{"canonical":"https://sealedbidder.com/opportunities/124pca27q0002","key":"124PCA27Q0002","url":"https://sealedbidder.com/opportunities/124pca27q0002","title":"USDA Design/Build Perimeter Security Enhancement Parking Lot 9","solicitation_number":"124PCA27Q0002","notice_type":"k","open":true,"removed":false,"removed_at":null,"response_deadline":"2027-01-06T19:00:00Z","first_posted":"2026-11-19","last_posted":"2026-11-19","department":"AGRICULTURE, DEPARTMENT OF","subagency":"USDA, DEPARTMENTAL ADMINISTRATION","office":"USDA, OCP-POD-ACQ-MGMT-BRANCH-FTC","naics":"237310","psc":"Z2LZ","set_aside":null,"place_state":"DC","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"11001","place_county_name":"District of Columbia","place_city":"1150000","place_city_name":"Washington","winner":null,"award_amount":null,"publications":[{"notice_id":"d3fce3c7270549ef89659e2d3afe299a","title":"USDA Design/Build Perimeter Security Enhancement Parking Lot 9","solicitation_number":"124PCA27Q0002","notice_type":"k","base_type":"k","posted":"2026-11-19","posted_at":"2026-11-20T01:23:39.979Z","due_at":"2027-01-06T19:00:00Z","due_date":"2027-01-06","cancelled":false,"archived":false,"archive_date":"2027-01-21","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d3fce3c7270549ef89659e2d3afe299a/view","enriched":true,"history":[{"index":1,"title":"USDA Design/Build Perimeter Security Enhancement Parking Lot 9","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-20T01:23:39.979Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"d3fce3c7270549ef89659e2d3afe299a","solicitation_number":"124PCA27Q0002"}]}],"latest_notice_id":"d3fce3c7270549ef89659e2d3afe299a","first_type":"k","notices":[{"dates":{"posted":"2026-11-19","posted_at":"2026-11-20T01:23:39.979Z","created_at":"2026-11-13T18:34:17.130Z","modified_at":"2026-11-20T01:23:39.986Z","response_deadline":{"raw":"2027-01-06T14:00:00-05:00","utc":"2027-01-06T19:00:00Z","date":"2027-01-06","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d3fce3c7270549ef89659e2d3afe299a/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"USDA Design/Build Perimeter Security Enhancement Parking Lot 9","agency":{"office":{"code":"123144","name":"USDA, OCP-POD-ACQ-MGMT-BRANCH-FTC"},"subtier":{"code":"1205","name":"USDA, DEPARTMENTAL ADMINISTRATION"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"80521","city":"FORT COLLINS","state":"CO","country":"USA"},"organization_id":"100181286","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2027-01-21","archive_type":"auto15"},"history":[{"index":1,"title":"USDA Design/Build Perimeter Security Enhancement Parking Lot 9","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-20T01:23:39.979Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"d3fce3c7270549ef89659e2d3afe299a","solicitation_number":"124PCA27Q0002"}],"contacts":[{"name":"Gerardo F. Rivera","role":"primary","email":"gerardo.rivera@usda.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"d3fce3c7270549ef89659e2d3afe299a","lineage_id":"d3fce3c7270549ef89659e2d3afe299a","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-20T08:01:26.279151457Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"c16e5e0dfa0d95d43d743e49e58247ca-28\"","fetched_at":"2026-11-20T05:29:17.372835729Z","row_sha256":"0dff3715b3279119c20aa57da7816490288b40c567a5690c950e9e169cc04f5b","last_modified":"2026-11-20T04:30:19Z"},"updated_at":"2026-11-20T08:01:26.279151457Z","first_seen_at":"2026-11-20T05:29:17.372835729Z"},"description":{"html":"<p>The site visit will be held on Wednesday, December 2, 2026, at 10:30 a.m. Eastern Standard Time (EST).&nbsp;Quoters who do not attend the <strong>mandatory site visit </strong>will be non-responsive offerors.</p>\n\n<p>USDA requires a Design/Build contractor to complete the rehabilitation of Parking Lot 9 at the Jamie L. Whitten Building in Washington, DC. The project includes perimeter security upgrades, parking lot resurfacing, sinkhole remediation, electrical work, and landscaping, and is a key component of a larger effort to establish Level IV security protection around the facility. The contractor must assess and update incomplete 2021 construction documents, verify the suitability of security materials already stored on site, and coordinate closely with WMATA due to the Orange, Blue, and Silver Metro lines running beneath the parking lot. After construction began in 2024, sinkholes developed near a WMATA elevator, halting work; therefore, the contractor must determine the full extent of subsurface issues and implement a remediation plan approved by both USDA and WMATA, incorporating recommendations from Langan&rsquo;s geotechnical investigation. With historic preservation approvals already secured and no work-hour restrictions in place, the project&rsquo;s objective is to restore progress on the halted construction and deliver the required Level IV perimeter security enhancements within eleven and a half months of Notice to Proceed (NTP) issuance.