{"canonical":"https://sealedbidder.com/opportunities/12405b25r0009","key":"12405B25R0009","url":"https://sealedbidder.com/opportunities/12405b25r0009","title":"Replacement of Roofing and Siding; and Paint Building 42","solicitation_number":"12405B25R0009","notice_type":"a","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-02-21T22:00:00Z","first_posted":"2024-12-18","last_posted":"2025-03-20","department":"AGRICULTURE, DEPARTMENT OF","subagency":"AGRICULTURAL RESEARCH SERVICE","office":"USDA ARS SEA AAO ACQ/PER PROP","naics":"238160","psc":"Z1DB","set_aside":"SBA","place_state":"MS","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"28105","place_county_name":"Oktibbeha County","place_city":"2870240","place_city_name":"Starkville","winner":"SIEVERDING CONSTRUCTION, INC.","award_amount":"94425.00","publications":[{"notice_id":"13db359e57fc4ab2a8c94cc72cb31f34","title":"Replacement of Roofing and Siding; and Paint Building 42","solicitation_number":"12405B25R0009","notice_type":"k","base_type":"k","posted":"2024-12-18","posted_at":null,"due_at":"2025-01-17T22:00:00Z","due_date":"2025-01-17","cancelled":null,"archived":null,"archive_date":"2025-02-01","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/13db359e57fc4ab2a8c94cc72cb31f34/view","enriched":false,"history":[]},{"notice_id":"4b8eb2ef06db4e2d9f02239dd5cffcb1","title":"Replacement of Roofing and Siding; and Paint Building 42","solicitation_number":"12405B25R0009","notice_type":"k","base_type":"k","posted":"2024-12-27","posted_at":null,"due_at":"2025-01-17T22:00:00Z","due_date":"2025-01-17","cancelled":null,"archived":null,"archive_date":"2025-02-01","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/4b8eb2ef06db4e2d9f02239dd5cffcb1/view","enriched":false,"history":[]},{"notice_id":"cabf55bc55084213819664d5e1fb90ee","title":"Replacement of Roofing and Siding; and Paint Building 42","solicitation_number":"12405B25R0009","notice_type":"k","base_type":"k","posted":"2025-01-02","posted_at":null,"due_at":"2025-01-17T22:00:00Z","due_date":"2025-01-17","cancelled":null,"archived":null,"archive_date":"2025-02-01","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/cabf55bc55084213819664d5e1fb90ee/view","enriched":false,"history":[]},{"notice_id":"aac8ed7cebd546f38662bcd41167e22e","title":"Replacement of Roofing and Siding; and Paint Building 42","solicitation_number":"12405B25R0009","notice_type":"k","base_type":"k","posted":"2025-01-13","posted_at":"2025-01-13T20:44:53.491Z","due_at":"2025-01-17T22:00:00Z","due_date":"2025-01-17","cancelled":false,"archived":true,"archive_date":"2025-02-01","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/aac8ed7cebd546f38662bcd41167e22e/view","enriched":true,"history":[{"index":10,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T13:15:09.914Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"f8a3d8829fe44ae2939463cc74e3084b","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":8,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T13:13:50.482Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"64da250cf0c84f169baf4c2252ed6d26","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":7,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2025-01-30T20:01:46.731Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"01b24eb430be4b8ea160b55f566cc671","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":6,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-16T19:15:05.924Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"d7d242435eb54957a4e970d5c261a0a2","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":5,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T20:44:53.491Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"aac8ed7cebd546f38662bcd41167e22e","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":4,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T19:51:49.853Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"bc68fb8c04584744898adcdda9fbb3ff","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":3,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-02T16:41:26.241Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"cabf55bc55084213819664d5e1fb90ee","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":2,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-27T14:32:52.704Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"4b8eb2ef06db4e2d9f02239dd5cffcb1","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":1,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-18T14:21:24.311Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34","solicitation_number":"12405B25R0009"}]},{"notice_id":"bc68fb8c04584744898adcdda9fbb3ff","title":"Replacement of Roofing and Siding; and Paint Building 42","solicitation_number":"12405B25R0009","notice_type":"k","base_type":"k","posted":"2025-01-13","posted_at":"2025-01-13T19:51:49.853Z","due_at":"2025-01-17T22:00:00Z","due_date":"2025-01-17","cancelled":false,"archived":true,"archive_date":"2025-02-01","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/bc68fb8c04584744898adcdda9fbb3ff/view","enriched":true,"history":[{"index":10,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T13:15:09.914Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"f8a3d8829fe44ae2939463cc74e3084b","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":8,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T13:13:50.482Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"64da250cf0c84f169baf4c2252ed6d26","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":7,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2025-01-30T20:01:46.731Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"01b24eb430be4b8ea160b55f566cc671","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":6,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-16T19:15:05.924Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"d7d242435eb54957a4e970d5c261a0a2","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":5,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T20:44:53.491Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"aac8ed7cebd546f38662bcd41167e22e","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":4,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T19:51:49.853Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"bc68fb8c04584744898adcdda9fbb3ff","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":3,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-02T16:41:26.241Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"cabf55bc55084213819664d5e1fb90ee","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":2,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-27T14:32:52.704Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"4b8eb2ef06db4e2d9f02239dd5cffcb1","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":1,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-18T14:21:24.311Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34","solicitation_number":"12405B25R0009"}]},{"notice_id":"d7d242435eb54957a4e970d5c261a0a2","title":"Replacement of Roofing and Siding; and Paint Building 42","solicitation_number":"12405B25R0009","notice_type":"k","base_type":"k","posted":"2025-01-16","posted_at":"2025-01-16T19:15:05.924Z","due_at":"2025-01-31T22:00:00Z","due_date":"2025-01-31","cancelled":false,"archived":true,"archive_date":"2025-02-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d7d242435eb54957a4e970d5c261a0a2/view","enriched":true,"history":[{"index":10,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T13:15:09.914Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"f8a3d8829fe44ae2939463cc74e3084b","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":8,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T13:13:50.482Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"64da250cf0c84f169baf4c2252ed6d26","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":7,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2025-01-30T20:01:46.731Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"01b24eb430be4b8ea160b55f566cc671","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":6,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-16T19:15:05.924Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"d7d242435eb54957a4e970d5c261a0a2","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":5,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T20:44:53.491Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"aac8ed7cebd546f38662bcd41167e22e","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":4,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T19:51:49.853Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"bc68fb8c04584744898adcdda9fbb3ff","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":3,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-02T16:41:26.241Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"cabf55bc55084213819664d5e1fb90ee","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":2,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-27T14:32:52.704Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"4b8eb2ef06db4e2d9f02239dd5cffcb1","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":1,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-18T14:21:24.311Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34","solicitation_number":"12405B25R0009"}]},{"notice_id":"64da250cf0c84f169baf4c2252ed6d26","title":"Replacement