{"canonical":"https://sealedbidder.com/opportunities/1240bh26r0013","key":"1240BH26R0013","url":"https://sealedbidder.com/opportunities/1240bh26r0013","title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","solicitation_number":"1240BH26R0013","notice_type":"k","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-10-29T21:00:00Z","first_posted":"2026-08-04","last_posted":"2026-10-26","department":"AGRICULTURE, DEPARTMENT OF","subagency":"FOREST SERVICE","office":"USDA FOREST SERVICE","naics":"238990","psc":"Z2PZ","set_aside":"SBA","place_state":"AR","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"05137","place_county_name":"Stone County","place_city":"0523680","place_city_name":"Fifty-Six","winner":null,"award_amount":null,"publications":[{"notice_id":"6b321d70f12e4cefb0a3fa8f825b2608","title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","solicitation_number":"1240BH26R0013","notice_type":"k","base_type":"k","posted":"2026-08-04","posted_at":"2026-08-04T18:42:56.664Z","due_at":"2026-09-30T21:00:00Z","due_date":"2026-09-30","cancelled":false,"archived":true,"archive_date":"2026-10-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/6b321d70f12e4cefb0a3fa8f825b2608/view","enriched":true,"history":[{"index":3,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-17T16:19:34.874Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"f1be61ee46c841319b7de58af19ea744","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":2,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-12T15:14:24.670Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"42d2afa84427481497083f2202798590","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":1,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-04T18:42:56.664Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608","solicitation_number":"1240BH26R0013"}]},{"notice_id":"42d2afa84427481497083f2202798590","title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","solicitation_number":"1240BH26R0013","notice_type":"k","base_type":"k","posted":"2026-08-12","posted_at":"2026-08-12T15:14:24.670Z","due_at":"2026-09-30T21:00:00Z","due_date":"2026-09-30","cancelled":false,"archived":true,"archive_date":"2026-10-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/42d2afa84427481497083f2202798590/view","enriched":true,"history":[{"index":3,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-17T16:19:34.874Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"f1be61ee46c841319b7de58af19ea744","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":2,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-12T15:14:24.670Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"42d2afa84427481497083f2202798590","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":1,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-04T18:42:56.664Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608","solicitation_number":"1240BH26R0013"}]},{"notice_id":"f1be61ee46c841319b7de58af19ea744","title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","solicitation_number":"1240BH26R0013","notice_type":"k","base_type":"k","posted":"2026-09-17","posted_at":"2026-09-17T16:19:34.874Z","due_at":"2026-09-30T21:00:00Z","due_date":"2026-09-30","cancelled":false,"archived":true,"archive_date":"2026-10-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f1be61ee46c841319b7de58af19ea744/view","enriched":true,"history":[{"index":3,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-17T16:19:34.874Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"f1be61ee46c841319b7de58af19ea744","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":2,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-12T15:14:24.670Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"42d2afa84427481497083f2202798590","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":1,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-04T18:42:56.664Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608","solicitation_number":"1240BH26R0013"}]},{"notice_id":"127aae2650554548a323d140be3baf06","title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","solicitation_number":"1240BH26R0013","notice_type":"k","base_type":"k","posted":"2026-09-30","posted_at":"2026-09-30T16:36:59.460Z","due_at":"2026-10-14T21:00:00Z","due_date":"2026-10-14","cancelled":false,"archived":true,"archive_date":"2026-10-29","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/127aae2650554548a323d140be3baf06/view","enriched":true,"history":[{"index":4,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-30T16:36:59.460Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"127aae2650554548a323d140be3baf06","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":3,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-17T16:19:34.874Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"f1be61ee46c841319b7de58af19ea744","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":2,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-12T15:14:24.670Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"42d2afa84427481497083f2202798590","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":1,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-04T18:42:56.664Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608","solicitation_number":"1240BH26R0013"}]},{"notice_id":"afbcb2bf2e9f4110891caff1bfe1c823","title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","solicitation_number":"1240BH26R0013","notice_type":"k","base_type":"k","posted":"2026-10-13","posted_at":"2026-10-13T15:38:53.249Z","due_at":"2026-10-29T21:00:00Z","due_date":"2026-10-29","cancelled":false,"archived":true,"archive_date":"2026-11-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/afbcb2bf2e9f4110891caff1bfe1c823/view","enriched":true,"history":[{"index":5,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-13T15:38:53.249Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"afbcb2bf2e9f4110891caff1bfe1c823","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":4,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-30T16:36:59.460Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"127aae2650554548a323d140be3baf06","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":3,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-17T16:19:34.874Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