Solicitation
SUMMIT VIEW WATER SYSTEM PIPE REPLACEMENT
1240LT26Q0136
Forest Service, White River National Forest. Water and Sewer Line and Related Structures Construction.
Response deadline
July 30, 2026 at 7:00 PM EDT
Closed 118 days ago. Posted July 29, 2026, first published July 20, 2026. Scheduled to archive August 14, 2026.
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one closed in 2026
25 like it are open now in water and sewer line and related structures construction
- Ross Springs Waterline Replacement
Forest Service, Ashley National Forest
Combined synopsis and solicitationSmall businessNAICS 237110Utah1240LT27Q0022Due in 6 daysDec 1 - HAVO 326181 Rehabilitate Rainshed&Water Treatment
National Park Service, DSC Contracting Services Division
SolicitationNAICS 237110Hawaii140P2026R0091Due in 3 daysNov 28 - New Meadows Range Barn
Forest Service, Payette National Forest
Combined synopsis and solicitationSmall businessNAICS 237110Idaho1240LT27Q0027Due in 4 daysNov 29
All 25 open in water and sewer line and related structures construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237110 (water and sewer line and related structures construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 10 days from the day the solicitation was posted, July 20, 2026, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Rev. 1
7/29/2026 - Documents Revised
C04_1240LT26Q0136_RFQ
C04b_Specifications
*All revisions consist of administrative wording only and have no impact on the terms or timelines.
Summit View Water System Replacement
Montpelier Ranger District of the Caribou-Targhee National Forest
Bear Lake County, Idaho
- Posting: 7/20/2026
- Site Visit: Contact COR for Access
- Q&A Due Date: 07/27/2026
- Quotes Due Date: 07/30/2026
- Anticipated Award Date: 08/05/2026
This project includes the replacement of waterline originating at Thompson Spring and servicing the Summit View Campground to be preformed IAW documentation and specifications attached.
The work includes removing and replacing approximately 1770 feet of waterline, from the sheep trough T to the iodinator. Replacement includes 2” minimum diameter HDPE waterline, pipe zone bedding, utility locating system, an air release valve, drains, and backflow preventer, along with incidentals like heat fusion joints and trenching.
Quantities associated with these options are identified in the Schedule of Items.
The project is located on the Montpelier Ranger District of the Caribou-Targhee National Forest, Bear Lake County, Idaho, in Section 15, T 10 S, R 44 E. It is located approximately 20 miles North of Montpelier, Idaho. The project may be accessed from State Highway 30 and Left-Hand Georgetown Canyon Road (42.5528° N, 111.2957° W).
Firm Fixed Price Contract
Price Range $40,000.00k - $60,000.00
Questions should be directed to the COR:
Mary Jenkins
mary.jenkins@usda.gov
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- C04a_Schedule of Items.xlsx12 KB, July 20, 2026
- C04f - Past Performance Data Sheet.pdf76 KB, July 20, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 20, 2026
Solicitation
Due July 30, 2026 at 7:00 PM EDT. SAM.gov, notice 3720df6aa9574009b3dd6f671f4afc19
2 revisions on SAM
- July 29, 2026: publish, solicitation
- July 20, 2026: publish, solicitation
July 29, 2026
Solicitation
Due July 30, 2026 at 7:00 PM EDT. SAM.gov, notice 96a7e8836be24479aa555b0a3c0dc574
2 revisions on SAM
- July 29, 2026: publish, solicitation
- July 20, 2026: publish, solicitation
Points of contact
- Lonnie D Root, Contracting Officerlonnie.root@usda.gov
- Mary Jenkinsmary.jenkins@usda.gov