of Roofing and Siding; and Paint Building 42","solicitation_number":"12405B25R0009","notice_type":"k","base_type":"k","posted":"2025-02-11","posted_at":"2025-02-11T13:13:50.482Z","due_at":"2025-02-21T22:00:00Z","due_date":"2025-02-21","cancelled":false,"archived":true,"archive_date":"2025-03-08","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/64da250cf0c84f169baf4c2252ed6d26/view","enriched":true,"history":[{"index":10,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T13:15:09.914Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"f8a3d8829fe44ae2939463cc74e3084b","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":8,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T13:13:50.482Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"64da250cf0c84f169baf4c2252ed6d26","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":7,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2025-01-30T20:01:46.731Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"01b24eb430be4b8ea160b55f566cc671","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":6,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-16T19:15:05.924Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"d7d242435eb54957a4e970d5c261a0a2","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":5,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T20:44:53.491Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"aac8ed7cebd546f38662bcd41167e22e","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":4,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T19:51:49.853Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"bc68fb8c04584744898adcdda9fbb3ff","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":3,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-02T16:41:26.241Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"cabf55bc55084213819664d5e1fb90ee","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":2,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-27T14:32:52.704Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"4b8eb2ef06db4e2d9f02239dd5cffcb1","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":1,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-18T14:21:24.311Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34","solicitation_number":"12405B25R0009"}]},{"notice_id":"f8a3d8829fe44ae2939463cc74e3084b","title":"Replacement of Roofing and Siding; and Paint Building 42","solicitation_number":"12405B25R0009","notice_type":"k","base_type":"k","posted":"2025-02-11","posted_at":"2025-02-11T13:15:09.914Z","due_at":"2025-02-21T22:00:00Z","due_date":"2025-02-21","cancelled":false,"archived":true,"archive_date":"2025-03-08","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f8a3d8829fe44ae2939463cc74e3084b/view","enriched":true,"history":[{"index":13,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-20T17:08:01.632Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"7ff365b1e5354670b25789b896a4ad6f","solicitation_number":"12405B25R0009A","related_opportunity_id":"f8a3d8829fe44ae2939463cc74e3084b"},{"index":10,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T13:15:09.914Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"f8a3d8829fe44ae2939463cc74e3084b","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":8,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T13:13:50.482Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"64da250cf0c84f169baf4c2252ed6d26","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":7,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2025-01-30T20:01:46.731Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"01b24eb430be4b8ea160b55f566cc671","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":6,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-16T19:15:05.924Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"d7d242435eb54957a4e970d5c261a0a2","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":5,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T20:44:53.491Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"aac8ed7cebd546f38662bcd41167e22e","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":4,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T19:51:49.853Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"bc68fb8c04584744898adcdda9fbb3ff","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":3,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-02T16:41:26.241Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"cabf55bc55084213819664d5e1fb90ee","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":2,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-27T14:32:52.704Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"4b8eb2ef06db4e2d9f02239dd5cffcb1","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":1,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-18T14:21:24.311Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34","solicitation_number":"12405B25R0009"}]},{"notice_id":"7ff365b1e5354670b25789b896a4ad6f","title":"Replacement of Roofing and Siding; and Paint Building 42","solicitation_number":"12405B25R0009A","notice_type":"a","base_type":"k","posted":"2025-03-20","posted_at":"2025-03-20T17:08:01.632Z","due_at":null,"due_date":null,"cancelled":false,"archived":true,"archive_date":"2025-04-04","removed_at":null,"award_number":"12405B25C0004","awardee_name":"SIEVERDING CONSTRUCTION, INC.","amount":"94425.00","link_sam":"https://sam.gov/workspace/contract/opp/7ff365b1e5354670b25789b896a4ad6f/view","enriched":true,"history":[{"index":5,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-20T17:08:01.632Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"7ff365b1e5354670b25789b896a4ad6f","solicitation_number":"12405B25R0009A","related_opportunity_id":"f8a3d8829fe44ae2939463cc74e3084b"},{"index":2,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T13:15:09.914Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"f8a3d8829fe44ae2939463cc74e3084b","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"}]}],"latest_notice_id":"7ff365b1e5354670b25789b896a4ad6f","first_type":"k","notices":[{"dates":{"posted":"2024-12-18","response_deadline":{"raw":"2025-01-17T16:00:00-06:00","utc":"2025-01-17T22:00:00Z","date":"2025-01-17","time":"16:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/13db359e57fc4ab2a8c94cc72cb31f34/view"},"naics":{"codes":["238160"],"primary":"238160"},"title":"Replacement of Roofing and Siding; and Paint Building 42","agency":{"office":{"code":"12405B","name":"USDA ARS SEA AAO ACQ/PER PROP"},"subtier":{"code":"12H2","name":"AGRICULTURAL RESEARCH SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"38776","city":"STONEVILLE","state":"MS","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-02-01","archive_type":"auto15"},"contacts":[{"name":"Lynn Hults","role":"primary","email":"lynn.hults@usda.gov","phone":"9124649723"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"13db359e57fc4ab2a8c94cc72cb31f34","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"f30a66003cab538be896b1a006850fb7a55927a232e0bb2eed28b7b5253d2f44","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"A. Project Title: Replacement of Roofing and Siding; and painting of Building 42, USDA, ARS Facility in Starkville, MS. B. Competition is set aside for Small Businesses. Applicable NAICS code