"f1be61ee46c841319b7de58af19ea744","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":2,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-12T15:14:24.670Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"42d2afa84427481497083f2202798590","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":1,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-04T18:42:56.664Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608","solicitation_number":"1240BH26R0013"}]},{"notice_id":"d510479d192c4d23b496c1eeb23798e5","title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","solicitation_number":"1240BH26R0013","notice_type":"k","base_type":"k","posted":"2026-10-26","posted_at":"2026-10-26T17:12:56.117Z","due_at":"2026-10-29T21:00:00Z","due_date":"2026-10-29","cancelled":false,"archived":true,"archive_date":"2026-11-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d510479d192c4d23b496c1eeb23798e5/view","enriched":true,"history":[{"index":6,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-26T17:12:56.117Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"d510479d192c4d23b496c1eeb23798e5","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":5,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-13T15:38:53.249Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"afbcb2bf2e9f4110891caff1bfe1c823","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":4,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-30T16:36:59.460Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"127aae2650554548a323d140be3baf06","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":3,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-17T16:19:34.874Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"f1be61ee46c841319b7de58af19ea744","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":2,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-12T15:14:24.670Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"42d2afa84427481497083f2202798590","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":1,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-04T18:42:56.664Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608","solicitation_number":"1240BH26R0013"}]}],"latest_notice_id":"d510479d192c4d23b496c1eeb23798e5","first_type":"k","notices":[{"dates":{"posted":"2026-08-04","posted_at":"2026-08-04T18:42:56.664Z","created_at":"2026-08-04T18:22:41.761Z","modified_at":"2026-08-12T15:14:24.670Z","response_deadline":{"raw":"2026-09-30T15:00:00-06:00","utc":"2026-09-30T21:00:00Z","date":"2026-09-30","time":"15:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/6b321d70f12e4cefb0a3fa8f825b2608/view"},"naics":{"codes":["238990"],"primary":"238990"},"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","agency":{"office":{"code":"123187","name":"USDA FOREST SERVICE"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"20250","city":"WASHINGTON","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":false,"publication":"published","archive_date":"2026-10-15","archive_type":"auto15"},"history":[{"index":3,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-17T16:19:34.874Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"f1be61ee46c841319b7de58af19ea744","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":2,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-12T15:14:24.670Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"42d2afa84427481497083f2202798590","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":1,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-04T18:42:56.664Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608","solicitation_number":"1240BH26R0013"}],"contacts":[{"name":"James Edington","role":"primary","email":"james.edington@usda.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"6b321d70f12e4cefb0a3fa8f825b2608","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"6b321d70f12e4cefb0a3fa8f825b2608","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-19T03:42:46.496659405Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"be5b55b19b729af7bdd453e30d78434d-26\"","fetched_at":"2026-10-06T03:48:34.605332942Z","row_sha256":"f6ca7675a6b5ec008d30e7fac8769c6c1c8c510e8b2765efc13d33f998992e99","last_modified":"2026-10-06T03:30:43Z"},"updated_at":"2026-10-06T03:48:34.605332942Z","first_seen_at":"2026-09-16T00:55:28.845070Z"},"description":{"html":"<p>This project includes all labor, equipment, supplies, testing &amp; inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades.&nbsp; All work shall conform to the attached Drawings and Specifications.&nbsp; All work shall be performed by qualified and licensed contractors for all trades applicable.&nbsp; Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation &amp; monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.&nbsp;</p>","text":"This project includes all labor, equipment, supplies, testing & inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. All work shall conform to the attached Drawings and Specifications. All work shall be performed by qualified and licensed contractors for all trades applicable. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"1240BH26R0013","place_of_performance":{"zip":"72533","city":{"name":"Fifty Six"},"state":{"code":"AR"},"country":{"code":"USA"}},"product_service_code":"Z2PZ"},{"dates":{"posted":"2026-08-12","posted_at":"2026-08-12T15:14:24.670Z","created_at":"2026-08-12T15:04:47.376Z","modified_at":"2026-09-17T16:19:34.874Z","response_deadline":{"raw":"2026-09-30T15:00:00-06:00","utc":"2026-09-30T21:00:00Z","date":"2026-09-30","time":"15:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/42d2afa84427481497083f2202798590/view"},"naics":{"codes":["238990"],"primary":"238990"},"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","agency":{"office":{"code":"123187","name":"USDA FOREST SERVICE"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"20250","city":"WASHINGTON","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":false,"publication":"published","archive_date":"2026-10-15","archive_type":"auto15"},"history":[{"index":3,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-17T16:19:34.874Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"f1be61ee46c841319b7de58af19ea744","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":2,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-12T15:14:24.670Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"42d2afa84427481497083f2202798590","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":1,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-04T18:42:56.664Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608","solicitation_number":"1240BH26R0013"}],"contacts":[{"name":"James Edington","role":"primary","email":"james.edington@usda.