{"canonical":"https://sealedbidder.com/opportunities/1240lu25q0041","key":"1240LU25Q0041","url":"https://sealedbidder.com/opportunities/1240lu25q0041","title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","solicitation_number":"1240LU25Q0041","notice_type":"k","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-09-16T17:00:00Z","first_posted":"2025-08-21","last_posted":"2025-09-05","department":"AGRICULTURE, DEPARTMENT OF","subagency":"FOREST SERVICE","office":"USDA-FS, CSA INTERMOUNTAIN 9","naics":"238990","psc":"5660","set_aside":"SBA","place_state":"MT","place_scope":"nationwide","site":null,"place_state_source":null,"place_evidence":null,"place_county":"30001","place_county_name":"Beaverhead County","place_city":"3020800","place_city_name":"Dillon","winner":"ANDERSON FENCING, INC.","award_amount":null,"publications":[{"notice_id":"9225d0660b194e11980e0f32144b7df1","title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","solicitation_number":"1240LU25Q0041","notice_type":"k","base_type":"k","posted":"2025-08-21","posted_at":"2025-08-21T20:15:24.540Z","due_at":"2025-09-16T17:00:00Z","due_date":"2025-09-16","cancelled":false,"archived":true,"archive_date":"2025-10-01","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/9225d0660b194e11980e0f32144b7df1/view","enriched":true,"history":[{"index":4,"title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-05T17:56:06.099Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"91b9dc7581124a93988faaae41b00bea","solicitation_number":"1240LU25Q0041","parent_opportunity_id":"9225d0660b194e11980e0f32144b7df1"},{"index":2,"title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-25T16:16:46.009Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"fac06a5181964ae8b273658234f932e4","solicitation_number":"1240LU25Q0041","parent_opportunity_id":"9225d0660b194e11980e0f32144b7df1"},{"index":1,"title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T20:15:24.540Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"9225d0660b194e11980e0f32144b7df1","solicitation_number":"1240LU25Q0041"}]},{"notice_id":"fac06a5181964ae8b273658234f932e4","title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","solicitation_number":"1240LU25Q0041","notice_type":"k","base_type":"k","posted":"2025-08-25","posted_at":"2025-08-25T16:16:46.009Z","due_at":"2025-09-16T17:00:00Z","due_date":"2025-09-16","cancelled":false,"archived":true,"archive_date":"2025-10-01","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/fac06a5181964ae8b273658234f932e4/view","enriched":true,"history":[{"index":4,"title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-05T17:56:06.099Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"91b9dc7581124a93988faaae41b00bea","solicitation_number":"1240LU25Q0041","parent_opportunity_id":"9225d0660b194e11980e0f32144b7df1"},{"index":2,"title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-25T16:16:46.009Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"fac06a5181964ae8b273658234f932e4","solicitation_number":"1240LU25Q0041","parent_opportunity_id":"9225d0660b194e11980e0f32144b7df1"},{"index":1,"title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T20:15:24.540Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"9225d0660b194e11980e0f32144b7df1","solicitation_number":"1240LU25Q0041"}]},{"notice_id":"91b9dc7581124a93988faaae41b00bea","title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","solicitation_number":"1240LU25Q0041","notice_type":"k","base_type":"k","posted":"2025-09-05","posted_at":"2025-09-05T17:56:06.099Z","due_at":"2025-09-16T17:00:00Z","due_date":"2025-09-16","cancelled":false,"archived":true,"archive_date":"2025-10-01","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/91b9dc7581124a93988faaae41b00bea/view","enriched":true,"history":[{"index":4,"title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-05T17:56:06.099Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"91b9dc7581124a93988faaae41b00bea","solicitation_number":"1240LU25Q0041","parent_opportunity_id":"9225d0660b194e11980e0f32144b7df1"},{"index":2,"title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-25T16:16:46.009Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"fac06a5181964ae8b273658234f932e4","solicitation_number":"1240LU25Q0041","parent_opportunity_id":"9225d0660b194e11980e0f32144b7df1"},{"index":1,"title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T20:15:24.540Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"9225d0660b194e11980e0f32144b7df1","solicitation_number":"1240LU25Q0041"}]}],"latest_notice_id":"91b9dc7581124a93988faaae41b00bea","first_type":"k","notices":[{"dates":{"posted":"2025-08-21","posted_at":"2025-08-21T20:15:24.540Z","created_at":"2025-08-18T20:03:25.525Z","modified_at":"2025-10-02T04:00:08.815Z","response_deadline":{"raw":"2025-09-16T11:00:00-06:00","utc":"2025-09-16T17:00:00Z","date":"2025-09-16","time":"11:00:00","timezone":"America/Denver","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/9225d0660b194e11980e0f32144b7df1/view"},"naics":{"codes":["238990"],"primary":"238990"},"title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","agency":{"office":{"code":"1240LU","name":"USDA-FS, CSA