is 238160 Roofing Contractors. C. In accordance with Federal Acquisition Regulation (FAR) 36.204 the magnitude of this construction project is between $100,000 and $250,000. D. Prospective offerors shall complete block 14, 15 and 19. E. Prospective offerors shall be registered with Systems for Awards Management(SAM)with an active registration.","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"12405B25R0009","place_of_performance":{"zip":"39759","city":{"name":"Starkville"},"state":{"code":"MS"},"country":{"code":"USA"}},"product_service_code":"Z1DB"},{"dates":{"posted":"2024-12-27","response_deadline":{"raw":"2025-01-17T16:00:00-06:00","utc":"2025-01-17T22:00:00Z","date":"2025-01-17","time":"16:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/4b8eb2ef06db4e2d9f02239dd5cffcb1/view"},"naics":{"codes":["238160"],"primary":"238160"},"title":"Replacement of Roofing and Siding; and Paint Building 42","agency":{"office":{"code":"12405B","name":"USDA ARS SEA AAO ACQ/PER PROP"},"subtier":{"code":"12H2","name":"AGRICULTURAL RESEARCH SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"38776","city":"STONEVILLE","state":"MS","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-02-01","archive_type":"auto15"},"contacts":[{"name":"Lynn Hults","role":"primary","email":"lynn.hults@usda.gov","phone":"9124649723"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"4b8eb2ef06db4e2d9f02239dd5cffcb1","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"6fd17441ba27147a958edf151164aa18a1ee111621676340ac37a2d3e9b75afe","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"Questions and Answers Q1: Is the intent to apply Top Coat to the areas that have been repaired only, or to the entire exterior of Buildings 22, 26, 27 & 29 once the repairs are complete and those areas are primed. A1: Only the areas that are repaired under this contract. A. Project Title: Replacement of Roofing and Siding; and painting of Building 42, USDA, ARS Facility in Starkville, MS. B. Competition is set aside for Small Businesses. Applicable NAICS code is 238160 Roofing Contractors. C. In accordance with Federal Acquisition Regulation (FAR) 36.204 the magnitude of this construction project is between $100,000 and $250,000. D. Prospective offerors shall complete block 14, 15 and 19. E. Prospective offerors shall be registered with Systems for Awards Management(SAM)with an active registration.","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"12405B25R0009","place_of_performance":{"zip":"39759","city":{"name":"Starkville"},"state":{"code":"MS"},"country":{"code":"USA"}},"product_service_code":"Z1DB"},{"dates":{"posted":"2025-01-02","response_deadline":{"raw":"2025-01-17T16:00:00-06:00","utc":"2025-01-17T22:00:00Z","date":"2025-01-17","time":"16:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/cabf55bc55084213819664d5e1fb90ee/view"},"naics":{"codes":["238160"],"primary":"238160"},"title":"Replacement of Roofing and Siding; and Paint Building 42","agency":{"office":{"code":"12405B","name":"USDA ARS SEA AAO ACQ/PER PROP"},"subtier":{"code":"12H2","name":"AGRICULTURAL RESEARCH SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"38776","city":"STONEVILLE","state":"MS","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-02-01","archive_type":"auto15"},"contacts":[{"name":"Lynn Hults","role":"primary","email":"lynn.hults@usda.gov","phone":"9124649723"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"cabf55bc55084213819664d5e1fb90ee","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"89b282a1e317e8da9b9f7efb44b903fb04399c0ce05447d0ab3c76fee5b12935","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"Questions and Answers Q1: Is the intent to apply Top Coat to the areas that have been repaired only, or to the entire exterior of Buildings 22, 26, 27 & 29 once the repairs are complete and those areas are primed. A1: Only the areas that are repaired under this contract. Q2: Can I use Mule-Hide PVC product as an accepted equal PVC product? A2: This appears to be equivelant and thus acceptable. A. Project Title: Replacement of Roofing and Siding; and painting of Building 42, USDA, ARS Facility in Starkville, MS. B. Competition is set aside for Small Businesses. Applicable NAICS code is 238160 Roofing Contractors. C. In accordance with Federal Acquisition Regulation (FAR) 36.204 the magnitude of this construction project is between $100,000 and $250,000. D. Prospective offerors shall complete block 14, 15 and 19. E. Prospective offerors shall be registered with Systems for Awards Management(SAM)with an active registration.","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"12405B25R0009","place_of_performance":{"zip":"39759","city":{"name":"Starkville"},"state":{"code":"MS"},"country":{"code":"USA"}},"product_service_code":"Z1DB"},{"dates":{"posted":"2025-01-13","posted_at":"2025-01-13T20:44:53.491Z","created_at":"2025-01-13T20:43:01.451Z","modified_at":"2025-03-09T04:55:43.730Z","response_deadline":{"raw":"2025-01-17T16:00:00-06:00","utc":"2025-01-17T22:00:00Z","date":"2025-01-17","time":"16:00:00","timezone":"America/Chicago","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/aac8ed7cebd546f38662bcd41167e22e/view"},"naics":{"codes":["238160"],"primary":"238160"},"title":"Replacement of Roofing and Siding; and Paint Building 42","agency":{"office":{"code":"12405B","name":"USDA ARS SEA AAO ACQ/PER PROP"},"subtier":{"code":"12H2","name":"AGRICULTURAL RESEARCH SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"38776","city":"STONEVILLE","state":"MS","country":"USA"},"organization_id":"500033339","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-02-01","archive_type":"auto15"},"history":[{"index":10,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T13:15:09.914Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"f8a3d8829fe44ae2939463cc74e3084b","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":8,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T13:13:50.482Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"64da250cf0c84f169baf4c2252ed6d26","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":7,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2025-01-30T20:01:46.731Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"01b24eb430be4b8ea160b55f566cc671","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":6,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-16T19:15:05.924Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"d7d242435eb54957a4e970d5c261a0a2","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":5,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T20:44:53.491Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"aac8ed7cebd546f38662bcd41167e22e","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":4,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T19:51:49.853Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"bc68fb8c04584744898adcdda9fbb3ff","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":3,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-02T16:41:26.241Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"cabf55bc55084213819664d5e1fb90ee","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":2,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-27T14:32:52.704Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"4b8eb2ef06db4e2d9f02239dd5cffcb1","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":1,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-18T14:21:24.311Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34","solicitation_number":"12405B25R0009"}],"contacts":[{"name":"Lynn Hults","role":"primary","email":"lynn.hults@usda.gov","phone":"9124649723"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"aac8ed7cebd546f38662bcd41167e22e","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"13db359e57fc4ab2a8c94cc72cb31f34","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-25T04:30:21.267432217Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"8af5b0337506d0ceb40918759ce8427d460eac8689d3f2d6af88265c1eff0a00","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-25T04:30:21.267432217Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>@ additional Clauses required for insertion into this project.