# Mesa Falls Boardwalk/Bench Replacement - A Request for Quote will be sent directly to at least (3) suppliers. Location is at Caribou-Targhee National Forest in Fremont County ID. POP will tentatively begin 06/01/2026 for materials.

Canonical: https://sealedbidder.com/opportunities/1240lt26q0005

- Solicitation number: 1240LT26Q0005
- Notice type: Presolicitation
- Status: Closed. Deadline was March 1, 2026 at 7:00 PM EST
- Department: Department of Agriculture
- Agency: Forest Service
- Contracting office: Usda-Fs, Csa Intermountain 8 (1240LT)
- NAICS: 236220 Commercial and Institutional Building Construction
- Product or service code: Y1PA Construction Of Recreation Facilities (Non-Building)
- Set-aside: Total small business set-aside
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 236220)
- Place of performance: Idaho
- First posted: January 12, 2026
- Last posted: January 12, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/9f0c83dc6861462f8f6f14a216776dc0/view

## Reading this notice

- Kind of notice: Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks.
- Who may compete: Total small business set-aside. Only small businesses may compete. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates.
- What comes next: No solicitation was published under this number after the presolicitation of January 12, 2026. An agency sometimes issues the solicitation under a new number.

## Description

This project includes the removal and replacement of boardwalk lumber as well as connecting hardware for the Mesa Falls boardwalk.

The work includes removing and disposing of old pressure-treated lumber. Replacing all lumber with comparable stringers, deck boards, and other lumber as well as connecting hardware. Existing metal railings, posts, anchors, and other supports will remain in-place to be re-used. Redwood Bench lumber and connecting hardware will also be replaced for the 10 benches along the boardwalk and asphalt pathways.This project includes the removal and replacement of boardwalk lumber as well as connecting hardware for the Mesa Falls boardwalk.

This project includes the removal and replacement of boardwalk lumber as well as connecting hardware for the Mesa Falls boardwalk.  Onsite work tentatively begins 6/1/2026.  Contract time is 165 days.

## Open now in the same industry

193 open in NAICS 236220.

- CON NRM 531-25-102 | Expand Emergency Room (36C26027R0002-0007), due December 1, 2026 at 4:00 PM EST. https://sealedbidder.com/opportunities/36c26027r00020007
- 614-326 Construct Parking Garage West Lot Addition Minor Construction (36C77627B0003_1), due November 26, 2026 at 1:00 PM EST. https://sealedbidder.com/opportunities/36c77627b00031
- Y1DA | 521-24-102 | Renovate Wards 2K and 2B for Optometry/Ophthalmology Clinical Use (36C24726R0134), due November 26, 2026 at 1:00 PM EST. https://sealedbidder.com/opportunities/36c24726r0134

## Publications

- January 12, 2026: Presolicitation, due March 1, 2026 at 7:00 PM EST. Notice 9f0c83dc6861462f8f6f14a216776dc0. https://sam.gov/workspace/contract/opp/9f0c83dc6861462f8f6f14a216776dc0/view

## Points of contact

- Terri Tucker, terri.tucker@usda.gov

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/1240lt26q0005.