INTERMOUNTAIN 9"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"844012310","city":"Ogden","state":"UT","country":"USA"},"organization_id":"500169653","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-10-01","archive_type":"auto15"},"history":[{"index":4,"title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-05T17:56:06.099Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"91b9dc7581124a93988faaae41b00bea","solicitation_number":"1240LU25Q0041","parent_opportunity_id":"9225d0660b194e11980e0f32144b7df1"},{"index":2,"title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-25T16:16:46.009Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"fac06a5181964ae8b273658234f932e4","solicitation_number":"1240LU25Q0041","parent_opportunity_id":"9225d0660b194e11980e0f32144b7df1"},{"index":1,"title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T20:15:24.540Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"9225d0660b194e11980e0f32144b7df1","solicitation_number":"1240LU25Q0041"}],"contacts":[{"name":"Daniel Franco","role":"primary","email":"daniel.franco@usda.gov","phone":"520-388-8328"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"9225d0660b194e11980e0f32144b7df1","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"9225d0660b194e11980e0f32144b7df1","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-03T03:14:17.784274548Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"4c37c4dfa1cded765ab03cde8f41d9310cde03c8b6c4c75642f8034332feb211","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-03T03:14:17.784274548Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>C.1 SCOPE OF CONTRACT<br />\nThe intent of the contract is to provide for the construction of the work described. &nbsp;The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. &nbsp;Furnish all labor, equipment, tools, transportation, and supplies necessary to complete the work according to the contract. Fence materials will be provided by Forest Service.&nbsp;<br />\nThe work would consist of the removal and construction of 4-wire fence with associated braces and gates. Removal of all T-posts, fence wire and line braces, corner braces and line posts to clear the fence line for new construction.&nbsp;<br />\nWork covered under each Pay Item in the Schedule of Items includes:&nbsp;<br />\nPay Item No. 1 &ndash; Mobilization:&nbsp;<br />\nThe work shall consist of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site. &nbsp;<br />\nPay Item No. 1 &ndash;Remove wire posts and stays:&nbsp;<br />\nThe work shall consist of the removal of a 4- with steel and wood posts from Forest Service lands&nbsp;<br />\nPay Item No. 2 &ndash;Replace wire posts and stays:&nbsp;<br />\nThe work shall consist of the construction of a 4-wire (three barbed wire (top three) and one smooth wire (bottom wire) fence with steel posts. See Specifications for installation specs.&nbsp;<br />\nPay Item No. 3 &ndash; Remove and replace single brace:&nbsp;<br />\nThe work shall consist of the removal and construction of single braces. See Specifications for installation specs.&nbsp;Pay Item</p>\n\n<p>No. 4 &ndash; Remove and replace double brace:&nbsp;<br />\nThe work shall consist of the removal and construction of double braces. See Specifications for installation specs.&nbsp;<br />\nPay Item No. 5 &ndash; Installation of 14ft swing Gate:&nbsp;<br />\nThe work shall consist of the installation of a 14-foot swing gate. &nbsp;<br />\nPay Item No. 6 &ndash; Removal and replacement of 12ft wire gate:&nbsp;<br />\nThe work shall consist of the Removal and replacement of 12ft wire gate.&nbsp;<br />\nPay Item No. 7 &ndash; Removal and replacement of post and rail fence:&nbsp;<br />\nThe work shall consist of the installation of a 12-foot wire gate.&nbsp;</p>\n\n<p>C.2 PROJECT LOCATION<br />\nHorse Prairie Cabin<br />\n420 Barrett St, Dillon MT 59725</p>\n\n<p>C.3 MAGNITUDE OF CONSTRUCTION PROJECT<br />\nBetween $25,000 and $100,000.&nbsp;</p>\n\n<p>C.4 SITE VISIT<br />\nPer FAR Part 52.236-3 &ldquo;Site Investigation and Conditions Affecting the Work&rdquo;, contractor is encouraged and expected to visit the site. No official Site Visit shall be performed. Ensure you are familiar with inclement weather as this may hinder access to certain roads.&nbsp;</p>\n\n<p>C.5 PERIOD OF PERFORMANCE<br />\nWork on the site shall commence no earlier than October 01, 2025, and proceed in accordance with the contractor&rsquo;s approved work schedule and run continuously till the end of the project no later than September 30th, 2026.&nbsp;</p>","text":"C.1 SCOPE OF CONTRACT\n\nThe intent of the contract is to provide for the construction of the work described. The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. Furnish all labor, equipment, tools, transportation, and supplies necessary to complete the work according to the contract. Fence materials will be provided by Forest Service.\n\nThe work would consist of the removal and construction of 4-wire fence with associated braces and gates. Removal of all T-posts, fence wire and line braces, corner braces and line posts to clear the fence line for new construction.