</p>\n\n<p>52.223-2&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reporting of Biobased Products Under Service and Construction&nbsp;Contracts&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;</p>\n\n<p>52.223-23&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Sustainable Products and Services</p>\n\n<p></p>\n\n<p>Questions and Answers</p>\n\n<p>Q1:&nbsp;Is the intent to apply Top Coat to the areas that have been repaired only, or to the entire exterior of <strong>Buildings 22, 26, 27 &amp; 29</strong> once the repairs are complete and those areas are primed.</p>\n\n<p>A1:&nbsp;Only the areas that are repaired under this contract.</p>\n\n<p>Q2:&nbsp;Can I use Mule-Hide PVC product as an accepted equal PVC product?</p>\n\n<p>A2: This appears to be equivelant and thus acceptable.</p>\n\n<p>Q3:&nbsp;What is the existing deck of the roof ?&nbsp; Concrete, Metal, etc. ? Is the Deck sloped ?&nbsp;</p>\n\n<p>A3: Rubber EPDM rubber. Its is slopped to the north from half way of the building and slopped to the south from half way of the building.&nbsp;&nbsp;The Building in question is a double wide modular structure.&nbsp; Whatever is the industry standard for this type of building is what I would assume this deck is made of.&nbsp; &nbsp;The deck is presently sloped, but that could very well have been accomplished with the ISO board insulation.</p>\n\n<p>Q4:&nbsp;Where will there be a staging area inside the fenced area or outside ?</p>\n\n<p>A4:&nbsp;Yes there is a large open lay down area inside the fence, also outside the fence if they want to use outside area.</p>\n\n<p>Q5:&nbsp;Will power be provided by the USDA or will the contractor have to supply a generator ?</p>\n\n<p>A5:&nbsp;We can supply power with just a had full of 15 amp, 120 volt. Larger loads 220 volt and 20 amp 120 volt would be easier with contractor supplied generator.</p>\n\n<p></p>\n\n<p>A. Project Title: Replacement of Roofing and Siding; and painting of Building 42, USDA, ARS Facility in Starkville, MS.</p>\n\n<p>B. Competition is set aside for Small Businesses. Applicable NAICS code is 238160 Roofing Contractors.</p>\n\n<p>C. In accordance with Federal Acquisition Regulation (FAR) 36.204 the magnitude of this construction project is between $100,000 and $250,000.</p>\n\n<p>D. Prospective offerors shall complete block 14, 15 and 19.</p>\n\n<p>E. Prospective offerors shall be registered with Systems for Awards Management(SAM)with an active registration.</p>","text":"@ additional Clauses required for insertion into this project.\n\n52.223-2 Reporting of Biobased Products Under Service and Construction Contracts\n\n52.223-23 Sustainable Products and Services\n\nQuestions and Answers\n\nQ1: Is the intent to apply Top Coat to the areas that have been repaired only, or to the entire exterior of Buildings 22, 26, 27 & 29 once the repairs are complete and those areas are primed.\n\nA1: Only the areas that are repaired under this contract.\n\nQ2: Can I use Mule-Hide PVC product as an accepted equal PVC product?\n\nA2: This appears to be equivelant and thus acceptable.\n\nQ3: What is the existing deck of the roof ? Concrete, Metal, etc. ? Is the Deck sloped ?\n\nA3: Rubber EPDM rubber. Its is slopped to the north from half way of the building and slopped to the south from half way of the building. The Building in question is a double wide modular structure. Whatever is the industry standard for this type of building is what I would assume this deck is made of. The deck is presently sloped, but that could very well have been accomplished with the ISO board insulation.\n\nQ4: Where will there be a staging area inside the fenced area or outside ?\n\nA4: Yes there is a large open lay down area inside the fence, also outside the fence if they want to use outside area.\n\nQ5: Will power be provided by the USDA or will the contractor have to supply a generator ?\n\nA5: We can supply power with just a had full of 15 amp, 120 volt. Larger loads 220 volt and 20 amp 120 volt would be easier with contractor supplied generator.\n\nA. Project Title: Replacement of Roofing and Siding; and painting of Building 42, USDA, ARS Facility in Starkville, MS.\n\nB. Competition is set aside for Small Businesses. Applicable NAICS code is 238160 Roofing Contractors.\n\nC. In accordance with Federal Acquisition Regulation (FAR) 36.204 the magnitude of this construction project is between $100,000 and $250,000.\n\nD. Prospective offerors shall complete block 14, 15 and 19.\n\nE. Prospective offerors shall be registered with Systems for Awards Management(SAM)with an active registration.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"12405B25R0009","place_of_performance":{"zip":"39759","city":{"code":"70240","name":"Starkville"},"state":{"code":"MS","name":"Mississippi"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z1DB"},{"dates":{"posted":"2025-01-13","posted_at":"2025-01-13T19:51:49.853Z","created_at":"2025-01-13T19:48:33.164Z","modified_at":"2025-03-09T04:55:43.730Z","response_deadline":{"raw":"2025-01-17T16:00:00-06:00","utc":"2025-01-17T22:00:00Z","date":"2025-01-17","time":"16:00:00","timezone":"America/Chicago","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/bc68fb8c04584744898adcdda9fbb3ff/view"},"naics":{"codes":["238160"],"primary":"238160"},"title":"Replacement of Roofing and Siding; and Paint Building 42","agency":{"office":{"code":"12405B","name":"USDA ARS SEA AAO ACQ/PER PROP"},"subtier":{"code":"12H2","name":"AGRICULTURAL RESEARCH SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"38776","city":"STONEVILLE","state":"MS","country":"USA"},"organization_id":"500033339","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-02-01","archive_type":"auto15"},"history":[{"index":10,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T13:15:09.914Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"f8a3d8829fe44ae2939463cc74e3084b","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":8,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T13:13:50.482Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"64da250cf0c84f169baf4c2252ed6d26","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":7,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2025-01-30T20:01:46.731Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"01b24eb430be4b8ea160b55f566cc671","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":6,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-16T19:15:05.924Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"d7d242435eb54957a4e970d5c261a0a2","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":5,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T20:44:53.491Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"aac8ed7cebd546f38662bcd41167e22e","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":4,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T19:51:49.853Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"bc68fb8c04584744898adcdda9fbb3ff","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":3,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-02T16:41:26.241Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"cabf55bc55084213819664d5e1fb90ee","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":2,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-27T14:32:52.704Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"4b8eb2ef06db4e2d9f02239dd5cffcb1","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":1,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-18T14:21:24.311Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34","solicitation_number":"12405B25R0009"}],"contacts":[{"name":"Lynn Hults","role":"primary","email":"lynn.hults@usda.gov","phone":"9124649723"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"bc68fb8c04584744898adcdda9fbb3ff","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"13db359e57fc4ab2a8c94cc72cb31f34","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-25T04:32:17.768362131Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"348ed98f6f29b824dbe78ac5edcbf0d4135457fa75abdaeeedd28598fa08c677","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-25T04:32:17.768362131Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>Questions and Answers</p>\n\n<p>Q1:&nbsp;Is the intent to apply Top Coat to the areas that have been repaired only, or to the entire exterior of <strong>Buildings 22, 26, 27 &amp; 29</strong> once the repairs are complete and those areas are primed.