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"42d2afa84427481497083f2202798590","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"6b321d70f12e4cefb0a3fa8f825b2608","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-18T03:51:42.552280464Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"d64e26d4ea3384f62f27749d50e2c6137aad8978c60d2e6f672a6a31b5a49976","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-09-16T00:55:28.845070Z"},"description":{"html":"<p>On August 12, 2026, amendment 0001 to&nbsp;solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:</p>\n\n<p>1. Post Golder Specifications labeled &ldquo;C04m Attachment 11 Golder 1240BH26R0013.&rdquo;</p>\n\n<p>This SF30 must be acknowledged and submitted with your proposal.</p>\n\n<p>***********************************************************************************************************************************************</p>\n\n<p>This project includes all labor, equipment, supplies, testing &amp; inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades.&nbsp; All work shall conform to the attached Drawings and Specifications.&nbsp; All work shall be performed by qualified and licensed contractors for all trades applicable.&nbsp; Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation &amp; monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.&nbsp;</p>","text":"On August 12, 2026, amendment 0001 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:\n\n1. Post Golder Specifications labeled “C04m Attachment 11 Golder 1240BH26R0013.”\n\nThis SF30 must be acknowledged and submitted with your proposal.\n\n***********************************************************************************************************************************************\n\nThis project includes all labor, equipment, supplies, testing & inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. All work shall conform to the attached Drawings and Specifications. All work shall be performed by qualified and licensed contractors for all trades applicable. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"1240BH26R0013","place_of_performance":{"zip":"72533","city":{"name":"Fifty Six"},"state":{"code":"AR"},"country":{"code":"USA"}},"product_service_code":"Z2PZ"},{"dates":{"posted":"2026-09-17","posted_at":"2026-09-17T16:19:34.874Z","created_at":"2026-09-17T16:14:27.575Z","modified_at":"2026-09-17T16:19:34.879Z","response_deadline":{"raw":"2026-09-30T15:00:00-06:00","utc":"2026-09-30T21:00:00Z","date":"2026-09-30","time":"15:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/f1be61ee46c841319b7de58af19ea744/view"},"naics":{"codes":["238990"],"primary":"238990"},"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","agency":{"office":{"code":"123187","name":"USDA FOREST SERVICE"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"20250","city":"WASHINGTON","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"publication":"published","archive_date":"2026-10-15","archive_type":"auto15"},"history":[{"index":3,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-17T16:19:34.874Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"f1be61ee46c841319b7de58af19ea744","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":2,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-12T15:14:24.670Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"42d2afa84427481497083f2202798590","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":1,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-04T18:42:56.664Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608","solicitation_number":"1240BH26R0013"}],"contacts":[{"name":"James Edington","role":"primary","email":"james.edington@usda.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"f1be61ee46c841319b7de58af19ea744","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"6b321d70f12e4cefb0a3fa8f825b2608","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-19T00:05:57.397428683Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"0177de4f89bf08dfeb95955b56bdf8f9abe2c8627cebbd7985622e126f4f5c47","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-09-18T03:58:46.954081762Z"},"description":{"html":"<p>On September 17, 2026, amendment 0002 to&nbsp;solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:</p>\n\n<p>1. Post RFI questions and answers labeled C05a RFI QA 1240BH26R0013.</p>\n\n<p>2. Post pre-bid sign in sheet labeled C05b Site Visit Sign In 1240BH26R0013.</p>\n\n<p>This amendment must be acknowledged and submitted with your proposal.</p>\n\n<p>***********************************************************************************************************************************************</p>\n\n<p>On August 12, 2026, amendment 0001 to&nbsp;solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:</p>\n\n<p>1. Post Golder Specifications labeled &ldquo;C04m Attachment 11 Golder 1240BH26R0013.&rdquo;</p>\n\n<p>This SF30 must be acknowledged and submitted with your proposal.</p>\n\n<p>***********************************************************************************************************************************************</p>\n\n<p>This project includes all labor, equipment, supplies, testing &amp; inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades.&nbsp; All work shall conform to the attached Drawings and Specifications.&nbsp; All work shall be performed by qualified and licensed contractors for all trades applicable.&nbsp; Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation &amp; monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.&nbsp;</p>","text":"On September 17, 2026, amendment 0002 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:\n\n1. Post RFI questions and answers labeled C05a RFI QA 1240BH26R0013.\n\n2. Post pre-bid sign in sheet labeled C05b Site Visit Sign In 1240BH26R0013.\n\nThis amendment must be acknowledged and submitted with your proposal.