7/view","enriched":true,"history":[{"index":5,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-14T14:35:37.864Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"7c466f7348d54bedaec484073aa1333f","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":3,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-17T00:29:49.699Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"89552b2ef2a2401f94623ee7a496cf56","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":2,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-17T00:08:01.649Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4e70fcd5345f40bdbf3d4ec70acd3715","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":1,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-16T23:59:26.998Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9c3959e4511a4657a046080c495ca7d7","solicitation_number":"127EAV26R0010"}]},{"notice_id":"7c466f7348d54bedaec484073aa1333f","title":"Trail Hardening MUT, Lake Loop Section","solicitation_number":"127EAV26R0010","notice_type":"o","base_type":"o","posted":"2026-04-14","posted_at":"2026-04-14T14:35:37.864Z","due_at":"2026-05-08T19:00:00Z","due_date":"2026-05-08","cancelled":false,"archived":true,"archive_date":"2026-05-23","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/7c466f7348d54bedaec484073aa1333f/view","enriched":true,"history":[{"index":8,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-15T23:27:45.330Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"05bc7d1e96e040879cfbce10e295839e","solicitation_number":"127EAV26R0010","related_opportunity_id":"7c466f7348d54bedaec484073aa1333f"},{"index":5,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-14T14:35:37.864Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"7c466f7348d54bedaec484073aa1333f","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":3,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-17T00:29:49.699Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"89552b2ef2a2401f94623ee7a496cf56","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":2,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-17T00:08:01.649Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4e70fcd5345f40bdbf3d4ec70acd3715","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":1,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-16T23:59:26.998Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9c3959e4511a4657a046080c495ca7d7","solicitation_number":"127EAV26R0010"}]},{"notice_id":"05bc7d1e96e040879cfbce10e295839e","title":"Trail Hardening MUT, Lake Loop Section","solicitation_number":"127EAV26R0010","notice_type":"a","base_type":"o","posted":"2026-08-15","posted_at":"2026-08-15T23:27:45.330Z","due_at":null,"due_date":null,"cancelled":false,"archived":true,"archive_date":"2026-08-28","removed_at":null,"award_number":"127EAV26C0007","awardee_name":"TURNER, RAMIREZ AND ASSOCIATES, INC.","amount":"853352.94","link_sam":"https://sam.gov/workspace/contract/opp/05bc7d1e96e040879cfbce10e295839e/view","enriched":true,"history":[{"index":5,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-15T23:27:45.330Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"05bc7d1e96e040879cfbce10e295839e","solicitation_number":"127EAV26R0010","related_opportunity_id":"7c466f7348d54bedaec484073aa1333f"},{"index":2,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-14T14:35:37.864Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"7c466f7348d54bedaec484073aa1333f","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"}]}],"latest_notice_id":"05bc7d1e96e040879cfbce10e295839e","first_type":"p","notices":[{"dates":{"posted":"2026-02-09","posted_at":"2026-02-09T15:26:30.311Z","created_at":"2026-02-09T15:11:35.421Z","modified_at":"2026-03-11T03:55:44.502Z","response_deadline":{"raw":"2026-02-23T12:00:00-07:00","utc":"2026-02-23T19:00:00Z","date":"2026-02-23","time":"12:00:00","timezone":"America/Denver","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/835af6cdc73f4978ad41740fe79077e6/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Sam Houston Trail Bridge Replacement","agency":{"office":{"code":"128371","name":"Southwestern Regional Office, Region 3"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"87102","city":"ALBUQUERQUE","state":"NM","country":"USA"},"organization_id":"100166305","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-03-10","archive_type":"auto15"},"history":[{"index":3,"title":"Sam Houston Trail Bridge Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-09T16:42:40.035Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"fcef42a391894435a84ba68e941d5024","solicitation_number":"127EAV26R0010","parent_opportunity_id":"835af6cdc73f4978ad41740fe79077e6"},{"index":1,"title":"Sam Houston Trail Bridge Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-09T15:26:30.311Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"835af6cdc73f4978ad41740fe79077e6","solicitation_number":"127EAV26R0010"}],"contacts":[{"name":"David Watson","role":"primary","email":"david.l.watson@usda.gov","phone":"480.204.9319"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"835af6cdc73f4978ad41740fe79077e6","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"835af6cdc73f4978ad41740fe79077e6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-14T00:50:02.009829897Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"e7164dfd4d5b589d9baa48cd32ca836688b215355e8640022c6f927edd515ed2","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-14T00:50:02.009829897Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<ol>\n\t<li>\n\t<ul>\n\t\t<li>This Project includes all labor, materials, equipment, supplies, travel, supervision, and incidentals necessary for the full design and construction of (<strong>18</strong>) Trail Bridges on the MUT (Multi-Use Trail) of the Sam Houston National Forest west of New Waverly, TX.