</p>\n\n<p>A1:&nbsp;Only the areas that are repaired under this contract.</p>\n\n<p>Q2:&nbsp;Can I use Mule-Hide PVC product as an accepted equal PVC product?</p>\n\n<p>A2: This appears to be equivelant and thus acceptable.</p>\n\n<p>Q3:&nbsp;What is the existing deck of the roof ?&nbsp; Concrete, Metal, etc. ? Is the Deck sloped ?&nbsp;</p>\n\n<p>A3: Rubber EPDM rubber. Its is slopped to the north from half way of the building and slopped to the south from half way of the building.&nbsp;&nbsp;The Building in question is a double wide modular structure.&nbsp; Whatever is the industry standard for this type of building is what I would assume this deck is made of.&nbsp; &nbsp;The deck is presently sloped, but that could very well have been accomplished with the ISO board insulation.</p>\n\n<p>Q4:&nbsp;Where will there be a staging area inside the fenced area or outside ?</p>\n\n<p>A4:&nbsp;Yes there is a large open lay down area inside the fence, also outside the fence if they want to use outside area.</p>\n\n<p>Q5:&nbsp;Will power be provided by the USDA or will the contractor have to supply a generator ?</p>\n\n<p>A5:&nbsp;We can supply power with just a had full of 15 amp, 120 volt. Larger loads 220 volt and 20 amp 120 volt would be easier with contractor supplied generator.</p>\n\n<p></p>\n\n<p>A. Project Title: Replacement of Roofing and Siding; and painting of Building 42, USDA, ARS Facility in Starkville, MS.</p>\n\n<p>B. Competition is set aside for Small Businesses. Applicable NAICS code is 238160 Roofing Contractors.</p>\n\n<p>C. In accordance with Federal Acquisition Regulation (FAR) 36.204 the magnitude of this construction project is between $100,000 and $250,000.</p>\n\n<p>D. Prospective offerors shall complete block 14, 15 and 19.</p>\n\n<p>E. Prospective offerors shall be registered with Systems for Awards Management(SAM)with an active registration.</p>","text":"Questions and Answers\n\nQ1: Is the intent to apply Top Coat to the areas that have been repaired only, or to the entire exterior of Buildings 22, 26, 27 & 29 once the repairs are complete and those areas are primed.\n\nA1: Only the areas that are repaired under this contract.\n\nQ2: Can I use Mule-Hide PVC product as an accepted equal PVC product?\n\nA2: This appears to be equivelant and thus acceptable.\n\nQ3: What is the existing deck of the roof ? Concrete, Metal, etc. ? Is the Deck sloped ?\n\nA3: Rubber EPDM rubber. Its is slopped to the north from half way of the building and slopped to the south from half way of the building. The Building in question is a double wide modular structure. Whatever is the industry standard for this type of building is what I would assume this deck is made of. The deck is presently sloped, but that could very well have been accomplished with the ISO board insulation.\n\nQ4: Where will there be a staging area inside the fenced area or outside ?\n\nA4: Yes there is a large open lay down area inside the fence, also outside the fence if they want to use outside area.\n\nQ5: Will power be provided by the USDA or will the contractor have to supply a generator ?\n\nA5: We can supply power with just a had full of 15 amp, 120 volt. Larger loads 220 volt and 20 amp 120 volt would be easier with contractor supplied generator.\n\nA. Project Title: Replacement of Roofing and Siding; and painting of Building 42, USDA, ARS Facility in Starkville, MS.\n\nB. Competition is set aside for Small Businesses. Applicable NAICS code is 238160 Roofing Contractors.\n\nC. In accordance with Federal Acquisition Regulation (FAR) 36.204 the magnitude of this construction project is between $100,000 and $250,000.\n\nD. Prospective offerors shall complete block 14, 15 and 19.\n\nE. Prospective offerors shall be registered with Systems for Awards Management(SAM)with an active registration.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"12405B25R0009","place_of_performance":{"zip":"39759","city":{"code":"70240","name":"Starkville"},"state":{"code":"MS","name":"Mississippi"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z1DB"},{"dates":{"posted":"2025-01-16","posted_at":"2025-01-16T19:15:05.924Z","created_at":"2025-01-16T19:11:12.176Z","modified_at":"2025-03-09T04:55:43.730Z","response_deadline":{"raw":"2025-01-31T16:00:00-06:00","utc":"2025-01-31T22:00:00Z","date":"2025-01-31","time":"16:00:00","timezone":"America/Chicago","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d7d242435eb54957a4e970d5c261a0a2/view"},"naics":{"codes":["238160"],"primary":"238160"},"title":"Replacement of Roofing and Siding; and Paint Building 42","agency":{"office":{"code":"12405B","name":"USDA ARS SEA AAO ACQ/PER PROP"},"subtier":{"code":"12H2","name":"AGRICULTURAL RESEARCH SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"38776","city":"STONEVILLE","state":"MS","country":"USA"},"organization_id":"500033339","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-02-15","archive_type":"auto15"},"history":[{"index":10,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T13:15:09.914Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"f8a3d8829fe44ae2939463cc74e3084b","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":8,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T13:13:50.482Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"64da250cf0c84f169baf4c2252ed6d26","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":7,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2025-01-30T20:01:46.731Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"01b24eb430be4b8ea160b55f566cc671","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":6,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-16T19:15:05.924Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"d7d242435eb54957a4e970d5c261a0a2","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":5,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T20:44:53.491Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"aac8ed7cebd546f38662bcd41167e22e","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":4,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T19:51:49.853Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"bc68fb8c04584744898adcdda9fbb3ff","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":3,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-02T16:41:26.241Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"cabf55bc55084213819664d5e1fb90ee","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":2,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-27T14:32:52.704Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"4b8eb2ef06db4e2d9f02239dd5cffcb1","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":1,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-18T14:21:24.311Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34","solicitation_number":"12405B25R0009"}],"contacts":[{"name":"Lynn Hults","role":"primary","email":"lynn.hults@usda.gov","phone":"9124649723"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"d7d242435eb54957a4e970d5c261a0a2","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"13db359e57fc4ab2a8c94cc72cb31f34","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-25T02:38:16.885207234Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"9c1499ac8c89f9724857626963a28b9f8e2dc0eb431772c64be95445089220ad","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-25T02:38:16.885207234Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>The solicitation has been extended until 01/31/2025.&nbsp;</p>\n\n<p>A second site visit has been scheduled for 01/24/2025 at 10:00 AM CST. Please send the name of the personnel requesting to attend along with the name of the company they represent to lynn.hults@usda.gov by 3:00 PM 01/23/2025.</p>\n\n<p>The first site visit attendance list is now attached.</p>\n\n<p>@ additional Clauses required for insertion into this project.</p>\n\n<p>52.223-2&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reporting of Biobased Products Under Service and Construction&nbsp;Contracts&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;</p>\n\n<p>52.223-23&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Sustainable Products and Services</p>\n\n<p></p>\n\n<p>Questions and Answers</p>\n\n<p>Q1:&nbsp;Is the intent to apply Top Coat to the areas that have been repaired only, or to the entire exterior of <strong>Buildings 22, 26, 27 &amp; 29</strong> once the repairs are complete and those areas are primed.