\n\nWork covered under each Pay Item in the Schedule of Items includes:\n\nPay Item No. 1 – Mobilization:\n\nThe work shall consist of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site.\n\nPay Item No. 1 –Remove wire posts and stays:\n\nThe work shall consist of the removal of a 4- with steel and wood posts from Forest Service lands\n\nPay Item No. 2 –Replace wire posts and stays:\n\nThe work shall consist of the construction of a 4-wire (three barbed wire (top three) and one smooth wire (bottom wire) fence with steel posts. See Specifications for installation specs.\n\nPay Item No. 3 – Remove and replace single brace:\n\nThe work shall consist of the removal and construction of single braces. See Specifications for installation specs. Pay Item\n\nNo. 4 – Remove and replace double brace:\n\nThe work shall consist of the removal and construction of double braces. See Specifications for installation specs.\n\nPay Item No. 5 – Installation of 14ft swing Gate:\n\nThe work shall consist of the installation of a 14-foot swing gate.\n\nPay Item No. 6 – Removal and replacement of 12ft wire gate:\n\nThe work shall consist of the Removal and replacement of 12ft wire gate.\n\nPay Item No. 7 – Removal and replacement of post and rail fence:\n\nThe work shall consist of the installation of a 12-foot wire gate.\n\nC.2 PROJECT LOCATION\n\nHorse Prairie Cabin\n\n420 Barrett St, Dillon MT 59725\n\nC.3 MAGNITUDE OF CONSTRUCTION PROJECT\n\nBetween $25,000 and $100,000.\n\nC.4 SITE VISIT\n\nPer FAR Part 52.236-3 “Site Investigation and Conditions Affecting the Work”, contractor is encouraged and expected to visit the site. No official Site Visit shall be performed. Ensure you are familiar with inclement weather as this may hinder access to certain roads.\n\nC.5 PERIOD OF PERFORMANCE\n\nWork on the site shall commence no earlier than October 01, 2025, and proceed in accordance with the contractor’s approved work schedule and run continuously till the end of the project no later than September 30th, 2026.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"1240LU25Q0041","place_of_performance":{"zip":"59725","city":{"code":"20800","name":"Dillon"},"state":{"code":"MT","name":"Montana"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"5660"},{"dates":{"posted":"2025-08-25","posted_at":"2025-08-25T16:16:46.009Z","created_at":"2025-08-25T15:48:04.595Z","modified_at":"2025-10-02T04:00:08.815Z","response_deadline":{"raw":"2025-09-16T11:00:00-06:00","utc":"2025-09-16T17:00:00Z","date":"2025-09-16","time":"11:00:00","timezone":"America/Denver","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/fac06a5181964ae8b273658234f932e4/view"},"naics":{"codes":["238990"],"primary":"238990"},"title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","agency":{"office":{"code":"1240LU","name":"USDA-FS, CSA INTERMOUNTAIN 9"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"844012310","city":"Ogden","state":"UT","country":"USA"},"organization_id":"500169653","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-10-01","archive_type":"auto15"},"history":[{"index":4,"title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-05T17:56:06.099Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"91b9dc7581124a93988faaae41b00bea","solicitation_number":"1240LU25Q0041","parent_opportunity_id":"9225d0660b194e11980e0f32144b7df1"},{"index":2,"title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-25T16:16:46.009Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"fac06a5181964ae8b273658234f932e4","solicitation_number":"1240LU25Q0041","parent_opportunity_id":"9225d0660b194e11980e0f32144b7df1"},{"index":1,"title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T20:15:24.540Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"9225d0660b194e11980e0f32144b7df1","solicitation_number":"1240LU25Q0041"}],"contacts":[{"name":"Daniel Franco","role":"primary","email":"daniel.franco@usda.gov","phone":"520-388-8328"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"fac06a5181964ae8b273658234f932e4","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"9225d0660b194e11980e0f32144b7df1","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-03T01:27:45.104287942Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"e1e435e83ecc5caf6054ede0f4d92208e4166f7266ab563b5124d85fa68af232","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-03T01:27:45.104287942Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>C.1 SCOPE OF CONTRACT<br />\nThe intent of the contract is to provide for the construction of the work described. &nbsp;The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. &nbsp;Furnish all labor, equipment, tools, transportation, and supplies necessary to complete the work according to the contract. Fence materials will be provided by Forest Service.&nbsp;<br />\nThe work would consist of the removal and construction of 4-wire fence with associated braces and gates. Removal of all T-posts, fence wire and line braces, corner braces and line posts to clear the fence line for new construction.