&nbsp; Work includes:\n\t\t<ol>\n\t\t\t<li>Phase A: Site Investigation and Analysis</li>\n\t\t\t<li>Phase B: Design and Construction Document Preparation</li>\n\t\t\t<li>Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings, and construction and connecting of trail approaches from the existing trail to the new crossings.</li>\n\t\t</ol>\n\t\t</li>\n\t\t<li>The contractor may adopt a phased approach to completion of the crossings due to the number of sites as well as the varied locations and potential varied crossing types proposed.</li>\n\t</ul>\n\t</li>\n</ol>","text":"•\n\n• This Project includes all labor, materials, equipment, supplies, travel, supervision, and incidentals necessary for the full design and construction of (18) Trail Bridges on the MUT (Multi-Use Trail) of the Sam Houston National Forest west of New Waverly, TX. Work includes:\n\n• Phase A: Site Investigation and Analysis\n\n• Phase B: Design and Construction Document Preparation\n\n• Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings, and construction and connecting of trail approaches from the existing trail to the new crossings.\n\n• The contractor may adopt a phased approach to completion of the crossings due to the number of sites as well as the varied locations and potential varied crossing types proposed.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"127EAV26R0010","place_of_performance":{"zip":"75904","city":{"code":"45072","name":"Lufkin"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2PZ"},{"dates":{"posted":"2026-02-09","posted_at":"2026-02-09T16:42:40.035Z","created_at":"2026-02-09T16:41:52.274Z","modified_at":"2026-03-11T03:55:44.502Z","response_deadline":{"raw":"2026-02-23T12:00:00-07:00","utc":"2026-02-23T19:00:00Z","date":"2026-02-23","time":"12:00:00","timezone":"America/Denver","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/fcef42a391894435a84ba68e941d5024/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Sam Houston Trail Bridge Replacement","agency":{"office":{"code":"128371","name":"Southwestern Regional Office, Region 3"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"87102","city":"ALBUQUERQUE","state":"NM","country":"USA"},"organization_id":"100166305","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-03-10","archive_type":"auto15"},"history":[{"index":3,"title":"Sam Houston Trail Bridge Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-09T16:42:40.035Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"fcef42a391894435a84ba68e941d5024","solicitation_number":"127EAV26R0010","parent_opportunity_id":"835af6cdc73f4978ad41740fe79077e6"},{"index":1,"title":"Sam Houston Trail Bridge Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-09T15:26:30.311Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"835af6cdc73f4978ad41740fe79077e6","solicitation_number":"127EAV26R0010"}],"contacts":[{"name":"David Watson","role":"primary","email":"david.l.watson@usda.gov","phone":"480.204.9319"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"fcef42a391894435a84ba68e941d5024","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"835af6cdc73f4978ad41740fe79077e6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-14T01:13:34.539159702Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"f41db95574c36cfc7affafc4186cfb4c799aa7900bcda97bdebfbd8e8152a4e2","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-14T01:13:34.539159702Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<ol>\n\t<li>\n\t<ul>\n\t\t<li>This Project includes all labor, materials, equipment, supplies, travel, supervision, and incidentals necessary for the full design and construction of (<strong>18</strong>) Trail Bridges on the MUT (Multi-Use Trail) of the Sam Houston National Forest west of New Waverly, TX.&nbsp; Work includes:\n\t\t<ol>\n\t\t\t<li>Phase A: Site Investigation and Analysis</li>\n\t\t\t<li>Phase B: Design and Construction Document Preparation</li>\n\t\t\t<li>Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings, and construction and connecting of trail approaches from the existing trail to the new crossings.</li>\n\t\t</ol>\n\t\t</li>\n\t\t<li>The contractor may adopt a phased approach to completion of the crossings due to the number of sites as well as the varied locations and potential varied crossing types proposed.</li>\n\t</ul>\n\t</li>\n</ol>","text":"•\n\n• This Project includes all labor, materials, equipment, supplies, travel, supervision, and incidentals necessary for the full design and construction of (18) Trail Bridges on the MUT (Multi-Use Trail) of the Sam Houston National Forest west of New Waverly, TX. Work includes:\n\n• Phase A: Site Investigation and Analysis\n\n• Phase B: Design and Construction Document Preparation\n\n• Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings, and construction and connecting of trail approaches from the existing trail to the new crossings.\n\n• The contractor may adopt a phased approach to completion of the crossings due to the number of sites as well as the varied locations and potential varied crossing types proposed.