Presolicitation, total small business set-aside
Bridge Removal
1240BJ24Q0007
Forest Service, Colville National Forest. Other Heavy and Civil Engineering Construction.
Response deadline
February 28, 2024 at 8:00 PM EST
Closed 1001 days ago. Posted February 9, 2024. Scheduled to archive March 14, 2024.
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one closed in 2024
143 like it are open now in other heavy and civil engineering construction
- Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract
Department of the Navy, Navfacsyscom Northwest
SolicitationNAICS 237990Bremerton, WAN4425526R0005Due in 5 daysDec 1 - Mill Creek Section 205 Flood Risk Management Improvements
Department of the Army, US Army Engineer District Walla Wal
Sources soughtNAICS 237990WashingtonW912EF-27-R-SS02Closes in 11 daysDec 7 - NAVIGATION LOCK TAINTER VALVE (TV) REPAIR, TV1
Department of the Army, W071 Endist Portland
SolicitationNAICS 237990WashingtonW9127N27BA010Closes in 13 daysDec 9
All 143 open in other heavy and civil engineering construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 237990 (other heavy and civil engineering construction), means no more than $45 million in average annual receipts, counted with affiliates. Open Small business opportunities
- What comes next
- No solicitation was published under this number after the presolicitation of February 9, 2024. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
THIS IS AN INFORMATIONAL NOTICE ONLY AND NOT A REQUEST FOR QUOTES. The scope is to remove the temporary Flume Creek Bridge including all of its components and ecology block abutments from its current location, milepost 0.03 on the 6200351 Forest Service road, and transport it to the Thomas Mountain pit, located off of the 7005530 Forest Service road, for storage. Once the bridge has been removed, both approach fills, and stream banks will be re-contoured to natural ground levels.
The road prism will be de-compacted for 100 feet from center of bridge in both directions. All disturbed areas will be seeded with government supplied grass seed. All in-stream work related to this project is restricted between August 1st, 2024 and August 31st, 2024. Existing bridge location is Newport-Sullivan Lake Ranger District, Pend Oreille County, WA. Work in and around stream courses shall meet the requirements of the Memorandum of Understanding between the Forest Service and the WA State Dept. of Fish and Wildlife.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 9, 2024
Presolicitation
Due February 28, 2024 at 8:00 PM EST. SAM.gov, notice 20fc24eda25046f0964b23d4b5c3372d
Points of contact
- Andrea Murphyandrea.murphy@usda.gov