</p>","text":"The site visit will be held on Wednesday, December 2, 2026, at 10:30 a.m. Eastern Standard Time (EST). Quoters who do not attend the mandatory site visit will be non-responsive offerors.\n\nUSDA requires a Design/Build contractor to complete the rehabilitation of Parking Lot 9 at the Jamie L. Whitten Building in Washington, DC. The project includes perimeter security upgrades, parking lot resurfacing, sinkhole remediation, electrical work, and landscaping, and is a key component of a larger effort to establish Level IV security protection around the facility. The contractor must assess and update incomplete 2021 construction documents, verify the suitability of security materials already stored on site, and coordinate closely with WMATA due to the Orange, Blue, and Silver Metro lines running beneath the parking lot. After construction began in 2024, sinkholes developed near a WMATA elevator, halting work; therefore, the contractor must determine the full extent of subsurface issues and implement a remediation plan approved by both USDA and WMATA, incorporating recommendations from Langan’s geotechnical investigation. With historic preservation approvals already secured and no work-hour restrictions in place, the project’s objective is to restore progress on the halted construction and deliver the required Level IV perimeter security enhancements within eleven and a half months of Notice to Proceed (NTP) issuance.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"124PCA27Q0002","place_of_performance":{"zip":"20250","city":{"code":"50000","name":"Washington"},"state":{"code":"DC","name":"District of Columbia"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2LZ"}],"due_at":"2027-01-06T19:00:00Z","due_date":"2027-01-06","closes_at":"2027-01-06T19:00:00Z","awardable":true,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-1205","sub_name":"USDA, DEPARTMENTAL ADMINISTRATION","office_key":"o-123144","office_name":"USDA, OCP-POD-ACQ-MGMT-BRANCH-FTC","state":"DC","county":"11001","county_name":"District of Columbia","city":"1150000","city_name":"Washington","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-11-20T05:30:09.595354Z","principal_notice_id":"d3fce3c7270549ef89659e2d3afe299a","description":{"text":"The site visit will be held on Wednesday, December 2, 2026, at 10:30 a.m. Eastern Standard Time (EST). Quoters who do not attend the mandatory site visit will be non-responsive offerors.\n\nUSDA requires a Design/Build contractor to complete the rehabilitation of Parking Lot 9 at the Jamie L. Whitten Building in Washington, DC. The project includes perimeter security upgrades, parking lot resurfacing, sinkhole remediation, electrical work, and landscaping, and is a key component of a larger effort to establish Level IV security protection around the facility. The contractor must assess and update incomplete 2021 construction documents, verify the suitability of security materials already stored on site, and coordinate closely with WMATA due to the Orange, Blue, and Silver Metro lines running beneath the parking lot. After construction began in 2024, sinkholes developed near a WMATA elevator, halting work; therefore, the contractor must determine the full extent of subsurface issues and implement a remediation plan approved by both USDA and WMATA, incorporating recommendations from Langan’s geotechnical investigation. With historic preservation approvals already secured and no work-hour restrictions in place, the project’s objective is to restore progress on the halted construction and deliver the required Level IV perimeter security enhancements within eleven and a half months of Notice to Proceed (NTP) issuance.","html":"<p>The site visit will be held on Wednesday, December 2, 2026, at 10:30 a.m. Eastern Standard Time (EST).&nbsp;Quoters who do not attend the <strong>mandatory site visit </strong>will be non-responsive offerors.