Solicitation, total small business set-aside
CUSTER GALLATIN NATIONAL FOREST - West Fork Beaver Creek Trail #222 Flood Repair
1240LU24R0021
Forest Service, Custer Gallatin National Forest. Other Heavy and Civil Engineering Construction.
Response deadline
August 29, 2024 at 6:00 PM EDT
Closed 819 days ago. Posted July 29, 2024. Scheduled to archive September 30, 2024.
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one closed in 2024
143 like it are open now in other heavy and civil engineering construction
- United States Air Force Academy (USAFA) Varsity Baseball Stadium
Department of the Army, W071 Endist Omaha
PresolicitationSmall businessNAICS 237990ColoradoNAF128F27B0001Due tomorrowNov 27 - Thomas J O???????????????????????????Brien Lock and Dam Major Rehabilitation ??????????????????????????? Construction, Chicago, Cook County, Illinois
Department of the Army, W072 Endist Chicago
Sources soughtNAICS 237990IllinoisPANGLR26P0000029409Due tomorrowNov 27 - Dredged Material Containment Area (DMCA) O&M Construction IDC
Department of the Army, W074 Endist Savannah
Sources soughtNAICS 237990Savannah, GAW912HN27RA006Due tomorrowNov 27
All 143 open in other heavy and civil engineering construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 237990 (other heavy and civil engineering construction), means no more than $45 million in average annual receipts, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 31 days from the day the solicitation was posted, July 29, 2024, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
PROJECT DESCRIPTION: Hand construct approximately 560 feet of new 72” wide, full bench stock trail through two washed out avalanche ravines, within a non-motorized wilderness designation. Work includes new trail construction with picks, rock bars, jack hammers, drilling and blasting. New construction is within extremely steep slopes, loose soils, extensive rock, eroding rock cliffs, outcroppings, and bedrock.
Repeated, extensive surface and subsurface drilling and blasting will likely be necessary along numerous sections within these ravines to establish a 72” full bench trail, and remove excess material from the backslope and hillside above the trail. A full bench trail cut down to a solid subsurface material will be crucial to trail longevity. Backslope will be reduced to a 4:3 ratio in mixed material, and a 5:2 within rock. Material to be excavated is estimated at 962 cubic yards.
Hand construct a 48” wide bench approximately 20’ above the new trail location, near the top of the trail’s planned cut slope. This bench will serve to catch falling rock and debris from above during trail excavation, as well as provide a safe platform to begin excavation below, and an anchor point for rope work. Backslope will be reduced to a 5:2 ratio above this bench. Material to be excavated is estimated at 268 cubic yards.
Restore approximately 13,366 lineal feet of existing trail to the desired specification of a 36” width trail prism with a 24” finished tread. Backslope will be reduced to a 3:2 ratio. Restoration includes reconstructing and cleaning existing drain dips and water bars.
PROJECT LOCATION: The project is located within a non-motorized wilderness designation within the Madison Mountain range approximately 22 miles northwest of West Yellowstone, MT. From West Yellowstone, follow north on highway 191 approximately 8 miles. Turn left or west on highway 287, and follow for approximately 14 miles to the Beaver Creek road, between Hebgen and Earthquake lakes. Turn right or north on Beaver Creek road #985, and follow for three miles to the West Fork Beaver Creek trailhead and beginning of project. MAGNITUDE OF CONSTRUCTION (per FAR 36.204(b)): Between $250,000 and $500,000.
BONDING: All offerors will be required to provide a Bid Bond (20%) with their proposal submission. Performance and Payment Bonds (100% each) will be required of the successful awardee. There is no formal site visit for this project. Vendors are strongly encouraged to visit the site prior to submitting their proposal. For site information, clarification on directions and site conditions (such as closures, snow levels, etc.) please contact Todd Orr, Engineer Tech, Custer Gallatin National Forest at 406-587-6741 (todd.orr@usda.gov) during normal business hours.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 29, 2024
Solicitation, originally presolicitation
Due August 29, 2024 at 6:00 PM EDT. SAM.gov, notice c1f91b10d6514d14b597fa9fbb485a08
Points of contact
- Alisha Knaubalisha.knaub@usda.gov4064382981