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"127EAV26R0010","place_of_performance":{"zip":"75904","city":{"code":"45072","name":"Lufkin"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2PZ"},{"dates":{"posted":"2026-03-16","posted_at":"2026-03-17T00:08:01.649Z","created_at":"2026-03-17T00:05:57.502Z","modified_at":"2026-05-23T04:08:50.219Z","response_deadline":{"raw":"2026-04-17T15:00:00-06:00","utc":"2026-04-17T21:00:00Z","date":"2026-04-17","time":"15:00:00","timezone":"America/Denver","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/4e70fcd5345f40bdbf3d4ec70acd3715/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Trail Hardening MUT, Lake Loop Section","agency":{"office":{"code":"128371","name":"Southwestern Regional Office, Region 3"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"87102","city":"ALBUQUERQUE","state":"NM","country":"USA"},"organization_id":"100166305","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-05-02","archive_type":"auto15"},"history":[{"index":5,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-14T14:35:37.864Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"7c466f7348d54bedaec484073aa1333f","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":3,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-17T00:29:49.699Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"89552b2ef2a2401f94623ee7a496cf56","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":2,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-17T00:08:01.649Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4e70fcd5345f40bdbf3d4ec70acd3715","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":1,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-16T23:59:26.998Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9c3959e4511a4657a046080c495ca7d7","solicitation_number":"127EAV26R0010"}],"contacts":[{"name":"DAVID WATSON","role":"primary","email":"DAVID.L.WATSON@USDA.GOV","phone":"4802049319"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"4e70fcd5345f40bdbf3d4ec70acd3715","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"9c3959e4511a4657a046080c495ca7d7","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-11T03:01:00.452401093Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"6b61dae1d137816ff66b75223ad99a7bccdbda57152bd70a82afb892c005f98f","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-11T03:01:00.452401093Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p>1. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals and<br />\nsupervision to complete the project.<br />\n2. The contractor shall be responsible to verify the necessary quantities of materials to be<br />\nsupplied. It is suggested that the contractor visit the project site prior to turning in a<br />\nproposal.<br />\n3. There are no utilities available at the project site.<br />\n4. All work shall be done in accordance with this document, the project plans, and the FP-<br />\n14.<br />\n5. All trash, debris, rags, water bottles and any other assorted refuse that is not material to<br />\nbe incorporated into the work shall be removed daily.</p>\n\n<p></p>\n\n<p>1. Disclosure of the Magnitude of Construction (FAR 36.204)<br />\nIn accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $500,000 and $1,000,000.<br />\nThis magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate.<br />\n2. Site Visit<br />\nOfferors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work.<br />\nFailure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work.<br />\n3. Period of Performance<br />\nThe contractor shall complete all work required under this contract within 365 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract.<br />\nThe contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities.<br />\n4. Bonding Requirements<br />\nIn accordance with FAR 52.228-15, Performance and Payment Bonds&iquest;Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price.<br />\nThe required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award.<br />\n5. Differing Site Conditions<br />\nOfferors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.<br />\nQUESTIONS REGARDING THIS SOLICITATION ARE DUE THURSDAY APRIL 2, 2026.</p>","text":"1. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals and\n\nsupervision to complete the project.\n\n2. The contractor shall be responsible to verify the necessary quantities of materials to be\n\nsupplied. It is suggested that the contractor visit the project site prior to turning in a\n\nproposal.\n\n3. There are no utilities available at the project site.\n\n4. All work shall be done in accordance with this document, the project plans, and the FP-\n\n14.\n\n5. All trash, debris, rags, water bottles and any other assorted refuse that is not material to\n\nbe incorporated into the work shall be removed daily.\n\n1. Disclosure of the Magnitude of Construction (FAR 36.204)\n\nIn accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $500,000 and $1,000,000.\n\nThis magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate.\n\n2. Site Visit\n\nOfferors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work.\n\nFailure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work.\n\n3. Period of Performance\n\nThe contractor shall complete all work required under this contract within 365 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract.\n\nThe contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities.\n\n4. Bonding Requirements\n\nIn accordance with FAR 52.228-15, Performance and Payment Bonds¿Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price.\n\nThe required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award.\n\n5. Differing Site Conditions\n\nOfferors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.\n\nQUESTIONS REGARDING THIS SOLICITATION ARE DUE THURSDAY APRIL 2, 2026.