&nbsp;<br />\nWork covered under each Pay Item in the Schedule of Items includes:&nbsp;<br />\nPay Item No. 1 &ndash; Mobilization:&nbsp;<br />\nThe work shall consist of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site. &nbsp;<br />\nPay Item No. 1 &ndash;Remove wire posts and stays:&nbsp;<br />\nThe work shall consist of the removal of a 4- with steel and wood posts from Forest Service lands&nbsp;<br />\nPay Item No. 2 &ndash;Replace wire posts and stays:&nbsp;<br />\nThe work shall consist of the construction of a 4-wire (three barbed wire (top three) and one smooth wire (bottom wire) fence with steel posts. See Specifications for installation specs.&nbsp;<br />\nPay Item No. 3 &ndash; Remove and replace single brace:&nbsp;<br />\nThe work shall consist of the removal and construction of single braces. See Specifications for installation specs.&nbsp;Pay Item</p>\n\n<p>No. 4 &ndash; Remove and replace double brace:&nbsp;<br />\nThe work shall consist of the removal and construction of double braces. See Specifications for installation specs.&nbsp;<br />\nPay Item No. 5 &ndash; Installation of 14ft swing Gate:&nbsp;<br />\nThe work shall consist of the installation of a 14-foot swing gate. &nbsp;<br />\nPay Item No. 6 &ndash; Removal and replacement of 12ft wire gate:&nbsp;<br />\nThe work shall consist of the Removal and replacement of 12ft wire gate.&nbsp;<br />\nPay Item No. 7 &ndash; Removal and replacement of post and rail fence:&nbsp;<br />\nThe work shall consist of the installation of a 12-foot wire gate.&nbsp;</p>\n\n<p>C.2 PROJECT LOCATION<br />\nHorse Prairie Cabin<br />\n420 Barrett St, Dillon MT 59725</p>\n\n<p>C.3 MAGNITUDE OF CONSTRUCTION PROJECT<br />\nBetween $25,000 and $100,000.&nbsp;</p>\n\n<p>C.4 SITE VISIT<br />\nPer FAR Part 52.236-3 &ldquo;Site Investigation and Conditions Affecting the Work&rdquo;, contractor is encouraged and expected to visit the site. No official Site Visit shall be performed. Ensure you are familiar with inclement weather as this may hinder access to certain roads.&nbsp;</p>\n\n<p>C.5 PERIOD OF PERFORMANCE<br />\nWork on the site shall commence no earlier than October 01, 2025, and proceed in accordance with the contractor&rsquo;s approved work schedule and run continuously till the end of the project no later than September 30th, 2026.&nbsp;</p>","text":"C.1 SCOPE OF CONTRACT\n\nThe intent of the contract is to provide for the construction of the work described. The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. Furnish all labor, equipment, tools, transportation, and supplies necessary to complete the work according to the contract. Fence materials will be provided by Forest Service.\n\nThe work would consist of the removal and construction of 4-wire fence with associated braces and gates. Removal of all T-posts, fence wire and line braces, corner braces and line posts to clear the fence line for new construction.\n\nWork covered under each Pay Item in the Schedule of Items includes:\n\nPay Item No. 1 – Mobilization:\n\nThe work shall consist of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site.\n\nPay Item No. 1 –Remove wire posts and stays:\n\nThe work shall consist of the removal of a 4- with steel and wood posts from Forest Service lands\n\nPay Item No. 2 –Replace wire posts and stays:\n\nThe work shall consist of the construction of a 4-wire (three barbed wire (top three) and one smooth wire (bottom wire) fence with steel posts. See Specifications for installation specs.\n\nPay Item No. 3 – Remove and replace single brace:\n\nThe work shall consist of the removal and construction of single braces. See Specifications for installation specs. Pay Item\n\nNo. 4 – Remove and replace double brace:\n\nThe work shall consist of the removal and construction of double braces. See Specifications for installation specs.\n\nPay Item No. 5 – Installation of 14ft swing Gate:\n\nThe work shall consist of the installation of a 14-foot swing gate.\n\nPay Item No. 6 – Removal and replacement of 12ft wire gate:\n\nThe work shall consist of the Removal and replacement of 12ft wire gate.\n\nPay Item No. 7 – Removal and replacement of post and rail fence:\n\nThe work shall consist of the installation of a 12-foot wire gate.\n\nC.2 PROJECT LOCATION\n\nHorse Prairie Cabin\n\n420 Barrett St, Dillon MT 59725\n\nC.3 MAGNITUDE OF CONSTRUCTION PROJECT\n\nBetween $25,000 and $100,000.\n\nC.4 SITE VISIT\n\nPer FAR Part 52.236-3 “Site Investigation and Conditions Affecting the Work”, contractor is encouraged and expected to visit the site. No official Site Visit shall be performed. Ensure you are familiar with inclement weather as this may hinder access to certain roads.\n\nC.5 PERIOD OF PERFORMANCE\n\nWork on the site shall commence no earlier than October 01, 2025, and proceed in accordance with the contractor’s approved work schedule and run continuously till the end of the project no later than September 30th, 2026.