# CUSTER GALLATIN NATIONAL FOREST - West Fork Beaver Creek Trail #222 Flood Repair

Canonical: https://sealedbidder.com/opportunities/1240lu24r0016

- Solicitation number: 1240LU24R0016
- Notice type: Solicitation (first published as presolicitation)
- Status: Closed. Deadline was July 11, 2024 at 6:00 PM EDT
- Department: Department of Agriculture
- Agency: Forest Service
- Contracting office: Custer Gallatin National Forest (120398)
- NAICS: 237990 Other Heavy and Civil Engineering Construction
- Product or service code: Y1PA Construction Of Recreation Facilities (Non-Building)
- Set-aside: Total small business set-aside
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 237990)
- Place of performance: Montana
- First posted: May 20, 2024
- Last posted: June 18, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/1698be12cc894751a05501f6144871e3/view

## Reading this notice

- Kind of notice: Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline.
- Who may compete: Total small business set-aside. Only small businesses may compete. Small, under NAICS 237990 (other heavy and civil engineering construction), means no more than $45 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders had 30 days from the day the solicitation was posted, June 11, 2024, to the deadline. The deadline moved once: it was first July 10, 2024 and ended as July 11, 2024.
- Before the solicitation: The agency published a presolicitation on May 20, 2024, 22 days before the solicitation.

## Description

**PROJECT DESCRIPTION:** Hand construct approximately 560 feet of new 72” wide, full bench stock trail through two washed out avalanche ravines, within a non-motorized wilderness designation. Work includes new trail construction with picks, rock bars, jack hammers, drilling and blasting. New construction is within extremely steep slopes, loose soils, extensive rock, eroding rock cliffs, outcroppings, and bedrock.

Repeated, extensive surface and subsurface drilling and blasting will likely be necessary along numerous sections within these ravines to establish a 72” full bench trail, and remove excess material from the backslope and hillside above the trail. A full bench trail cut down to a solid subsurface material will be crucial to trail longevity. Backslope will be reduced to a 4:3 ratio in mixed material, and a 5:2 within rock. Material to be excavated is estimated at 962 cubic yards.

Hand construct a 48” wide bench approximately 20’ above the new trail location, near the top of the trail’s planned cut slope. This bench will serve to catch falling rock and debris from above during trail excavation, as well as provide a safe platform to begin excavation below, and an anchor point for rope work. Backslope will be reduced to a 5:2 ratio above this bench. Material to be excavated is estimated at 268 cubic yards.

Restore approximately 13,366 lineal feet of existing trail to the desired specification of a 36” width trail prism with a 24” finished tread. Backslope will be reduced to a 3:2 ratio. Restoration includes reconstructing and cleaning existing drain dips and water bars.

**PROJECT LOCATION:** The project is located within a non-motorized wilderness designation within the Madison Mountain range approximately 22 miles northwest of West Yellowstone, MT. From West Yellowstone, follow north on highway 191 approximately 8 miles. Turn left or west on highway 287, and follow for approximately 14 miles to the Beaver Creek road, between Hebgen and Earthquake lakes. Turn right or north on Beaver Creek road #985, and follow for three miles to the West Fork Beaver Creek trailhead and beginning of project. MAGNITUDE OF CONSTRUCTION (per FAR 36.204(b)): Between $250,000 and $500,000.

**BONDING:** All offerors will be required to provide a Bid Bond (20%) with their proposal submission. Performance and Payment Bonds (100% each) will be required of the successful awardee. There is no formal site visit for this project. Vendors are strongly encouraged to visit the site prior to submitting their proposal. For site information, clarification on directions and site conditions (such as closures, snow levels, etc.) please contact Todd Orr, Engineer Tech, Custer Gallatin National Forest at 406-587-6741 (todd.orr@usda.gov) during normal business hours. Question & Answers #1 - Posted 6/18/2024

## Open now in the same industry

143 open in NAICS 237990.

- United States Air Force Academy (USAFA) Varsity Baseball Stadium (NAF128F27B0001), due November 27, 2026 at 3:00 AM EST. https://sealedbidder.com/opportunities/naf128f27b0001
- Thomas J O???????????????????????????Brien Lock and Dam Major Rehabilitation ??????????????????????????? Construction, Chicago, Cook County, Illinois (PANGLR26P0000029409), due November 27, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/panglr26p0000029409
- Dredged Material Containment Area (DMCA) O&M Construction IDC (W912HN27RA006), due November 27, 2026 at 6:00 PM EST. https://sealedbidder.com/opportunities/w912hn27ra006

## Publications

- May 20, 2024: Presolicitation, due July 10, 2024 at 6:00 PM EDT. Notice 99c8cec9ade04ac4af9b175004f1941c. https://sam.gov/workspace/contract/opp/99c8cec9ade04ac4af9b175004f1941c/view
- June 11, 2024: Solicitation, due July 11, 2024 at 6:00 PM EDT. Notice 61b25aad105f4fae83fde9fc7aadb549. https://sam.gov/workspace/contract/opp/61b25aad105f4fae83fde9fc7aadb549/view
- June 18, 2024: Solicitation, due July 11, 2024 at 6:00 PM EDT. Notice 1698be12cc894751a05501f6144871e3. https://sam.gov/workspace/contract/opp/1698be12cc894751a05501f6144871e3/view

## Points of contact

- Alisha Knaub, alisha.knaub@usda.gov, 4064382981

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/1240lu24r0016.