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"127EAV26R0010","place_of_performance":{"zip":"77358","city":{"code":"51396","name":"New Waverly"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z1PA"},{"dates":{"posted":"2026-03-16","posted_at":"2026-03-17T00:29:49.699Z","created_at":"2026-03-17T00:28:18.796Z","modified_at":"2026-05-23T04:08:50.219Z","response_deadline":{"raw":"2026-04-17T15:00:00-06:00","utc":"2026-04-17T21:00:00Z","date":"2026-04-17","time":"15:00:00","timezone":"America/Denver","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/89552b2ef2a2401f94623ee7a496cf56/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Trail Hardening MUT, Lake Loop Section","agency":{"office":{"code":"128371","name":"Southwestern Regional Office, Region 3"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"87102","city":"ALBUQUERQUE","state":"NM","country":"USA"},"organization_id":"100166305","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-05-02","archive_type":"auto15"},"history":[{"index":5,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-14T14:35:37.864Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"7c466f7348d54bedaec484073aa1333f","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":3,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-17T00:29:49.699Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"89552b2ef2a2401f94623ee7a496cf56","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":2,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-17T00:08:01.649Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4e70fcd5345f40bdbf3d4ec70acd3715","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":1,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-16T23:59:26.998Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9c3959e4511a4657a046080c495ca7d7","solicitation_number":"127EAV26R0010"}],"contacts":[{"name":"DAVID WATSON","role":"primary","email":"DAVID.L.WATSON@USDA.GOV","phone":"4802049319"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"89552b2ef2a2401f94623ee7a496cf56","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"9c3959e4511a4657a046080c495ca7d7","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-11T03:10:52.097376598Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"5defa83cf9f3ed3dac79d91e55dbc119d54714061bcdb0db44a243c516ec214d","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-11T03:10:52.097376598Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p>1. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals and<br />\nsupervision to complete the project.<br />\n2. The contractor shall be responsible to verify the necessary quantities of materials to be<br />\nsupplied. It is suggested that the contractor visit the project site prior to turning in a<br />\nproposal.<br />\n3. There are no utilities available at the project site.<br />\n4. All work shall be done in accordance with this document, the project plans, and the FP-<br />\n14.<br />\n5. All trash, debris, rags, water bottles and any other assorted refuse that is not material to<br />\nbe incorporated into the work shall be removed daily.</p>\n\n<p></p>\n\n<p>1. Disclosure of the Magnitude of Construction (FAR 36.204)<br />\nIn accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $500,000 and $1,000,000.<br />\nThis magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate.<br />\n2. Site Visit<br />\nOfferors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work.<br />\nFailure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work.<br />\n3. Period of Performance<br />\nThe contractor shall complete all work required under this contract within 365 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract.<br />\nThe contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities.<br />\n4. Bonding Requirements<br />\nIn accordance with FAR 52.228-15, Performance and Payment Bonds&iquest;Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price.<br />\nThe required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award.<br />\n5. Differing Site Conditions<br />\nOfferors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.<br />\nQUESTIONS REGARDING THIS SOLICITATION ARE DUE THURSDAY APRIL 2, 2026.</p>","text":"1. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals and\n\nsupervision to complete the project.\n\n2. The contractor shall be responsible to verify the necessary quantities of materials to be\n\nsupplied. It is suggested that the contractor visit the project site prior to turning in a\n\nproposal.\n\n3. There are no utilities available at the project site.\n\n4. All work shall be done in accordance with this document, the project plans, and the FP-\n\n14.\n\n5. All trash, debris, rags, water bottles and any other assorted refuse that is not material to\n\nbe incorporated into the work shall be removed daily.\n\n1. Disclosure of the Magnitude of Construction (FAR 36.204)\n\nIn accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $500,000 and $1,000,000.\n\nThis magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate.\n\n2. Site Visit\n\nOfferors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work.\n\nFailure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work.\n\n3. Period of Performance\n\nThe contractor shall complete all work required under this contract within 365 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract.\n\nThe contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities.\n\n4. Bonding Requirements\n\nIn accordance with FAR 52.228-15, Performance and Payment Bonds¿Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price.\n\nThe required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award.\n\n5. Differing Site Conditions\n\nOfferors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.\n\nQUESTIONS REGARDING THIS SOLICITATION ARE DUE THURSDAY APRIL 2, 2026.