</p>\n\n<p>A1:&nbsp;Only the areas that are repaired under this contract.</p>\n\n<p>Q2:&nbsp;Can I use Mule-Hide PVC product as an accepted equal PVC product?</p>\n\n<p>A2: This appears to be equivelant and thus acceptable.</p>\n\n<p>Q3:&nbsp;What is the existing deck of the roof ?&nbsp; Concrete, Metal, etc. ? Is the Deck sloped ?&nbsp;</p>\n\n<p>A3: Rubber EPDM rubber. Its is slopped to the north from half way of the building and slopped to the south from half way of the building.&nbsp;&nbsp;The Building in question is a double wide modular structure.&nbsp; Whatever is the industry standard for this type of building is what I would assume this deck is made of.&nbsp; &nbsp;The deck is presently sloped, but that could very well have been accomplished with the ISO board insulation.</p>\n\n<p>Q4:&nbsp;Where will there be a staging area inside the fenced area or outside ?</p>\n\n<p>A4:&nbsp;Yes there is a large open lay down area inside the fence, also outside the fence if they want to use outside area.</p>\n\n<p>Q5:&nbsp;Will power be provided by the USDA or will the contractor have to supply a generator ?</p>\n\n<p>A5:&nbsp;We can supply power with just a had full of 15 amp, 120 volt. Larger loads 220 volt and 20 amp 120 volt would be easier with contractor supplied generator.</p>\n\n<p></p>\n\n<p>A. Project Title: Replacement of Roofing and Siding; and painting of Building 42, USDA, ARS Facility in Starkville, MS.</p>\n\n<p>B. Competition is set aside for Small Businesses. Applicable NAICS code is 238160 Roofing Contractors.</p>\n\n<p>C. In accordance with Federal Acquisition Regulation (FAR) 36.204 the magnitude of this construction project is between $100,000 and $250,000.</p>\n\n<p>D. Prospective offerors shall complete block 14, 15 and 19.</p>\n\n<p>E. Prospective offerors shall be registered with Systems for Awards Management(SAM)with an active registration.</p>","text":"The solicitation has been extended until 01/31/2025.\n\nA second site visit has been scheduled for 01/24/2025 at 10:00 AM CST. Please send the name of the personnel requesting to attend along with the name of the company they represent to lynn.hults@usda.gov by 3:00 PM 01/23/2025.\n\nThe first site visit attendance list is now attached.\n\n@ additional Clauses required for insertion into this project.\n\n52.223-2 Reporting of Biobased Products Under Service and Construction Contracts\n\n52.223-23 Sustainable Products and Services\n\nQuestions and Answers\n\nQ1: Is the intent to apply Top Coat to the areas that have been repaired only, or to the entire exterior of Buildings 22, 26, 27 & 29 once the repairs are complete and those areas are primed.\n\nA1: Only the areas that are repaired under this contract.\n\nQ2: Can I use Mule-Hide PVC product as an accepted equal PVC product?\n\nA2: This appears to be equivelant and thus acceptable.\n\nQ3: What is the existing deck of the roof ? Concrete, Metal, etc. ? Is the Deck sloped ?\n\nA3: Rubber EPDM rubber. Its is slopped to the north from half way of the building and slopped to the south from half way of the building. The Building in question is a double wide modular structure. Whatever is the industry standard for this type of building is what I would assume this deck is made of. The deck is presently sloped, but that could very well have been accomplished with the ISO board insulation.\n\nQ4: Where will there be a staging area inside the fenced area or outside ?\n\nA4: Yes there is a large open lay down area inside the fence, also outside the fence if they want to use outside area.\n\nQ5: Will power be provided by the USDA or will the contractor have to supply a generator ?\n\nA5: We can supply power with just a had full of 15 amp, 120 volt. Larger loads 220 volt and 20 amp 120 volt would be easier with contractor supplied generator.\n\nA. Project Title: Replacement of Roofing and Siding; and painting of Building 42, USDA, ARS Facility in Starkville, MS.\n\nB. Competition is set aside for Small Businesses. Applicable NAICS code is 238160 Roofing Contractors.\n\nC. In accordance with Federal Acquisition Regulation (FAR) 36.204 the magnitude of this construction project is between $100,000 and $250,000.\n\nD. Prospective offerors shall complete block 14, 15 and 19.\n\nE. Prospective offerors shall be registered with Systems for Awards Management(SAM)with an active registration.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"12405B25R0009","place_of_performance":{"zip":"39759","city":{"code":"70240","name":"Starkville"},"state":{"code":"MS","name":"Mississippi"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z1DB"},{"dates":{"posted":"2025-02-11","posted_at":"2025-02-11T13:13:50.482Z","created_at":"2025-02-11T13:13:50.482Z","modified_at":"2025-03-09T04:55:43.730Z","response_deadline":{"raw":"2025-02-21T16:00:00-06:00","utc":"2025-02-21T22:00:00Z","date":"2025-02-21","time":"16:00:00","timezone":"America/Chicago","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/64da250cf0c84f169baf4c2252ed6d26/view"},"naics":{"codes":["238160"],"primary":"238160"},"title":"Replacement of Roofing and Siding; and Paint Building 42","agency":{"office":{"code":"12405B","name":"USDA ARS SEA AAO ACQ/PER PROP"},"subtier":{"code":"12H2","name":"AGRICULTURAL RESEARCH SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"38776","city":"STONEVILLE","state":"MS","country":"USA"},"organization_id":"500033339","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-03-08","archive_type":"auto15"},"history":[{"index":10,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T13:15:09.914Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"f8a3d8829fe44ae2939463cc74e3084b","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":8,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T13:13:50.482Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"64da250cf0c84f169baf4c2252ed6d26","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":7,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2025-01-30T20:01:46.731Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"01b24eb430be4b8ea160b55f566cc671","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":6,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-16T19:15:05.924Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"d7d242435eb54957a4e970d5c261a0a2","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":5,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T20:44:53.491Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"aac8ed7cebd546f38662bcd41167e22e","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":4,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T19:51:49.853Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"bc68fb8c04584744898adcdda9fbb3ff","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":3,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-02T16:41:26.241Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"cabf55bc55084213819664d5e1fb90ee","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":2,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-27T14:32:52.704Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"4b8eb2ef06db4e2d9f02239dd5cffcb1","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":1,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-18T14:21:24.311Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34","solicitation_number":"12405B25R0009"}],"contacts":[{"name":"Lynn Hults","role":"primary","email":"lynn.hults@usda.gov","phone":"9124649723"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"64da250cf0c84f169baf4c2252ed6d26","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"13db359e57fc4ab2a8c94cc72cb31f34","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-22T13:04:35.699980117Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"2a01e58cd40c5740f05c48fdc2c9a0a3a996800d949e8903dfcf9516207ab852","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-22T13:04:35.699980117Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This solicitation has been reopened.</p>\n\n<p>another site visit has been scheduled for Friday February 14, 2025, at 10:00 AM. Please&nbsp;send the name of the personnel requesting to attend along with the name of the company they represent to lynn.hults@usda.gov by 3:00 PM02/13/2025.