\n\n***********************************************************************************************************************************************\n\nOn August 12, 2026, amendment 0001 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:\n\n1. Post Golder Specifications labeled “C04m Attachment 11 Golder 1240BH26R0013.”\n\nThis SF30 must be acknowledged and submitted with your proposal.\n\n***********************************************************************************************************************************************\n\nThis project includes all labor, equipment, supplies, testing & inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. All work shall conform to the attached Drawings and Specifications. All work shall be performed by qualified and licensed contractors for all trades applicable. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"1240BH26R0013","place_of_performance":{"zip":"72533","city":{"name":"Fifty Six"},"state":{"code":"AR"},"country":{"code":"USA"}},"product_service_code":"Z2PZ"},{"dates":{"posted":"2026-09-30","posted_at":"2026-09-30T16:36:59.460Z","created_at":"2026-09-30T16:27:16.631Z","modified_at":"2026-09-30T16:36:59.464Z","response_deadline":{"raw":"2026-10-14T15:00:00-06:00","utc":"2026-10-14T21:00:00Z","date":"2026-10-14","time":"15:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/127aae2650554548a323d140be3baf06/view"},"naics":{"codes":["238990"],"primary":"238990"},"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","agency":{"office":{"code":"123187","name":"USDA FOREST SERVICE"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"20250","city":"WASHINGTON","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-10-29","archive_type":"auto15"},"history":[{"index":4,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-30T16:36:59.460Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"127aae2650554548a323d140be3baf06","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":3,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-17T16:19:34.874Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"f1be61ee46c841319b7de58af19ea744","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":2,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-12T15:14:24.670Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"42d2afa84427481497083f2202798590","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":1,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-04T18:42:56.664Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608","solicitation_number":"1240BH26R0013"}],"contacts":[{"name":"James Edington","role":"primary","email":"james.edington@usda.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"127aae2650554548a323d140be3baf06","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"6b321d70f12e4cefb0a3fa8f825b2608","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-02T00:06:08.837776069Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"b6f2a28a107325e2f06fe9c4a8eeb8262cd5023dfcffef7fc574363222670abe","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-10-01T03:59:34.239096903Z"},"description":{"html":"<p>On September 30, 2026, amendment 0003 to&nbsp;solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:</p>\n\n<p>1. Extends the proposal due date from 09/30/2026 to 10/14/2026.</p>\n\n<p>This amendment must be acknowledged and submitted with your quote.</p>\n\n<p>***************************************************************************************************************************************</p>\n\n<p>On September 17, 2026, amendment 0002 to&nbsp;solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:</p>\n\n<p>1. Post RFI questions and answers labeled C05a RFI QA 1240BH26R0013.</p>\n\n<p>2. Post pre-bid sign in sheet labeled C05b Site Visit Sign In 1240BH26R0013.</p>\n\n<p>This amendment must be acknowledged and submitted with your proposal.</p>\n\n<p>***********************************************************************************************************************************************</p>\n\n<p>On August 12, 2026, amendment 0001 to&nbsp;solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:</p>\n\n<p>1. Post Golder Specifications labeled &ldquo;C04m Attachment 11 Golder 1240BH26R0013.&rdquo;</p>\n\n<p>This SF30 must be acknowledged and submitted with your proposal.</p>\n\n<p>***********************************************************************************************************************************************</p>\n\n<p>This project includes all labor, equipment, supplies, testing &amp; inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades.&nbsp; All work shall conform to the attached Drawings and Specifications.&nbsp; All work shall be performed by qualified and licensed contractors for all trades applicable.&nbsp; Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation &amp; monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.&nbsp;</p>","text":"On September 30, 2026, amendment 0003 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:\n\n1. Extends the proposal due date from 09/30/2026 to 10/14/2026.\n\nThis amendment must be acknowledged and submitted with your quote.\n\n***************************************************************************************************************************************\n\nOn September 17, 2026, amendment 0002 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:\n\n1. Post RFI questions and answers labeled C05a RFI QA 1240BH26R0013.\n\n2. Post pre-bid sign in sheet labeled C05b Site Visit Sign In 1240BH26R0013.\n\nThis amendment must be acknowledged and submitted with your proposal.\n\n***********************************************************************************************************************************************\n\nOn August 12, 2026, amendment 0001 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:\n\n1. Post Golder Specifications labeled “C04m Attachment 11 Golder 1240BH26R0013.”\n\nThis SF30 must be acknowledged and submitted with your proposal.\n\n***********************************************************************************************************************************************\n\nThis project includes all labor, equipment, supplies, testing & inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. All work shall conform to the attached Drawings and Specifications. All work shall be performed by qualified and licensed contractors for all trades applicable. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"1240BH26R0013","place_of_performance":{"zip":"72533","city":{"name":"Fifty Six"},"state":{"code":"AR"},"country":{"code":"USA"}},"product_service_code":"Z2PZ"},{"dates":{"posted":"2026-10-13","posted_at":"2026-10-13T15:38:53.249Z","created_at":"2026-10-13T15:35:04.708Z","modified_at":"2026-10-13T15:38:53.256Z","response_deadline":{"raw":"2026-10-29T15:00:00-06:00","utc":"2026-10-29T21:00:00Z","date":"2026-10-29","time":"15:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/afbcb2bf2e9f4110891caff1bfe1c823/view"},"naics":{"codes":["238990"],"primary":"238990"},"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","agency":{"office":{"code":"123187","name":"USDA FOREST SERVICE"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"20250","city":"WASHINGTON","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-11-13","archive_type":"auto15"},"history":[{"index":5,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-13T15:38:53.249Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"afbcb2bf2e9f4110891caff1bfe1c823","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":4,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-30T16:36:59.460Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"127aae2650554548a323d140be3baf06","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":3,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-17T16:19:34.874Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"f1be61ee46c841319b7de58af19ea744","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":2,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-12T15:14:24.670Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"42d2afa84427481497083f2202798590","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":1,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-04T18:42:56.664Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608","solicitation_number":"1240BH26R0013"}],"contacts":[{"name":"James Edington","role":"primary","email":"james.edington@usda.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"afbcb2bf2e9f4110891caff1bfe1c823","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"6b321d70f12e4cefb0a3fa8f825b2608","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-14T04:35:59.359516421Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"0e39f072e564f638a579c203c447a7008c6bcd517729b091520917be94c138c2","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-10-14T03:54:05.500072632Z"},"description":{"html":"<p>On October 13, 2026, amendment 0004 to&nbsp;solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:</p>\n\n<p>1. Extends the proposal due date from 10/14/2026 to 10/29/2026.</p>\n\n<p>This amendment must be acknowledged and submitted with your proposal.</p>\n\n<p>***************************************************************************************************************************************</p>\n\n<p>On September 30, 2026, amendment 0003 to&nbsp;solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:</p>\n\n<p>1. Extends the proposal due date from 09/30/2026 to 10/14/2026.</p>\n\n<p>This amendment must be acknowledged and submitted with your proposal.</p>\n\n<p>***************************************************************************************************************************************</p>\n\n<p>On September 17, 2026, amendment 0002 to&nbsp;solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:</p>\n\n<p>1. Post RFI questions and answers labeled C05a RFI QA 1240BH26R0013.</p>\n\n<p>2. Post pre-bid sign in sheet labeled C05b Site Visit Sign In 1240BH26R0013.</p>\n\n<p>This amendment must be acknowledged and submitted with your proposal.</p>\n\n<p>***********************************************************************************************************************************************</p>\n\n<p>On August 12, 2026, amendment 0001 to&nbsp;solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:</p>\n\n<p>1. Post Golder Specifications labeled &ldquo;C04m Attachment 11 Golder 1240BH26R0013.&rdquo;</p>\n\n<p>This SF30 must be acknowledged and submitted with your proposal.</p>\n\n<p>***********************************************************************************************************************************************</p>\n\n<p>This project includes all labor, equipment, supplies, testing &amp; inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades.&nbsp; All work shall conform to the attached Drawings and Specifications.&nbsp; All work shall be performed by qualified and licensed contractors for all trades applicable.&nbsp; Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation &amp; monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.&nbsp;</p>","text":"On October 13, 2026, amendment 0004 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:\n\n1. Extends the proposal due date from 10/14/2026 to 10/29/2026.\n\nThis amendment must be acknowledged and submitted with your proposal.\n\n***************************************************************************************************************************************\n\nOn September 30, 2026, amendment 0003 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:\n\n1. Extends the proposal due date from 09/30/2026 to 10/14/2026.\n\nThis amendment must be acknowledged and submitted with your proposal.\n\n***************************************************************************************************************************************\n\nOn September 17, 2026, amendment 0002 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:\n\n1. Post RFI questions and answers labeled C05a RFI QA 1240BH26R0013.\n\n2. Post pre-bid sign in sheet labeled C05b Site Visit Sign In 1240BH26R0013.\n\nThis amendment must be acknowledged and submitted with your proposal.\n\n***********************************************************************************************************************************************\n\nOn August 12, 2026, amendment 0001 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:\n\n1. Post Golder Specifications labeled “C04m Attachment 11 Golder 1240BH26R0013.”