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"127EAV26R0010","place_of_performance":{"zip":"75904","city":{"code":"45072","name":"Lufkin"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z1PA"},{"dates":{"posted":"2026-03-16","posted_at":"2026-03-16T23:59:26.998Z","created_at":"2026-03-16T23:39:42.831Z","modified_at":"2026-05-23T04:08:50.219Z","response_deadline":{"raw":"2026-04-17T15:00:00-06:00","utc":"2026-04-17T21:00:00Z","date":"2026-04-17","time":"15:00:00","timezone":"America/Denver","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/9c3959e4511a4657a046080c495ca7d7/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Trail Hardening MUT, Lake Loop Section","agency":{"office":{"code":"128371","name":"Southwestern Regional Office, Region 3"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"87102","city":"ALBUQUERQUE","state":"NM","country":"USA"},"organization_id":"100166305","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-05-02","archive_type":"auto15"},"history":[{"index":5,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-14T14:35:37.864Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"7c466f7348d54bedaec484073aa1333f","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":3,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-17T00:29:49.699Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"89552b2ef2a2401f94623ee7a496cf56","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":2,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-17T00:08:01.649Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4e70fcd5345f40bdbf3d4ec70acd3715","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":1,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-16T23:59:26.998Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9c3959e4511a4657a046080c495ca7d7","solicitation_number":"127EAV26R0010"}],"contacts":[{"name":"DAVID WATSON","role":"primary","email":"DAVID.L.WATSON@USDA.GOV","phone":"4802049319"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"9c3959e4511a4657a046080c495ca7d7","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"9c3959e4511a4657a046080c495ca7d7","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-11T03:12:13.100073854Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"6fc5e5a90c24fa113f8b69181689fdc40b2f0984af81b7b9a6acc78a8e3d5bce","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-11T03:12:13.100073854Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p>1. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals and<br />\nsupervision to complete the project.<br />\n2. The contractor shall be responsible to verify the necessary quantities of materials to be<br />\nsupplied. It is suggested that the contractor visit the project site prior to turning in a<br />\nproposal.<br />\n3. There are no utilities available at the project site.<br />\n4. All work shall be done in accordance with this document, the project plans, and the FP-<br />\n14.<br />\n5. All trash, debris, rags, water bottles and any other assorted refuse that is not material to<br />\nbe incorporated into the work shall be removed daily.</p>\n\n<p></p>\n\n<p>1. Disclosure of the Magnitude of Construction (FAR 36.204)<br />\nIn accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $500,000 and $1,000,000.<br />\nThis magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate.<br />\n2. Site Visit<br />\nOfferors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work.<br />\nFailure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work.<br />\n3. Period of Performance<br />\nThe contractor shall complete all work required under this contract within 365 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract.<br />\nThe contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities.<br />\n4. Bonding Requirements<br />\nIn accordance with FAR 52.228-15, Performance and Payment Bonds&iquest;Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price.<br />\nThe required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award.<br />\n5. Differing Site Conditions<br />\nOfferors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.<br />\n&nbsp;</p>","text":"1. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals and\n\nsupervision to complete the project.\n\n2. The contractor shall be responsible to verify the necessary quantities of materials to be\n\nsupplied. It is suggested that the contractor visit the project site prior to turning in a\n\nproposal.\n\n3. There are no utilities available at the project site.\n\n4. All work shall be done in accordance with this document, the project plans, and the FP-\n\n14.\n\n5. All trash, debris, rags, water bottles and any other assorted refuse that is not material to\n\nbe incorporated into the work shall be removed daily.\n\n1. Disclosure of the Magnitude of Construction (FAR 36.204)\n\nIn accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $500,000 and $1,000,000.\n\nThis magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate.\n\n2. Site Visit\n\nOfferors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work.\n\nFailure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work.\n\n3. Period of Performance\n\nThe contractor shall complete all work required under this contract within 365 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract.\n\nThe contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities.\n\n4. Bonding Requirements\n\nIn accordance with FAR 52.228-15, Performance and Payment Bonds¿Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price.\n\nThe required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award.\n\n5. Differing Site Conditions\n\nOfferors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"127EAV26R0010","place_of_performance":{"zip":"77358","city":{"code":"51396","name":"New Waverly"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z1PA"},{"dates":{"posted":"2026-04-14","posted_at":"2026-04-14T14:35:37.864Z","created_at":"2026-04-14T14:22:16.685Z","modified_at":"2026-05-23T04:08:50.219Z","response_deadline":{"raw":"2026-05-08T12:00:00-07:00","utc":"2026-05-08T19:00:00Z","date":"2026-05-08","time":"12:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/7c466f7348d54bedaec484073aa1333f/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Trail Hardening MUT, Lake Loop Section","agency":{"office":{"code":"128371","name":"Southwestern Regional Office, Region 