# Culvert Replacement Meadow Creek

Canonical: https://sealedbidder.com/opportunities/1240lt25q0054

- Solicitation number: 1240LT25Q0054
- Notice type: Solicitation
- Status: Closed. Deadline was October 30, 2025 at 3:00 PM EDT
- Department: Department of Agriculture
- Agency: Forest Service
- Contracting office: Usda-Fs, Csa Intermountain 8 (1240LT)
- NAICS: 237310 Highway, Street, and Bridge Construction
- Product or service code: Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
- Set-aside: Total small business set-aside
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 237310)
- Place of performance: Dolores, Colorado
- County: Montezuma County (FIPS 08083). https://sealedbidder.com/counties/montezuma-county-co-08083
- City: Dolores. https://sealedbidder.com/cities/dolores-co-0820770
- First posted: September 23, 2025
- Last posted: October 2, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/e87ca81b7c364b51a87465d1fb62eacf/view

## Reading this notice

- Kind of notice: Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline.
- Who may compete: Total small business set-aside. Only small businesses may compete. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders had 37 days from the day the solicitation was posted, September 23, 2025, to the deadline. The deadline moved once: it was first October 20, 2025 and ended as October 30, 2025.

## Description

10-2-2025 - UPDATE - Site Visit is hereby CANCELED  A new date will be esatblished once the Government Shutdown concludes.

The culvert at Meadow Creek has failed and is need of replacement. This is in a live stream (meadow creek) and the water is creating a void under the road as it erodes causing the road to settle and create a hazardous situation. The 72&rdquo; diameter pipe is located on the West Dolores Road (NFSR 535) at milepost 24.72 just past burro bridge. The objective is to replace the pipe with a steel polycoated culvert that will resist rusting from the mineral content in the stream. A bypass road will be constructed to allow continued traffic throughout the duration of the project which is anticipated to last two weeks. Rip-rap will be collected on-site and commercially purchased &frac34;&rdquo;-minus road base will be used for surfacing.  See attached SOW, Specs, and Drawings for full project Requirements

## Attachments

- [1240LT25Q0054_Final.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/59da9638cafe4aa58508442a790d99d9/download)

## Open now in the same industry

36 open in NAICS 237310.

- GAOA Brainard Lake Recreation Area Deferred Maintenance (1240LT27Q0004), due December 17, 2026 at 5:00 PM EST. https://sealedbidder.com/opportunities/1240lt27q0004
- Administrative Parking Lot Repairs (1240LT27Q0019), due December 18, 2026 at 2:00 PM EST. https://sealedbidder.com/opportunities/1240lt27q0019
- AL-WHEELER NWR-WATERMAN GATE (140FF027Q0077), due November 27, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/140ff027q0077

## Publications

- September 23, 2025: Solicitation, due October 20, 2025 at 3:00 PM EDT. Notice 7c1f36063b244bd9b74e81d70481a5a7. https://sam.gov/workspace/contract/opp/7c1f36063b244bd9b74e81d70481a5a7/view
- October 2, 2025: Solicitation, due October 30, 2025 at 3:00 PM EDT. Notice e87ca81b7c364b51a87465d1fb62eacf. https://sam.gov/workspace/contract/opp/e87ca81b7c364b51a87465d1fb62eacf/view

## Points of contact

- Lucas Dahlman, lucas.dahlman@usda.gov

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/1240lt25q0054.