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"1240LU25Q0041","place_of_performance":{"zip":"59725","city":{"code":"20800","name":"Dillon"},"state":{"code":"MT","name":"Montana"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"5660"},{"dates":{"posted":"2025-09-05","posted_at":"2025-09-05T17:56:06.099Z","created_at":"2025-09-05T17:45:04.712Z","modified_at":"2025-10-02T04:00:08.815Z","response_deadline":{"raw":"2025-09-16T11:00:00-06:00","utc":"2025-09-16T17:00:00Z","date":"2025-09-16","time":"11:00:00","timezone":"America/Denver","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/91b9dc7581124a93988faaae41b00bea/view"},"naics":{"codes":["238990"],"primary":"238990"},"title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","agency":{"office":{"code":"1240LU","name":"USDA-FS, CSA INTERMOUNTAIN 9"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"844012310","city":"Ogden","state":"UT","country":"USA"},"organization_id":"500169653","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-10-01","archive_type":"auto15"},"history":[{"index":4,"title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-05T17:56:06.099Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"91b9dc7581124a93988faaae41b00bea","solicitation_number":"1240LU25Q0041","parent_opportunity_id":"9225d0660b194e11980e0f32144b7df1"},{"index":2,"title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-25T16:16:46.009Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"fac06a5181964ae8b273658234f932e4","solicitation_number":"1240LU25Q0041","parent_opportunity_id":"9225d0660b194e11980e0f32144b7df1"},{"index":1,"title":"Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-21T20:15:24.540Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"9225d0660b194e11980e0f32144b7df1","solicitation_number":"1240LU25Q0041"}],"contacts":[{"name":"Daniel Franco","role":"primary","email":"daniel.franco@usda.gov","phone":"520-388-8328"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"91b9dc7581124a93988faaae41b00bea","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"9225d0660b194e11980e0f32144b7df1","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-01T00:50:08.382528125Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"87829428745d9fb9f81a368bacd9f036f17e1191b8b7e0a25e0c649786a44295","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-01T00:50:08.382528125Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><strong>Amendment 0001 09/05/2025:</strong></p>\n\n<p>Add Questions and Answers document</p>\n\n<p>Add document:&nbsp;5 Big hollow disaster fence location</p>\n\n<p>Add document: 6- Example Fence Segment Condition Pictures</p>\n\n<p></p>\n\n<p></p>\n\n<p>C.1 SCOPE OF CONTRACT<br />\nThe intent of the contract is to provide for the construction of the work described. &nbsp;The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. &nbsp;Furnish all labor, equipment, tools, transportation, and supplies necessary to complete the work according to the contract. Fence materials will be provided by Forest Service.&nbsp;<br />\nThe work would consist of the removal and construction of 4-wire fence with associated braces and gates. Removal of all T-posts, fence wire and line braces, corner braces and line posts to clear the fence line for new construction.&nbsp;<br />\nWork covered under each Pay Item in the Schedule of Items includes:&nbsp;<br />\nPay Item No. 1 &ndash; Mobilization:&nbsp;<br />\nThe work shall consist of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site. &nbsp;<br />\nPay Item No. 1 &ndash;Remove wire posts and stays:&nbsp;<br />\nThe work shall consist of the removal of a 4- with steel and wood posts from Forest Service lands&nbsp;<br />\nPay Item No. 2 &ndash;Replace wire posts and stays:&nbsp;<br />\nThe work shall consist of the construction of a 4-wire (three barbed wire (top three) and one smooth wire (bottom wire) fence with steel posts. See Specifications for installation specs.&nbsp;<br />\nPay Item No. 3 &ndash; Remove and replace single brace:&nbsp;<br />\nThe work shall consist of the removal and construction of single braces. See Specifications for installation specs.&nbsp;Pay Item</p>\n\n<p>No. 4 &ndash; Remove and replace double brace:&nbsp;<br />\nThe work shall consist of the removal and construction of double braces. See Specifications for installation specs.&nbsp;<br />\nPay Item No. 5 &ndash; Installation of 14ft swing Gate:&nbsp;<br />\nThe work shall consist of the installation of a 14-foot swing gate. &nbsp;<br />\nPay Item No. 6 &ndash; Removal and replacement of 12ft wire gate:&nbsp;<br />\nThe work shall consist of the Removal and replacement of 12ft wire gate.&nbsp;<br />\nPay Item No. 7 &ndash; Removal and replacement of post and rail fence:&nbsp;<br />\nThe work shall consist of the installation of a 12-foot wire gate.&nbsp;</p>\n\n<p>C.2 PROJECT LOCATION<br />\nHorse Prairie Cabin<br />\n420 Barrett St, Dillon MT 59725</p>\n\n<p>C.3 MAGNITUDE OF CONSTRUCTION PROJECT<br />\nBetween $25,000 and $100,000.&nbsp;</p>\n\n<p>C.4 SITE VISIT<br />\nPer FAR Part 52.236-3 &ldquo;Site Investigation and Conditions Affecting the Work&rdquo;, contractor is encouraged and expected to visit the site. No official Site Visit shall be performed. Ensure you are familiar with inclement weather as this may hinder access to certain roads.