\n\nThis SF30 must be acknowledged and submitted with your proposal.\n\n***********************************************************************************************************************************************\n\nThis project includes all labor, equipment, supplies, testing & inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. All work shall conform to the attached Drawings and Specifications. All work shall be performed by qualified and licensed contractors for all trades applicable. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"1240BH26R0013","place_of_performance":{"zip":"72533","city":{"code":"23680","name":"Fifty Six"},"state":{"code":"AR","name":"Arkansas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2PZ"},{"dates":{"posted":"2026-10-26","posted_at":"2026-10-26T17:12:56.117Z","created_at":"2026-10-26T17:03:17.600Z","modified_at":"2026-10-26T17:12:56.122Z","response_deadline":{"raw":"2026-10-29T15:00:00-06:00","utc":"2026-10-29T21:00:00Z","date":"2026-10-29","time":"15:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d510479d192c4d23b496c1eeb23798e5/view"},"naics":{"codes":["238990"],"primary":"238990"},"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","agency":{"office":{"code":"123187","name":"USDA FOREST SERVICE"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"20250","city":"WASHINGTON","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-11-13","archive_type":"auto15"},"history":[{"index":6,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-26T17:12:56.117Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"d510479d192c4d23b496c1eeb23798e5","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":5,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-13T15:38:53.249Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"afbcb2bf2e9f4110891caff1bfe1c823","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":4,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-30T16:36:59.460Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"127aae2650554548a323d140be3baf06","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":3,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-17T16:19:34.874Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"f1be61ee46c841319b7de58af19ea744","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":2,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-12T15:14:24.670Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"42d2afa84427481497083f2202798590","solicitation_number":"1240BH26R0013","parent_opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608"},{"index":1,"title":"GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-04T18:42:56.664Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"6b321d70f12e4cefb0a3fa8f825b2608","solicitation_number":"1240BH26R0013"}],"contacts":[{"name":"James Edington","role":"primary","email":"james.edington@usda.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"d510479d192c4d23b496c1eeb23798e5","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"6b321d70f12e4cefb0a3fa8f825b2608","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-27T04:16:23.569834529Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"474a115973442e01e5a5daab604bac197bbf4efea81b373ec215089e18702823","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-10-27T03:48:28.255692825Z"},"description":{"html":"<p>On October 26, 2026, amendment 0004 to&nbsp;solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:</p>\n\n<p>1. Post the final RFI Q&amp;A.</p>\n\n<p>This amendment must be acknowledged and submitted with your proposal.</p>\n\n<p>**************************************************************************************************************************************</p>\n\n<p>On October 13, 2026, amendment 0004 to&nbsp;solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:</p>\n\n<p>1. Extends the proposal due date from 10/14/2026 to 10/29/2026.</p>\n\n<p>This amendment must be acknowledged and submitted with your proposal.</p>\n\n<p>***************************************************************************************************************************************</p>\n\n<p>On September 30, 2026, amendment 0003 to&nbsp;solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:</p>\n\n<p>1. Extends the proposal due date from 09/30/2026 to 10/14/2026.</p>\n\n<p>This amendment must be acknowledged and submitted with your proposal.</p>\n\n<p>***************************************************************************************************************************************</p>\n\n<p>On September 17, 2026, amendment 0002 to&nbsp;solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:</p>\n\n<p>1. Post RFI questions and answers labeled C05a RFI QA 1240BH26R0013.</p>\n\n<p>2. Post pre-bid sign in sheet labeled C05b Site Visit Sign In 1240BH26R0013.</p>\n\n<p>This amendment must be acknowledged and submitted with your proposal.</p>\n\n<p>***********************************************************************************************************************************************</p>\n\n<p>On August 12, 2026, amendment 0001 to&nbsp;solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:</p>\n\n<p>1. Post Golder Specifications labeled &ldquo;C04m Attachment 11 Golder 1240BH26R0013.&rdquo;</p>\n\n<p>This SF30 must be acknowledged and submitted with your proposal.</p>\n\n<p>***********************************************************************************************************************************************</p>\n\n<p>This project includes all labor, equipment, supplies, testing &amp; inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades.&nbsp; All work shall conform to the attached Drawings and Specifications.&nbsp; All work shall be performed by qualified and licensed contractors for all trades applicable.&nbsp; Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation &amp; monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.&nbsp;</p>","text":"On October 26, 2026, amendment 0004 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:\n\n1. Post the final RFI Q&A.\n\nThis amendment must be acknowledged and submitted with your proposal.\n\n**************************************************************************************************************************************\n\nOn October 13, 2026, amendment 0004 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:\n\n1. Extends the proposal due date from 10/14/2026 to 10/29/2026.