3"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"87102","city":"ALBUQUERQUE","state":"NM","country":"USA"},"organization_id":"100166305","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-05-23","archive_type":"auto15"},"history":[{"index":8,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-15T23:27:45.330Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"05bc7d1e96e040879cfbce10e295839e","solicitation_number":"127EAV26R0010","related_opportunity_id":"7c466f7348d54bedaec484073aa1333f"},{"index":5,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-14T14:35:37.864Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"7c466f7348d54bedaec484073aa1333f","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":3,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-17T00:29:49.699Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"89552b2ef2a2401f94623ee7a496cf56","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":2,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-17T00:08:01.649Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4e70fcd5345f40bdbf3d4ec70acd3715","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"},{"index":1,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-16T23:59:26.998Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9c3959e4511a4657a046080c495ca7d7","solicitation_number":"127EAV26R0010"}],"contacts":[{"name":"DAVID WATSON","role":"primary","email":"DAVID.L.WATSON@USDA.GOV","phone":"4802049319"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"7c466f7348d54bedaec484073aa1333f","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"9c3959e4511a4657a046080c495ca7d7","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-07T00:54:26.603236788Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"fdad77a81f65dee4846e3fafc3e934f87547558f93f6af27eef53f161f11d3b5","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-07T00:54:26.603236788Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p>April 14, 2026</p>\n\n<p>Amendment 127EAV26R0010 P00001</p>\n\n<p>The purpose of this amendment is to extend the solicitation from April 17, 2026 15:00 MT to May 8, 2026 12:00 PM PST.</p>\n\n<p></p>\n\n<p>__________________________________________________________________</p>\n\n<p>1. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals and<br />\nsupervision to complete the project.<br />\n2. The contractor shall be responsible to verify the necessary quantities of materials to be<br />\nsupplied. It is suggested that the contractor visit the project site prior to turning in a<br />\nproposal.<br />\n3. There are no utilities available at the project site.<br />\n4. All work shall be done in accordance with this document, the project plans, and the FP-<br />\n14.<br />\n5. All trash, debris, rags, water bottles and any other assorted refuse that is not material to<br />\nbe incorporated into the work shall be removed daily.</p>\n\n<p></p>\n\n<p>1. Disclosure of the Magnitude of Construction (FAR 36.204)<br />\nIn accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $500,000 and $1,000,000.<br />\nThis magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate.<br />\n2. Site Visit<br />\nOfferors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work.<br />\nFailure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work.<br />\n3. Period of Performance<br />\nThe contractor shall complete all work required under this contract within 365 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract.<br />\nThe contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities.<br />\n4. Bonding Requirements<br />\nIn accordance with FAR 52.228-15, Performance and Payment Bonds&iquest;Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price.<br />\nThe required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award.<br />\n5. Differing Site Conditions<br />\nOfferors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.<br />\nQUESTIONS REGARDING THIS SOLICITATION ARE DUE THURSDAY APRIL 2, 2026.</p>","text":"April 14, 2026\n\nAmendment 127EAV26R0010 P00001\n\nThe purpose of this amendment is to extend the solicitation from April 17, 2026 15:00 MT to May 8, 2026 12:00 PM PST.\n\n__________________________________________________________________\n\n1. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals and\n\nsupervision to complete the project.\n\n2. The contractor shall be responsible to verify the necessary quantities of materials to be\n\nsupplied. It is suggested that the contractor visit the project site prior to turning in a\n\nproposal.\n\n3. There are no utilities available at the project site.\n\n4. All work shall be done in accordance with this document, the project plans, and the FP-\n\n14.\n\n5. All trash, debris, rags, water bottles and any other assorted refuse that is not material to\n\nbe incorporated into the work shall be removed daily.\n\n1. Disclosure of the Magnitude of Construction (FAR 36.204)\n\nIn accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $500,000 and $1,000,000.\n\nThis magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate.\n\n2. Site Visit\n\nOfferors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work.\n\nFailure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work.\n\n3. Period of Performance\n\nThe contractor shall complete all work required under this contract within 365 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract.\n\nThe contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities.\n\n4. Bonding Requirements\n\nIn accordance with FAR 52.228-15, Performance and Payment Bonds¿Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price.\n\nThe required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award.\n\n5. Differing Site Conditions\n\nOfferors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.\n\nQUESTIONS REGARDING THIS SOLICITATION ARE DUE THURSDAY APRIL 2, 2026.