</p>\n\n<p>USDA requires a Design/Build contractor to complete the rehabilitation of Parking Lot 9 at the Jamie L. Whitten Building in Washington, DC. The project includes perimeter security upgrades, parking lot resurfacing, sinkhole remediation, electrical work, and landscaping, and is a key component of a larger effort to establish Level IV security protection around the facility. The contractor must assess and update incomplete 2021 construction documents, verify the suitability of security materials already stored on site, and coordinate closely with WMATA due to the Orange, Blue, and Silver Metro lines running beneath the parking lot. After construction began in 2024, sinkholes developed near a WMATA elevator, halting work; therefore, the contractor must determine the full extent of subsurface issues and implement a remediation plan approved by both USDA and WMATA, incorporating recommendations from Langan&rsquo;s geotechnical investigation. With historic preservation approvals already secured and no work-hour restrictions in place, the project&rsquo;s objective is to restore progress on the halted construction and deliver the required Level IV perimeter security enhancements within eleven and a half months of Notice to Proceed (NTP) issuance.</p>","origin":"detail"},"contacts":[{"name":"Gerardo F. Rivera","role":"primary","email":"gerardo.rivera@usda.gov"}],"place_of_performance":{"zip":"20250","city":{"code":"50000","name":"Washington"},"state":{"code":"DC","name":"District of Columbia"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"80521","city":"FORT COLLINS","state":"CO","country":"USA"},"naics_codes":["237310"],"award":null,"attachments":[{"resource_id":"b16900bdadf74ec0a7636ecb66c557c1","name":"Attachment 13 USDA Whitten 100pct Spec Submission R2 04.16.2021.pdf","kind":"file","mime_type":".pdf","size_bytes":3650837,"posted_at":"2026-11-20T01:23:39.979Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b16900bdadf74ec0a7636ecb66c557c1/download","mirrored":false},{"resource_id":"c2717b4647aa4b51b42e325d00906080","name":"Attachment 12 USDA Whitten Lot 9 100pct drawing submission 04.16.2021.pdf","kind":"file","mime_type":".pdf","size_bytes":29294166,"posted_at":"2026-11-20T01:23:39.979Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c2717b4647aa4b51b42e325d00906080/download","mirrored":false},{"resource_id":"27508c2a4ffc4265a7d19723f5d0e1b7","name":"Attachment 11 Langan Geotechnical Report 01.28.2026.pdf","kind":"file","mime_type":".pdf","size_bytes":10477587,"posted_at":"2026-11-20T01:23:39.979Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/27508c2a4ffc4265a7d19723f5d0e1b7/download","mirrored":false},{"resource_id":"f72de65174be4ee4b25f7117d3ea8bd6","name":"Attachment 10 Electrical Scope addendum by JPA Inc 10.29.2025.pdf","kind":"file","mime_type":".pdf","size_bytes":172375,"posted_at":"2026-11-20T01:23:39.979Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f72de65174be4ee4b25f7117d3ea8bd6/download","mirrored":false},{"resource_id":"b9ec00d36af24fda809894d6142931db","name":"Attachment 9 AECOM Drawing CIV 103 SITE AND UTILITY DRAWING.pdf","kind":"file","mime_type":".pdf","size_bytes":121900,"posted_at":"2026-11-20T01:23:39.979Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b9ec00d36af24fda809894d6142931db/download","mirrored":false},{"resource_id":"f5090f91cafe43248467c7a35209404a","name":"Attachment 8 SOW Original Lot 9 design reference only 06.20.2022.pdf","kind":"file","mime_type":".pdf","size_bytes":1235329,"posted_at":"2026-11-20T01:23:39.979Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f5090f91cafe43248467c7a35209404a/download","mirrored":false},{"resource_id":"9b3620fd48db49adac36673d8ccfb586","name":"Attachment 7 Signage and Pavement Marking Plan at Lot 9.pdf","kind":"file","mime_type":".pdf","size_bytes":61740,"posted_at":"2026-11-20T01:23:39.979Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9b3620fd48db49adac36673d8ccfb586/download","mirrored":false},{"resource_id":"6868bfbae2974f85a99bb4c664a1cb2a","name":"Attachment 6 Below Grade Metro Site Map at Lot 9.pdf","kind":"file","mime_type":".pdf","size_bytes":63061,"posted_at":"2026-11-20T01:23:39.979Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6868bfbae2974f85a99bb4c664a1cb2a/download","mirrored":false},{"resource_id":"ae06ef53bd224af8b1dff0b0cd72daa9","name":"Attachment 5 Location Map Lot 9.pdf","kind":"file","mime_type":".pdf","size_bytes":52159,"posted_at":"2026-11-20T01:23:39.979Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ae06ef53bd224af8b1dff0b0cd72daa9/download","mirrored":false},{"resource_id":"0e6fd6bbede840c1a1bbfe769c444a3a","name":"Attachment 4 Aerial view of USDA