\n\nThis amendment must be acknowledged and submitted with your proposal.\n\n***************************************************************************************************************************************\n\nOn September 30, 2026, amendment 0003 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:\n\n1. Extends the proposal due date from 09/30/2026 to 10/14/2026.\n\nThis amendment must be acknowledged and submitted with your proposal.\n\n***************************************************************************************************************************************\n\nOn September 17, 2026, amendment 0002 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:\n\n1. Post RFI questions and answers labeled C05a RFI QA 1240BH26R0013.\n\n2. Post pre-bid sign in sheet labeled C05b Site Visit Sign In 1240BH26R0013.\n\nThis amendment must be acknowledged and submitted with your proposal.\n\n***********************************************************************************************************************************************\n\nOn August 12, 2026, amendment 0001 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:\n\n1. Post Golder Specifications labeled “C04m Attachment 11 Golder 1240BH26R0013.”\n\nThis SF30 must be acknowledged and submitted with your proposal.\n\n***********************************************************************************************************************************************\n\nThis project includes all labor, equipment, supplies, testing & inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. All work shall conform to the attached Drawings and Specifications. All work shall be performed by qualified and licensed contractors for all trades applicable. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"1240BH26R0013","place_of_performance":{"zip":"72533","city":{"code":"23680","name":"Fifty Six"},"state":{"code":"AR","name":"Arkansas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2PZ"}],"due_at":"2026-10-29T21:00:00Z","due_date":"2026-10-29","closes_at":"2026-10-29T21:00:00Z","awardable":true,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-123187","office_name":"USDA FOREST SERVICE","state":"AR","county":"05137","county_name":"Stone County","city":"0523680","city_name":"Fifty-Six","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-14T06:16:27.934853Z","principal_notice_id":"d510479d192c4d23b496c1eeb23798e5","description":{"text":"On October 26, 2026, amendment 0004 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:\n\n1. Post the final RFI Q&A.\n\nThis amendment must be acknowledged and submitted with your proposal.\n\n**************************************************************************************************************************************\n\nOn October 13, 2026, amendment 0004 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:\n\n1. Extends the proposal due date from 10/14/2026 to 10/29/2026.\n\nThis amendment must be acknowledged and submitted with your proposal.\n\n***************************************************************************************************************************************\n\nOn September 30, 2026, amendment 0003 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:\n\n1. Extends the proposal due date from 09/30/2026 to 10/14/2026.\n\nThis amendment must be acknowledged and submitted with your proposal.\n\n***************************************************************************************************************************************\n\nOn September 17, 2026, amendment 0002 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:\n\n1. Post RFI questions and answers labeled C05a RFI QA 1240BH26R0013.\n\n2. Post pre-bid sign in sheet labeled C05b Site Visit Sign In 1240BH26R0013.\n\nThis amendment must be acknowledged and submitted with your proposal.\n\n***********************************************************************************************************************************************\n\nOn August 12, 2026, amendment 0001 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:\n\n1. Post Golder Specifications labeled “C04m Attachment 11 Golder 1240BH26R0013.”\n\nThis SF30 must be acknowledged and submitted with your proposal.\n\n***********************************************************************************************************************************************\n\nThis project includes all labor, equipment, supplies, testing & inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. All work shall conform to the attached Drawings and Specifications. All work shall be performed by qualified and licensed contractors for all trades applicable. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.","html":"<p>On October 26, 2026, amendment 0004 to&nbsp;solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:</p>\n\n<p>1. Post the final RFI Q&amp;A.</p>\n\n<p>This amendment must be acknowledged and submitted with your proposal.</p>\n\n<p>**************************************************************************************************************************************</p>\n\n<p>On October 13, 2026, amendment 0004 to&nbsp;solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:</p>\n\n<p>1. Extends the proposal due date from 10/14/2026 to 10/29/2026.</p>\n\n<p>This amendment must be acknowledged and submitted with your proposal.</p>\n\n<p>***************************************************************************************************************************************</p>\n\n<p>On September 30, 2026, amendment 0003 to&nbsp;solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:</p>\n\n<p>1. Extends the proposal due date from 09/30/2026 to 10/14/2026.</p>\n\n<p>This amendment must be acknowledged and submitted with your proposal.</p>\n\n<p>***************************************************************************************************************************************</p>\n\n<p>On September 17, 2026, amendment 0002 to&nbsp;solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:</p>\n\n<p>1. Post RFI questions and answers labeled C05a RFI QA 1240BH26R0013.</p>\n\n<p>2. Post pre-bid sign in sheet labeled C05b Site Visit Sign In 1240BH26R0013.