&nbsp;</p>\n\n<p>C.5 PERIOD OF PERFORMANCE<br />\nWork on the site shall commence no earlier than October 01, 2025, and proceed in accordance with the contractor&rsquo;s approved work schedule and run continuously till the end of the project no later than September 30th, 2026.&nbsp;</p>","text":"Amendment 0001 09/05/2025:\n\nAdd Questions and Answers document\n\nAdd document: 5 Big hollow disaster fence location\n\nAdd document: 6- Example Fence Segment Condition Pictures\n\nC.1 SCOPE OF CONTRACT\n\nThe intent of the contract is to provide for the construction of the work described. The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. Furnish all labor, equipment, tools, transportation, and supplies necessary to complete the work according to the contract. Fence materials will be provided by Forest Service.\n\nThe work would consist of the removal and construction of 4-wire fence with associated braces and gates. Removal of all T-posts, fence wire and line braces, corner braces and line posts to clear the fence line for new construction.\n\nWork covered under each Pay Item in the Schedule of Items includes:\n\nPay Item No. 1 – Mobilization:\n\nThe work shall consist of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site.\n\nPay Item No. 1 –Remove wire posts and stays:\n\nThe work shall consist of the removal of a 4- with steel and wood posts from Forest Service lands\n\nPay Item No. 2 –Replace wire posts and stays:\n\nThe work shall consist of the construction of a 4-wire (three barbed wire (top three) and one smooth wire (bottom wire) fence with steel posts. See Specifications for installation specs.\n\nPay Item No. 3 – Remove and replace single brace:\n\nThe work shall consist of the removal and construction of single braces. See Specifications for installation specs. Pay Item\n\nNo. 4 – Remove and replace double brace:\n\nThe work shall consist of the removal and construction of double braces. See Specifications for installation specs.\n\nPay Item No. 5 – Installation of 14ft swing Gate:\n\nThe work shall consist of the installation of a 14-foot swing gate.\n\nPay Item No. 6 – Removal and replacement of 12ft wire gate:\n\nThe work shall consist of the Removal and replacement of 12ft wire gate.\n\nPay Item No. 7 – Removal and replacement of post and rail fence:\n\nThe work shall consist of the installation of a 12-foot wire gate.\n\nC.2 PROJECT LOCATION\n\nHorse Prairie Cabin\n\n420 Barrett St, Dillon MT 59725\n\nC.3 MAGNITUDE OF CONSTRUCTION PROJECT\n\nBetween $25,000 and $100,000.\n\nC.4 SITE VISIT\n\nPer FAR Part 52.236-3 “Site Investigation and Conditions Affecting the Work”, contractor is encouraged and expected to visit the site. No official Site Visit shall be performed. Ensure you are familiar with inclement weather as this may hinder access to certain roads.\n\nC.5 PERIOD OF PERFORMANCE\n\nWork on the site shall commence no earlier than October 01, 2025, and proceed in accordance with the contractor’s approved work schedule and run continuously till the end of the project no later than September 30th, 2026.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"1240LU25Q0041","place_of_performance":{"zip":"59725","city":{"code":"20800","name":"Dillon"},"state":{"code":"MT","name":"Montana"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"5660"}],"due_at":"2025-09-16T17:00:00Z","due_date":"2025-09-16","closes_at":"2025-09-16T17:00:00Z","awardable":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-1240LU","office_name":"USDA-FS, CSA INTERMOUNTAIN 9","state":"MT","county":"30001","county_name":"Beaverhead County","city":"3020800","city_name":"Dillon","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"WKZMMV6F9NB1","amount":null,"linked_awards":3,"cancelled":false,"archived":true,"updated_at":"2026-11-01T01:14:45.755866Z","principal_notice_id":"91b9dc7581124a93988faaae41b00bea","description":{"text":"Amendment 0001 09/05/2025:\n\nAdd Questions and Answers document\n\nAdd document: 5 Big hollow disaster fence location\n\nAdd document: 6- Example Fence Segment Condition Pictures\n\nC.1 SCOPE OF CONTRACT\n\nThe intent of the contract is to provide for the construction of the work described. The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. Furnish all labor, equipment, tools, transportation, and supplies necessary to complete the work according to the contract. Fence materials will be provided by Forest Service.\n\nThe work would consist of the removal and construction of 4-wire fence with associated braces and gates. Removal of all T-posts, fence wire and line braces, corner braces and line posts to clear the fence line for new construction.\n\nWork covered under each Pay Item in the Schedule of Items includes:\n\nPay Item No. 1 – Mobilization:\n\nThe work shall consist of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site.\n\nPay Item No. 1 –Remove wire posts and stays:\n\nThe work shall consist of the removal of a 4- with steel and wood posts from Forest Service lands\n\nPay Item No. 2 –Replace wire posts and stays:\n\nThe work shall consist of the construction of a 4-wire (three barbed wire (top three) and one smooth wire (bottom wire) fence with steel posts. See Specifications for installation specs.