</p>\n\n<p></p>\n\n<p>The solicitation has been extended until 01/31/2025.&nbsp;</p>\n\n<p>A second site visit has been scheduled for 01/24/2025 at 10:00 AM CST. Please send the name of the personnel requesting to attend along with the name of the company they represent to lynn.hults@usda.gov by 3:00 PM 01/23/2025.</p>\n\n<p>The first site visit attendance list is now attached.</p>\n\n<p>@ additional Clauses required for insertion into this project.</p>\n\n<p>52.223-2&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reporting of Biobased Products Under Service and Construction&nbsp;Contracts&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;</p>\n\n<p>52.223-23&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Sustainable Products and Services</p>\n\n<p></p>\n\n<p>Questions and Answers</p>\n\n<p>Q1:&nbsp;Is the intent to apply Top Coat to the areas that have been repaired only, or to the entire exterior of <strong>Buildings 22, 26, 27 &amp; 29</strong> once the repairs are complete and those areas are primed.</p>\n\n<p>A1:&nbsp;Only the areas that are repaired under this contract.</p>\n\n<p>Q2:&nbsp;Can I use Mule-Hide PVC product as an accepted equal PVC product?</p>\n\n<p>A2: This appears to be equivelant and thus acceptable.</p>\n\n<p>Q3:&nbsp;What is the existing deck of the roof ?&nbsp; Concrete, Metal, etc. ? Is the Deck sloped ?&nbsp;</p>\n\n<p>A3: Rubber EPDM rubber. Its is slopped to the north from half way of the building and slopped to the south from half way of the building.&nbsp;&nbsp;The Building in question is a double wide modular structure.&nbsp; Whatever is the industry standard for this type of building is what I would assume this deck is made of.&nbsp; &nbsp;The deck is presently sloped, but that could very well have been accomplished with the ISO board insulation.</p>\n\n<p>Q4:&nbsp;Where will there be a staging area inside the fenced area or outside ?</p>\n\n<p>A4:&nbsp;Yes there is a large open lay down area inside the fence, also outside the fence if they want to use outside area.</p>\n\n<p>Q5:&nbsp;Will power be provided by the USDA or will the contractor have to supply a generator ?</p>\n\n<p>A5:&nbsp;We can supply power with just a had full of 15 amp, 120 volt. Larger loads 220 volt and 20 amp 120 volt would be easier with contractor supplied generator.</p>\n\n<p></p>\n\n<p>A. Project Title: Replacement of Roofing and Siding; and painting of Building 42, USDA, ARS Facility in Starkville, MS.</p>\n\n<p>B. Competition is set aside for Small Businesses. Applicable NAICS code is 238160 Roofing Contractors.</p>\n\n<p>C. In accordance with Federal Acquisition Regulation (FAR) 36.204 the magnitude of this construction project is between $100,000 and $250,000.</p>\n\n<p>D. Prospective offerors shall complete block 14, 15 and 19.</p>\n\n<p>E. Prospective offerors shall be registered with Systems for Awards Management(SAM)with an active registration.</p>","text":"This solicitation has been reopened.\n\nanother site visit has been scheduled for Friday February 14, 2025, at 10:00 AM. Please send the name of the personnel requesting to attend along with the name of the company they represent to lynn.hults@usda.gov by 3:00 PM02/13/2025.\n\nThe solicitation has been extended until 01/31/2025.\n\nA second site visit has been scheduled for 01/24/2025 at 10:00 AM CST. Please send the name of the personnel requesting to attend along with the name of the company they represent to lynn.hults@usda.gov by 3:00 PM 01/23/2025.\n\nThe first site visit attendance list is now attached.\n\n@ additional Clauses required for insertion into this project.\n\n52.223-2 Reporting of Biobased Products Under Service and Construction Contracts\n\n52.223-23 Sustainable Products and Services\n\nQuestions and Answers\n\nQ1: Is the intent to apply Top Coat to the areas that have been repaired only, or to the entire exterior of Buildings 22, 26, 27 & 29 once the repairs are complete and those areas are primed.\n\nA1: Only the areas that are repaired under this contract.\n\nQ2: Can I use Mule-Hide PVC product as an accepted equal PVC product?\n\nA2: This appears to be equivelant and thus acceptable.\n\nQ3: What is the existing deck of the roof ? Concrete, Metal, etc. ? Is the Deck sloped ?\n\nA3: Rubber EPDM rubber. Its is slopped to the north from half way of the building and slopped to the south from half way of the building. The Building in question is a double wide modular structure. Whatever is the industry standard for this type of building is what I would assume this deck is made of. The deck is presently sloped, but that could very well have been accomplished with the ISO board insulation.\n\nQ4: Where will there be a staging area inside the fenced area or outside ?\n\nA4: Yes there is a large open lay down area inside the fence, also outside the fence if they want to use outside area.\n\nQ5: Will power be provided by the USDA or will the contractor have to supply a generator ?\n\nA5: We can supply power with just a had full of 15 amp, 120 volt. Larger loads 220 volt and 20 amp 120 volt would be easier with contractor supplied generator.\n\nA. Project Title: Replacement of Roofing and Siding; and painting of Building 42, USDA, ARS Facility in Starkville, MS.\n\nB. Competition is set aside for Small Businesses. Applicable NAICS code is 238160 Roofing Contractors.\n\nC. In accordance with Federal Acquisition Regulation (FAR) 36.204 the magnitude of this construction project is between $100,000 and $250,000.\n\nD. Prospective offerors shall complete block 14, 15 and 19.\n\nE. Prospective offerors shall be registered with Systems for Awards Management(SAM)with an active registration.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"12405B25R0009","place_of_performance":{"zip":"39759","city":{"code":"70240","name":"Starkville"},"state":{"code":"MS","name":"Mississippi"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z1DB"},{"dates":{"posted":"2025-02-11","posted_at":"2025-02-11T13:15:09.914Z","created_at":"2025-02-11T13:14:02.410Z","modified_at":"2025-03-09T04:55:43.730Z","response_deadline":{"raw":"2025-02-21T16:00:00-06:00","utc":"2025-02-21T22:00:00Z","date":"2025-02-21","time":"16:00:00","timezone":"America/Chicago","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/f8a3d8829fe44ae2939463cc74e3084b/view"},"naics":{"codes":["238160"],"primary":"238160"},"title":"Replacement of Roofing and Siding; and Paint Building 42","agency":{"office":{"code":"12405B","name":"USDA ARS SEA AAO ACQ/PER PROP"},"subtier":{"code":"12H2","name":"AGRICULTURAL RESEARCH SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"38776","city":"STONEVILLE","state":"MS","country":"USA"},"organization_id":"500033339","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-03-08","archive_type":"auto15"},"history":[{"index":13,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-20T17:08:01.632Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"7ff365b1e5354670b25789b896a4ad6f","solicitation_number":"12405B25R0009A","related_opportunity_id":"f8a3d8829fe44ae2939463cc74e3084b"},{"index":10,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T13:15:09.914Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"f8a3d8829fe44ae2939463cc74e3084b","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":8,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T13:13:50.482Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"64da250cf0c84f169baf4c2252ed6d26","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":7,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2025-01-30T20:01:46.731Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"01b24eb430be4b8ea160b55f566cc671","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":6,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-16T19:15:05.924Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"d7d242435eb54957a4e970d5c261a0a2","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":5,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T20:44:53.491Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"aac8ed7cebd546f38662bcd41167e22e","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":4,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-13T19:51:49.853Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"bc68fb8c04584744898adcdda9fbb3ff","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":3,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-02T16:41:26.241Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"cabf55bc55084213819664d5e1fb90ee","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":2,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-27T14:32:52.704Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"4b8eb2ef06db4e2d9f02239dd5cffcb1","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"},{"index":1,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-18T14:21:24.311Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34","solicitation_number":"12405B25R0009"}],"contacts":[{"name":"Lynn Hults","role":"primary","email":"lynn.hults@usda.gov","phone":"9124649723"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"f8a3d8829fe44ae2939463cc74e3084b","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"13db359e57fc4ab2a8c94cc72cb31f34","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-23T00:42:09.250672904Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"d823d35a77503a0c79cfb077b45080c5b95b3b32d87a1c7822465b572c73241a","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-23T00:42:09.250672904Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This solicitation has been reopened.