</p>\n\n<p>This amendment must be acknowledged and submitted with your proposal.</p>\n\n<p>***********************************************************************************************************************************************</p>\n\n<p>On August 12, 2026, amendment 0001 to&nbsp;solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:</p>\n\n<p>1. Post Golder Specifications labeled &ldquo;C04m Attachment 11 Golder 1240BH26R0013.&rdquo;</p>\n\n<p>This SF30 must be acknowledged and submitted with your proposal.</p>\n\n<p>***********************************************************************************************************************************************</p>\n\n<p>This project includes all labor, equipment, supplies, testing &amp; inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades.&nbsp; All work shall conform to the attached Drawings and Specifications.&nbsp; All work shall be performed by qualified and licensed contractors for all trades applicable.&nbsp; Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation &amp; monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.&nbsp;</p>","origin":"detail"},"contacts":[{"name":"James Edington","role":"primary","email":"james.edington@usda.gov"}],"place_of_performance":{"zip":"72533","city":{"code":"23680","name":"Fifty Six"},"state":{"code":"AR","name":"Arkansas"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"20250","city":"WASHINGTON","state":"DC","country":"USA"},"naics_codes":["238990"],"award":null,"attachments":[{"resource_id":"7418440fd80a47d69c8586abb6f16c5c","name":"C04f Attachment 6 SOI 1240BH26R0013.xlsx","kind":"file","mime_type":".xlsx","size_bytes":13608,"posted_at":"2026-08-04T18:42:56.664Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7418440fd80a47d69c8586abb6f16c5c/download","mirrored":false}],"awards":[],"related":[{"key":"1240LT27Q0003","latest_notice_id":"8f71be73d0734020af2f746301c590cb","title":"GAOA Mesa Falls VC Roof Repairs in Caribou-Targhee National Forest, Idaho","solicitation_number":"1240LT27Q0003","notice_type":"k","first_type":"k","first_posted":"2026-10-07","last_posted":"2026-11-25","notices":2,"due_at":"2026-12-04T22:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-04T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-123187","office_name":"USDA FOREST SERVICE","naics":"238160","psc":"Z2AZ","set_aside":"SBA","state":"ID","county":"16019","county_name":"Bonneville County","city":"1639700","city_name":"Idaho Falls","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Caribou-Targhee National Forest","site_key":"caribou-targhee-national-forest-id","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-26T04:43:42.403930Z"},{"key":"12318727Q0019","latest_notice_id":"27a0490c74f04d4188d7c496dd07f9ef","title":"Logan Ranger District Enclosed Snowmobile Trailer","solicitation_number":"12318727Q0019","notice_type":"k","first_type":"k","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-12-04T22:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-04T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-123187","office_name":"USDA FOREST SERVICE","naics":"336212","psc":"2330","set_aside":"SBA","state":"UT","county":"49035","county_name":"Salt Lake County","city":"4967000","city_name":"Salt Lake City","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"1240BH27Q0001","latest_notice_id":"6a44e357e41d48c993205e9523aa3de8","title":"GAOA Star Meadows MEP Repairs Utility Installations Flathead NF","solicitation_number":"1240BH27Q0001","notice_type":"k","first_type":"k","first_posted":"2026-10-01","last_posted":"2026-11-17","notices":2,"due_at":"2026-12-08T22:00:00Z","due_date":"2026-12-08","closes_at":"2026-12-08T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-123187","office_name":"USDA FOREST SERVICE","naics":"238220","psc":"Z2FB","set_aside":"SBA","state":"MT","county":"30029","county_name":"Flathead County","city":"3079825","city_name":"Whitefish","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"1240LT27Q0004","latest_notice_id":"b6cd2f6e173941a7b4e6b22948e1d29a","title":"GAOA Brainard Lake Recreation Area Deferred Maintenance","solicitation_number":"1240LT27Q0004","notice_type":"k","first_type":"k","first_posted":"2026-10-27","last_posted":"2026-10-28","notices":3,"due_at":"2026-12-17T22:00:00Z","due_date":"2026-12-17","closes_at":"2026-12-17T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-123187","office_name":"USDA FOREST SERVICE","naics":"237310","psc":"Z1PA","set_aside":"SBA","state":"CO","county":"08013","county_name":"Boulder County","city":"0882735","city_name":"Ward","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"}],"similar_open":[{"key":"2027TYNDALLGATR15","latest_notice_id":"12fcfc711496424997c41223aecc8bff","title":"Sources sought GATR grounding","solicitation_number":"2027TYNDALLGATR15","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-11-27T20:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA4819","office_name":"FA4819 325 CONS PKP","naics":"238990","psc":"Y1BG","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"N4008527NORFPGREATLAKESROICC5395","latest_notice_id":"2e3f6b5013164071b01ff8e72cc9ebcf","title":"Investigation, Repairs, and Removal and Disposal of Marine Attachments to Raw Water Intake","solicitation_number":"N40085-27-NORFP-GREAT-LAKES-ROICC-5395","notice_type":"r","first_type":"r","first_posted":"2026-11-04","last_posted":"2026-11-04","notices":1,"due_at":"2026-11-30T19:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N40085","office_name":"NAVFACSYSCOM MID-ATLANTIC","naics":"238990","psc":"Z2NZ","set_aside":null,"state":"IL","county":"17097","county_name":"Lake County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-05T04:36:35.392694Z"},{"key":"SP470327Q0004","latest_notice_id":"17d74d55f88145b98e25a59e35a337a2","title":"Door Repair IDPO; Defense Supply Center Richmond(DSCR)","solicitation_number":"SP470327Q0004","notice_type":"p","first_type":"p","first_posted":"2026-11-05","last_posted":"2026-11-16","notices":3,"due_at":"2026-12-03T22:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SP4703","office_name":"DCSO RICHMOND DIVISION #1","naics":"238990","psc":"Z1PZ","set_aside":"SBA","state":"VA","county":"51041","county_name":"Chesterfield County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"}],"similar_open_total":20,"indexable":false}