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"127EAV26R0010","place_of_performance":{"zip":"75904","city":{"code":"45072","name":"Lufkin"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z1PA"},{"award":{"date":"2026-08-13","amount":"853352.94","number":"127EAV26C0007","awardee":{"raw":"TURNER, RAMIREZ AND ASSOCIATES, INC. Corpus Christi TX 78411 USA","uei":"MK1FBNRMQME5","cage":"57UQ9","name":"TURNER, RAMIREZ AND ASSOCIATES, INC.","location":{"zip":"78411","city":{"code":"17000","name":"Corpus Christi"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}}}},"dates":{"posted":"2026-08-15","posted_at":"2026-08-15T23:27:45.330Z","award_date":"2026-08-13","created_at":"2026-08-15T20:35:03.782Z","modified_at":"2026-08-28T05:07:18.064Z"},"links":{"sam":"https://sam.gov/workspace/contract/opp/05bc7d1e96e040879cfbce10e295839e/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Trail Hardening MUT, Lake Loop Section","agency":{"office":{"code":"128371","name":"Southwestern Regional Office, Region 3"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"87102","city":"ALBUQUERQUE","state":"NM","country":"USA"},"organization_id":"100166305","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-08-28","archive_type":"auto15"},"history":[{"index":5,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-15T23:27:45.330Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"05bc7d1e96e040879cfbce10e295839e","solicitation_number":"127EAV26R0010","related_opportunity_id":"7c466f7348d54bedaec484073aa1333f"},{"index":2,"title":"Trail Hardening MUT, Lake Loop Section","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-14T14:35:37.864Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"7c466f7348d54bedaec484073aa1333f","solicitation_number":"127EAV26R0010","parent_opportunity_id":"9c3959e4511a4657a046080c495ca7d7"}],"contacts":[{"name":"DAVID WATSON","role":"primary","email":"DAVID.L.WATSON@USDA.GOV","phone":"4802049319"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"05bc7d1e96e040879cfbce10e295839e","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"9c3959e4511a4657a046080c495ca7d7","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-25T00:15:35.011240819Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T00:55:27.040971Z","row_sha256":"22a6f785ab9106c28aa7b9276c2bffaa59576442955562f80bfbeb0ab66137f9","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-25T00:15:35.011240819Z","first_seen_at":"2026-09-16T00:55:27.040971Z"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"127EAV26R0010","place_of_performance":{"zip":"75904","city":{"code":"45072","name":"Lufkin"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z1PA"}],"due_at":"2026-05-08T19:00:00Z","due_date":"2026-05-08","closes_at":"2026-05-08T19:00:00Z","awardable":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-128371","office_name":"Southwestern Regional Office, Region 3","state":"TX","county":"48005","county_name":"Angelina County","city":"4845072","city_name":"Lufkin","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"MK1FBNRMQME5","amount":"853352.94","linked_awards":7,"cancelled":false,"archived":true,"updated_at":"2026-09-25T00:32:56.537522Z","principal_notice_id":"7c466f7348d54bedaec484073aa1333f","description":{"text":"April 14, 2026\n\nAmendment 127EAV26R0010 P00001\n\nThe purpose of this amendment is to extend the solicitation from April 17, 2026 15:00 MT to May 8, 2026 12:00 PM PST.\n\n__________________________________________________________________\n\n1. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals and\n\nsupervision to complete the project.\n\n2. The contractor shall be responsible to verify the necessary quantities of materials to be\n\nsupplied. It is suggested that the contractor visit the project site prior to turning in a\n\nproposal.\n\n3. There are no utilities available at the project site.\n\n4. All work shall be done in accordance with this document, the project plans, and the FP-\n\n14.\n\n5. All trash, debris, rags, water bottles and any other assorted refuse that is not material to\n\nbe incorporated into the work shall be removed daily.\n\n1. Disclosure of the Magnitude of Construction (FAR 36.204)\n\nIn accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $500,000 and $1,000,000.\n\nThis magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate.\n\n2. Site Visit\n\nOfferors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work.\n\nFailure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work.\n\n3. Period of Performance\n\nThe contractor shall complete all work required under this contract within 365 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract.\n\nThe contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities.\n\n4. Bonding Requirements\n\nIn accordance with FAR 52.228-15, Performance and Payment Bonds¿Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price.\n\nThe required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award.\n\n5. Differing Site Conditions\n\nOfferors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.\n\nQUESTIONS REGARDING THIS SOLICITATION ARE DUE THURSDAY APRIL 2, 2026.","html":"<p>April 14, 2026</p>\n\n<p>Amendment 127EAV26R0010 P00001</p>\n\n<p>The purpose of this amendment is to extend the solicitation from April 17, 2026 15:00 MT to May 8, 2026 12:00 PM PST.</p>\n\n<p></p>\n\n<p>__________________________________________________________________</p>\n\n<p>1. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals and<br />\nsupervision to complete the project.<br />\n2. The contractor shall be responsible to verify the necessary quantities of materials to be<br />\nsupplied. It is suggested that the contractor visit the project site prior to turning in a<br />\nproposal.<br />\n3. There are no utilities available at the project site.<br />\n4. All work shall be done in accordance with this document, the project plans, and the FP-<br />\n14.<br />\n5. All trash, debris, rags, water bottles and any other assorted refuse that is not material to<br />\nbe incorporated into the work shall be removed daily.