\n\nPay Item No. 3 – Remove and replace single brace:\n\nThe work shall consist of the removal and construction of single braces. See Specifications for installation specs. Pay Item\n\nNo. 4 – Remove and replace double brace:\n\nThe work shall consist of the removal and construction of double braces. See Specifications for installation specs.\n\nPay Item No. 5 – Installation of 14ft swing Gate:\n\nThe work shall consist of the installation of a 14-foot swing gate.\n\nPay Item No. 6 – Removal and replacement of 12ft wire gate:\n\nThe work shall consist of the Removal and replacement of 12ft wire gate.\n\nPay Item No. 7 – Removal and replacement of post and rail fence:\n\nThe work shall consist of the installation of a 12-foot wire gate.\n\nC.2 PROJECT LOCATION\n\nHorse Prairie Cabin\n\n420 Barrett St, Dillon MT 59725\n\nC.3 MAGNITUDE OF CONSTRUCTION PROJECT\n\nBetween $25,000 and $100,000.\n\nC.4 SITE VISIT\n\nPer FAR Part 52.236-3 “Site Investigation and Conditions Affecting the Work”, contractor is encouraged and expected to visit the site. No official Site Visit shall be performed. Ensure you are familiar with inclement weather as this may hinder access to certain roads.\n\nC.5 PERIOD OF PERFORMANCE\n\nWork on the site shall commence no earlier than October 01, 2025, and proceed in accordance with the contractor’s approved work schedule and run continuously till the end of the project no later than September 30th, 2026.","html":"<p><strong>Amendment 0001 09/05/2025:</strong></p>\n\n<p>Add Questions and Answers document</p>\n\n<p>Add document:&nbsp;5 Big hollow disaster fence location</p>\n\n<p>Add document: 6- Example Fence Segment Condition Pictures</p>\n\n<p></p>\n\n<p></p>\n\n<p>C.1 SCOPE OF CONTRACT<br />\nThe intent of the contract is to provide for the construction of the work described. &nbsp;The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. &nbsp;Furnish all labor, equipment, tools, transportation, and supplies necessary to complete the work according to the contract. Fence materials will be provided by Forest Service.&nbsp;<br />\nThe work would consist of the removal and construction of 4-wire fence with associated braces and gates. Removal of all T-posts, fence wire and line braces, corner braces and line posts to clear the fence line for new construction.&nbsp;<br />\nWork covered under each Pay Item in the Schedule of Items includes:&nbsp;<br />\nPay Item No. 1 &ndash; Mobilization:&nbsp;<br />\nThe work shall consist of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site. &nbsp;<br />\nPay Item No. 1 &ndash;Remove wire posts and stays:&nbsp;<br />\nThe work shall consist of the removal of a 4- with steel and wood posts from Forest Service lands&nbsp;<br />\nPay Item No. 2 &ndash;Replace wire posts and stays:&nbsp;<br />\nThe work shall consist of the construction of a 4-wire (three barbed wire (top three) and one smooth wire (bottom wire) fence with steel posts. See Specifications for installation specs.&nbsp;<br />\nPay Item No. 3 &ndash; Remove and replace single brace:&nbsp;<br />\nThe work shall consist of the removal and construction of single braces. See Specifications for installation specs.&nbsp;Pay Item</p>\n\n<p>No. 4 &ndash; Remove and replace double brace:&nbsp;<br />\nThe work shall consist of the removal and construction of double braces. See Specifications for installation specs.&nbsp;<br />\nPay Item No. 5 &ndash; Installation of 14ft swing Gate:&nbsp;<br />\nThe work shall consist of the installation of a 14-foot swing gate. &nbsp;<br />\nPay Item No. 6 &ndash; Removal and replacement of 12ft wire gate:&nbsp;<br />\nThe work shall consist of the Removal and replacement of 12ft wire gate.&nbsp;<br />\nPay Item No. 7 &ndash; Removal and replacement of post and rail fence:&nbsp;<br />\nThe work shall consist of the installation of a 12-foot wire gate.&nbsp;</p>\n\n<p>C.2 PROJECT LOCATION<br />\nHorse Prairie Cabin<br />\n420 Barrett St, Dillon MT 59725</p>\n\n<p>C.3 MAGNITUDE OF CONSTRUCTION PROJECT<br />\nBetween $25,000 and $100,000.&nbsp;</p>\n\n<p>C.4 SITE VISIT<br />\nPer FAR Part 52.236-3 &ldquo;Site Investigation and Conditions Affecting the Work&rdquo;, contractor is encouraged and expected to visit the site. No official Site Visit shall be performed. Ensure you are familiar with inclement weather as this may hinder access to certain roads.&nbsp;</p>\n\n<p>C.5 PERIOD OF PERFORMANCE<br />\nWork on the site shall commence no earlier than October 01, 2025, and proceed in accordance with the contractor&rsquo;s approved work schedule and run continuously till the end of the project no later than September 30th, 2026.