Headquarters.pdf","kind":"file","mime_type":".pdf","size_bytes":151152,"posted_at":"2026-11-20T01:23:39.979Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0e6fd6bbede840c1a1bbfe769c444a3a/download","mirrored":false},{"resource_id":"47ab09a359ac43b88ab16835de3ac866","name":"Attachment 3 Davis Bacon Wage Determination 11.13.2026.pdf","kind":"file","mime_type":".pdf","size_bytes":69420,"posted_at":"2026-11-20T01:23:39.979Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/47ab09a359ac43b88ab16835de3ac866/download","mirrored":false},{"resource_id":"0d5e91d0124a42989d3caec297cdfd32","name":"Attachment 2 FAR and AGAR Clauses.pdf","kind":"file","mime_type":".pdf","size_bytes":225208,"posted_at":"2026-11-20T01:23:39.979Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0d5e91d0124a42989d3caec297cdfd32/download","mirrored":false},{"resource_id":"3ae2bce6d4d942f9891089f8e83d29a9","name":"Attachment 1 SOW Lot 9 11.19.2026.pdf","kind":"file","mime_type":".pdf","size_bytes":334706,"posted_at":"2026-11-20T01:23:39.979Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3ae2bce6d4d942f9891089f8e83d29a9/download","mirrored":false},{"resource_id":"e1c80551f5ae4e14bf0950e99de26378","name":"RFQ 124PCA27Q0002 SF1442.pdf","kind":"file","mime_type":".pdf","size_bytes":106194,"posted_at":"2026-11-20T01:23:39.979Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e1c80551f5ae4e14bf0950e99de26378/download","mirrored":false},{"resource_id":"9a4704a6fced4a3e936a8b56feae17ce","name":"INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf","kind":"file","mime_type":".pdf","size_bytes":424237,"posted_at":"2026-11-20T01:23:39.979Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9a4704a6fced4a3e936a8b56feae17ce/download","mirrored":false}],"awards":[],"related":[{"key":"128PTA27Q0009","latest_notice_id":"f0ed4c4c231740429afb71f1f6ce9aeb","title":"Compliance Data Warehouse (CDW), HyDRA, HyDRA Maps, Analytics, Geospatial Services, and Operational Support","solicitation_number":"128PTA27Q0009","notice_type":"r","first_type":"r","first_posted":"2026-11-16","last_posted":"2026-11-17","notices":2,"due_at":"2026-11-30T13:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T13:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-1205","sub_name":"USDA, DEPARTMENTAL ADMINISTRATION","office_key":"o-123144","office_name":"USDA, OCP-POD-ACQ-MGMT-BRANCH-FTC","naics":"518210","psc":"R499","set_aside":null,"state":"DC","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"}],"similar_open":[{"key":"140FF027Q0077","latest_notice_id":"9702a20ddec44a6e9922c43ac0ad75d3","title":"56--AL-WHEELER NWR-WATERMAN GATE","solicitation_number":"140FF027Q0077","notice_type":"o","first_type":"o","first_posted":"2026-11-13","last_posted":"2026-11-16","notices":2,"due_at":"2026-11-27T20:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-014","dept_name":"INTERIOR, DEPARTMENT OF THE","sub_key":"s-1406","sub_name":"DEPARTMENTAL OFFICES","office_key":"o-140FF0","office_name":"FWS CONTRACTING ACTIVITY","naics":"237310","psc":"5630","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 5630)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"W912EK27BA003","latest_notice_id":"c45fd3f122574310b55bca1fb46014ff","title":"W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation","solicitation_number":"W912EK27BA003","notice_type":"p","first_type":"p","first_posted":"2026-10-07","last_posted":"2026-10-07","notices":1,"due_at":"2026-11-30T18:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912EK","office_name":"W07V ENDIST ROCK ISLAND","naics":"237310","psc":"Y1QA","set_aside":"8A","state":"MI","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"title","state_evidence":"W912EK27BA003 - DETROIT PROJECT OFFICE DETROIT, MI","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-08T03:46:32.887903Z"},{"key":"140PP027R0017","latest_notice_id":"891bd9ef5e094262963776917cbd638a","title":"Z--NPS Repair or Alteration of Highways, Roads, Streets, Trails and Bridges Multip","solicitation_number":"140PP027R0017","notice_type":"r","first_type":"r","first_posted":"2026-11-03","last_posted":"2026-11-03","notices":1,"due_at":"2026-11-30T19:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-014","dept_name":"INTERIOR, DEPARTMENT OF THE","sub_key":"s-1406","sub_name":"DEPARTMENTAL OFFICES","office_key":"o-140PP0","office_name":"NATIONAL PARK SERVICE CONTRACTING ACTIVITY","naics":"237310","psc":"Z2LB","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"WITHIN NATIONAL PARK SERVICE ASSETS NATIONWIDE","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-04T05:14:00.353426Z"}],"similar_open_total":35,"indexable":true}