</p>\n\n<p></p>\n\n<p>1. Disclosure of the Magnitude of Construction (FAR 36.204)<br />\nIn accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $500,000 and $1,000,000.<br />\nThis magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate.<br />\n2. Site Visit<br />\nOfferors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work.<br />\nFailure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work.<br />\n3. Period of Performance<br />\nThe contractor shall complete all work required under this contract within 365 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract.<br />\nThe contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities.<br />\n4. Bonding Requirements<br />\nIn accordance with FAR 52.228-15, Performance and Payment Bonds&iquest;Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price.<br />\nThe required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award.<br />\n5. Differing Site Conditions<br />\nOfferors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.<br />\nQUESTIONS REGARDING THIS SOLICITATION ARE DUE THURSDAY APRIL 2, 2026.</p>","origin":"detail"},"contacts":[{"name":"DAVID WATSON","role":"primary","email":"DAVID.L.WATSON@USDA.GOV","phone":"4802049319"}],"place_of_performance":{"zip":"75904","city":{"code":"45072","name":"Lufkin"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"87102","city":"ALBUQUERQUE","state":"NM","country":"USA"},"naics_codes":["237990"],"award":null,"attachments":[{"resource_id":"76ed7626dc904f07b61fec55a9b3e2b5","name":"127EAV26R0010 Trail Hardening MUT Lake Loop Section 3.16.pdf","kind":"file","mime_type":".pdf","size_bytes":1207006,"posted_at":"2026-03-16T23:59:26.998Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/76ed7626dc904f07b61fec55a9b3e2b5/download","mirrored":false},{"resource_id":"ad708a03cf7c47b5bbb01d5ba6d5d8da","name":"Presolicitation Notice 127EAV26R0010 2.8.26.pdf","kind":"file","mime_type":".pdf","size_bytes":177819,"posted_at":"2026-02-09T15:26:30.311Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ad708a03cf7c47b5bbb01d5ba6d5d8da/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_127EAV26C0007_12C2_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_127EAV26C0007_12C2_-NONE-_-NONE-/","piid":"127EAV26C0007","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"MK1FBNRMQME5","recipient_name":"TURNER, RAMIREZ AND ASSOCIATES, INC.","recipient_uei":"MK1FBNRMQME5","recipient_cage":"57UQ9","recipient_city":"CORPUS CHRISTI","recipient_state":"TX","sub_name":"Forest Service","office_name":"USDA-FS, CSA SOUTHWEST 5","office_key":"o-127EAV","first_action_date":"2026-08-11","last_action_date":"2026-08-11","actions":1,"obligated":"853352.94","current_total_value":"853352.94","potential_total_value":"853352.94","naics":"237990","psc":"Z1PA","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SMALL BUSINESS SET ASIDE - TOTAL","offers_received":9,"description":"PERFORM DRAINAGE STRUCTURE AND SURFACING REPAIRS FOR THE ENTIRE LENGTH OF THE LAKE LOOP OF THE MULTIPLE USE TRAIL","method":"piid","confidence":"high","evidence":["award number 127EAV26C0007 equals the contract number","same sub-agency 12C2"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"1174190","latest_notice_id":"ab6e93fe20de4cba9394405251bef5f0","title":"US Forest Service Plumas National Forest Pest Control","solicitation_number":"1174190","notice_type":"k","first_type":"k","first_posted":"2026-11-18","last_posted":"2026-11-23","notices":3,"due_at":"2026-12-01T22:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-128371","office_name":"Southwestern Regional Office, Region 3","naics":"561710","psc":"S207","set_aside":"SBA","state":"CA","county":"06063","county_name":"Plumas County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Plumas National Forest","site_key":"plumas-national-forest-ca","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"}],"similar_open":[{"key":"W912HY27RA001","latest_notice_id":"2145e5cdeca0404db67d1f6c12adf421","title":"Houston Ship Channel (HSC) Expansion Channel Improvement Project (ECIP) 11, Package 9, Segment 4 Boggy Bayou to Sims Bayou","solicitation_number":"W912HY27RA001","notice_type":"o","first_type":"p","first_posted":"2026-09-24","last_posted":"2026-11-20","notices":7,"due_at":"2026-12-01T20:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HY","office_name":"W076 ENDIST GALVESTON","naics":"237990","psc":"Y1KF","set_aside":null,"state":"TX","county":null,"county_name":null,"city":"4835000","city_name":"Houston","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"W912HY26S1AX4","latest_notice_id":"2d6854a966894dcfa100ac6821550aa9","title":"FY26 Harlingen Placement Area (PA)13 and 10 Improvements","solicitation_number":"W912HY-26-S-1AX4","notice_type":"r","first_type":"r","first_posted":"2025-12-03","last_posted":"2025-12-03","notices":1,"due_at":"2026-12-17T16:00:00Z","due_date":"2026-12-17","closes_at":"2026-12-17T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HY","office_name":"W076 ENDIST GALVESTON","naics":"237990","psc":"Z1KF","set_aside":null,"state":"TX","county":"48061","county_name":"Cameron County","city":"4832372","city_name":"Harlingen","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-24T03:25:58.922164Z"},{"key":"FA890327OT001","latest_notice_id":"75e5efdecd5e4638857b6e7828ade272","title":"MACH1 AOI FA8903-27-OT-001 Horizontal Airfield Infrastructure","solicitation_number":"FA8903-27-OT-001","notice_type":"p","first_type":"p","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2027-01-15T16:00:00Z","due_date":"2027-01-15","closes_at":"2027-01-15T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA8903","office_name":"FA8903 772 ESS PK","naics":"237990","psc":"Y1BD","set_aside":null,"state":"TX","county":"48029","county_name":"Bexar County","city":"4865000","city_name":"San Antonio","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"}],"similar_open_total":144,"indexable":false}