&nbsp;</p>","origin":"detail"},"contacts":[{"name":"Daniel Franco","role":"primary","email":"daniel.franco@usda.gov","phone":"520-388-8328"}],"place_of_performance":{"zip":"59725","city":{"code":"20800","name":"Dillon"},"state":{"code":"MT","name":"Montana"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"844012310","city":"Ogden","state":"UT","country":"USA"},"naics_codes":["238990"],"award":null,"attachments":[{"resource_id":"7bbc6f22e21145128fed8b54575daac5","name":"4- WD MT20250075 07182025.pdf","kind":"file","mime_type":".pdf","size_bytes":35314,"posted_at":"2025-08-21T20:15:24.540Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7bbc6f22e21145128fed8b54575daac5/download","mirrored":false},{"resource_id":"fb29f63cd1f14ea4a43b05f924750d74","name":"5 Big hollow disaster fence location.docx","kind":"file","mime_type":".docx","size_bytes":1773709,"posted_at":"2025-08-25T16:16:46.009Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fb29f63cd1f14ea4a43b05f924750d74/download","mirrored":false},{"resource_id":"32617a74209a48078a989a30f0f3f61d","name":"Example Fence Segment Condition Pictures.pdf","kind":"file","mime_type":".pdf","size_bytes":14492065,"posted_at":"2025-09-05T17:56:06.099Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/32617a74209a48078a989a30f0f3f61d/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_1240LU25C0033_12C2_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_1240LU25C0033_12C2_-NONE-_-NONE-/","piid":"1240LU25C0033","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"WKZMMV6F9NB1","recipient_name":"ANDERSON FENCING, INC.","recipient_uei":"WKZMMV6F9NB1","recipient_cage":"3F9V3","recipient_city":"DILLON","recipient_state":"MT","sub_name":"Forest Service","office_name":"USDA-FS, CSA INTERMOUNTAIN 9","office_key":"o-1240LU","first_action_date":"2025-09-25","last_action_date":"2025-09-25","actions":1,"obligated":"36402.50","current_total_value":"36402.50","potential_total_value":"36402.50","naics":"238990","psc":"Z2PA","extent_competed":"COMPETED UNDER SAP","set_aside":"SMALL BUSINESS SET ASIDE - TOTAL","offers_received":15,"description":"DISASTER FENCE RECONSTRUCTION CONTRACT","method":"solicitation","confidence":"high","evidence":["solicitation number 1240LU25Q0041 equals the FPDS solicitation identifier","same awarding office 1240LU"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"1240LU26Q0132","latest_notice_id":"7772e7cbaf1a46409b142ded751c8ec8","title":"USDA Forest Service - Hebgen Lake District Office Network Cabling and IT Room Improvements","solicitation_number":"1240LU26Q0132","notice_type":"k","first_type":"k","first_posted":"2026-09-24","last_posted":"2026-11-05","notices":4,"due_at":"2026-11-26T00:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-26T00:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-1240LU","office_name":"USDA-FS, CSA INTERMOUNTAIN 9","naics":"238210","psc":"N061","set_aside":"SBA","state":"MT","county":"30031","county_name":"Gallatin County","city":"3079525","city_name":"West Yellowstone","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-06T04:46:59.158685Z"},{"key":"1240LU27Q0001","latest_notice_id":"b2028c69fd754cedad731652b882eee6","title":"GAOA Powell Duplex Improvements, Nez Perce - Clearwater National Forest","solicitation_number":"1240LU27Q0001","notice_type":"k","first_type":"k","first_posted":"2026-10-14","last_posted":"2026-11-23","notices":3,"due_at":"2026-12-12T01:00:00Z","due_date":"2026-12-11","closes_at":"2026-12-12T01:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-1240LU","office_name":"USDA-FS, CSA INTERMOUNTAIN 9","naics":"236118","psc":"Y1FA","set_aside":"SBA","state":"ID","county":null,"county_name":null,"city":"1642400","city_name":"Kamiah","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Clearwater National Forest","site_key":"clearwater-national-forest-id","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"}],"similar_open":[{"key":"2027TYNDALLGATR15","latest_notice_id":"12fcfc711496424997c41223aecc8bff","title":"Sources sought GATR grounding","solicitation_number":"2027TYNDALLGATR15","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-11-27T20:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA4819","office_name":"FA4819 325 CONS PKP","naics":"238990","psc":"Y1BG","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"N4008527NORFPGREATLAKESROICC5395","latest_notice_id":"2e3f6b5013164071b01ff8e72cc9ebcf","title":"Investigation, Repairs, and Removal and Disposal of Marine Attachments to Raw Water Intake","solicitation_number":"N40085-27-NORFP-GREAT-LAKES-ROICC-5395","notice_type":"r","first_type":"r","first_posted":"2026-11-04","last_posted":"2026-11-04","notices":1,"due_at":"2026-11-30T19:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N40085","office_name":"NAVFACSYSCOM MID-ATLANTIC","naics":"238990","psc":"Z2NZ","set_aside":null,"state":"IL","county":"17097","county_name":"Lake County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-05T04:36:35.392694Z"},{"key":"SP470327Q0004","latest_notice_id":"17d74d55f88145b98e25a59e35a337a2","title":"Door Repair IDPO; Defense Supply Center Richmond(DSCR)","solicitation_number":"SP470327Q0004","notice_type":"p","first_type":"p","first_posted":"2026-11-05","last_posted":"2026-11-16","notices":3,"due_at":"2026-12-03T22:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SP4703","office_name":"DCSO RICHMOND DIVISION #1","naics":"238990","psc":"Z1PZ","set_aside":"SBA","state":"VA","county":"51041","county_name":"Chesterfield County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"}],"similar_open_total":19,"indexable":false}