Combined synopsis and solicitation, total small business set-aside
Upper Baker Installing Trailer Pads and Utilities
1240LT26Q0126
Forest Service, Manti-Lasal National Forest. Water and Sewer Line and Related Structures Construction.
Response deadline
August 10, 2026 at 7:00 PM EDT
Closed 108 days ago. Posted July 7, 2026. Scheduled to archive August 25, 2026.
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one closed in 2026
25 like it are open now in water and sewer line and related structures construction
- Ross Springs Waterline Replacement
Forest Service, Ashley National Forest
Combined synopsis and solicitationSmall businessNAICS 237110Utah1240LT27Q0022Due in 5 daysDec 1 - HAVO 326181 Rehabilitate Rainshed&Water Treatment
National Park Service, DSC Contracting Services Division
SolicitationNAICS 237110Hawaii140P2026R0091Due in 2 daysNov 28 - New Meadows Range Barn
Forest Service, Payette National Forest
Combined synopsis and solicitationSmall businessNAICS 237110Idaho1240LT27Q0027Due in 3 daysNov 29
All 25 open in water and sewer line and related structures construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 237110 (water and sewer line and related structures construction), means no more than $45 million in average annual receipts, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 34 days from the day the solicitation was posted, July 7, 2026, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
This contract is comprised of installing utility lines, connections to existing lines and connections to trailer pads. Utilities included are electrical, water and sewer. Option items included are trenching, providing and spreading gravel and installation of an asphalt apron. Water and Sewer lines and connections must be kept 10ft apart. Contractor must work with and is responsible for all communications, supplies and permits with utility companies associated. All utilities will be installed in compliance with State and/or San Juan County code.
Utilities –
Water - The new water line will be connected to the existing water line between the meter and bunkhouse. Main water line will remain same size as existing line. Existing line is a 2” poly line. New water line will be a 2” HDPE blue Poly and connect to existing. One stop and waste to be installed within 5ft of new and existing line connection.
Sewer – The new sewer line will be connected to the existing sewer line at the bunkhouse. Main line will be 6” with trailer connections being 6” to 3” Wye’s. Drainage must remain between 1/8” – ¼” per ft across the entirety of the line. Must meet state code.
Electrical – A transformer and drop-down meter will need to be coordinated and installed with Empire Electric and conduit and wiring ran from meter to the trailer pads. Contractor will be responsible for determining sizing of conduit and wiring. Must meet state code.
Option Items –
Trenching and Backfilling – Trenching will need to be 36” deep to meet frost line requirements.
Crushed Aggregate – Grade G Road Base for the trailer pads and roadway
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- C04 WD San Juan County Utah 1240LT26Q0126.pdf62 KB, July 7, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 7, 2026
Combined synopsis and solicitation
Due August 10, 2026 at 7:00 PM EDT. SAM.gov, notice 951967d44bd44757925a825597357cf3
1 revision on SAM
- July 7, 2026: publish, combined synopsis and solicitation
Points of contact
- Derrick A Dodsonderrick.dodson@usda.gov