</p>\n\n<p>another site visit has been scheduled for Friday February 14, 2025, at 10:00 AM. Please&nbsp;send the name of the personnel requesting to attend along with the name of the company they represent to lynn.hults@usda.gov by 3:00 PM02/13/2025.</p>\n\n<p></p>\n\n<p>The solicitation has been extended until 01/31/2025.&nbsp;</p>\n\n<p>A second site visit has been scheduled for 01/24/2025 at 10:00 AM CST. Please send the name of the personnel requesting to attend along with the name of the company they represent to lynn.hults@usda.gov by 3:00 PM 01/23/2025.</p>\n\n<p>The first site visit attendance list is now attached.</p>\n\n<p>@ additional Clauses required for insertion into this project.</p>\n\n<p>52.223-2&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reporting of Biobased Products Under Service and Construction&nbsp;Contracts&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;</p>\n\n<p>52.223-23&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Sustainable Products and Services</p>\n\n<p></p>\n\n<p>Questions and Answers</p>\n\n<p>Q1:&nbsp;Is the intent to apply Top Coat to the areas that have been repaired only, or to the entire exterior of <strong>Buildings 22, 26, 27 &amp; 29</strong> once the repairs are complete and those areas are primed.</p>\n\n<p>A1:&nbsp;Only the areas that are repaired under this contract.</p>\n\n<p>Q2:&nbsp;Can I use Mule-Hide PVC product as an accepted equal PVC product?</p>\n\n<p>A2: This appears to be equivelant and thus acceptable.</p>\n\n<p>Q3:&nbsp;What is the existing deck of the roof ?&nbsp; Concrete, Metal, etc. ? Is the Deck sloped ?&nbsp;</p>\n\n<p>A3: Rubber EPDM rubber. Its is slopped to the north from half way of the building and slopped to the south from half way of the building.&nbsp;&nbsp;The Building in question is a double wide modular structure.&nbsp; Whatever is the industry standard for this type of building is what I would assume this deck is made of.&nbsp; &nbsp;The deck is presently sloped, but that could very well have been accomplished with the ISO board insulation.</p>\n\n<p>Q4:&nbsp;Where will there be a staging area inside the fenced area or outside ?</p>\n\n<p>A4:&nbsp;Yes there is a large open lay down area inside the fence, also outside the fence if they want to use outside area.</p>\n\n<p>Q5:&nbsp;Will power be provided by the USDA or will the contractor have to supply a generator ?</p>\n\n<p>A5:&nbsp;We can supply power with just a had full of 15 amp, 120 volt. Larger loads 220 volt and 20 amp 120 volt would be easier with contractor supplied generator.</p>\n\n<p></p>\n\n<p>A. Project Title: Replacement of Roofing and Siding; and painting of Building 42, USDA, ARS Facility in Starkville, MS.</p>\n\n<p>B. Competition is set aside for Small Businesses. Applicable NAICS code is 238160 Roofing Contractors.</p>\n\n<p>C. In accordance with Federal Acquisition Regulation (FAR) 36.204 the magnitude of this construction project is between $100,000 and $250,000.</p>\n\n<p>D. Prospective offerors shall complete block 14, 15 and 19.</p>\n\n<p>E. Prospective offerors shall be registered with Systems for Awards Management(SAM)with an active registration.</p>","text":"This solicitation has been reopened.\n\nanother site visit has been scheduled for Friday February 14, 2025, at 10:00 AM. Please send the name of the personnel requesting to attend along with the name of the company they represent to lynn.hults@usda.gov by 3:00 PM02/13/2025.\n\nThe solicitation has been extended until 01/31/2025.\n\nA second site visit has been scheduled for 01/24/2025 at 10:00 AM CST. Please send the name of the personnel requesting to attend along with the name of the company they represent to lynn.hults@usda.gov by 3:00 PM 01/23/2025.\n\nThe first site visit attendance list is now attached.\n\n@ additional Clauses required for insertion into this project.\n\n52.223-2 Reporting of Biobased Products Under Service and Construction Contracts\n\n52.223-23 Sustainable Products and Services\n\nQuestions and Answers\n\nQ1: Is the intent to apply Top Coat to the areas that have been repaired only, or to the entire exterior of Buildings 22, 26, 27 & 29 once the repairs are complete and those areas are primed.\n\nA1: Only the areas that are repaired under this contract.\n\nQ2: Can I use Mule-Hide PVC product as an accepted equal PVC product?\n\nA2: This appears to be equivelant and thus acceptable.\n\nQ3: What is the existing deck of the roof ? Concrete, Metal, etc. ? Is the Deck sloped ?\n\nA3: Rubber EPDM rubber. Its is slopped to the north from half way of the building and slopped to the south from half way of the building. The Building in question is a double wide modular structure. Whatever is the industry standard for this type of building is what I would assume this deck is made of. The deck is presently sloped, but that could very well have been accomplished with the ISO board insulation.\n\nQ4: Where will there be a staging area inside the fenced area or outside ?\n\nA4: Yes there is a large open lay down area inside the fence, also outside the fence if they want to use outside area.\n\nQ5: Will power be provided by the USDA or will the contractor have to supply a generator ?\n\nA5: We can supply power with just a had full of 15 amp, 120 volt. Larger loads 220 volt and 20 amp 120 volt would be easier with contractor supplied generator.\n\nA. Project Title: Replacement of Roofing and Siding; and painting of Building 42, USDA, ARS Facility in Starkville, MS.\n\nB. Competition is set aside for Small Businesses. Applicable NAICS code is 238160 Roofing Contractors.\n\nC. In accordance with Federal Acquisition Regulation (FAR) 36.204 the magnitude of this construction project is between $100,000 and $250,000.\n\nD. Prospective offerors shall complete block 14, 15 and 19.\n\nE. Prospective offerors shall be registered with Systems for Awards Management(SAM)with an active registration.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"12405B25R0009","place_of_performance":{"zip":"39759","city":{"code":"70240","name":"Starkville"},"state":{"code":"MS","name":"Mississippi"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z1DB"},{"award":{"date":"2025-03-20","amount":"94425.00","number":"12405B25C0004","awardee":{"raw":"SIEVERDING CONSTRUCTION, INC. Mandeville LA 70471 USA","uei":"TM4THMXJZX97","cage":"9GJL2","name":"SIEVERDING CONSTRUCTION, INC.","location":{"zip":"70471","city":{"code":"48225","name":"Mandeville"},"state":{"code":"LA","name":"Louisiana"},"country":{"code":"USA","name":"UNITED STATES"}}}},"dates":{"posted":"2025-03-20","posted_at":"2025-03-20T17:08:01.632Z","award_date":"2025-03-20","created_at":"2025-03-20T17:04:00.317Z","modified_at":"2025-04-05T03:55:49.678Z"},"links":{"sam":"https://sam.gov/workspace/contract/opp/7ff365b1e5354670b25789b896a4ad6f/view"},"naics":{"codes":["238160"],"primary":"238160"},"title":"Replacement of Roofing and Siding; and Paint Building 42","agency":{"office":{"code":"12405B","name":"USDA ARS SEA AAO ACQ/PER PROP"},"subtier":{"code":"12H2","name":"AGRICULTURAL RESEARCH SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"38776","city":"STONEVILLE","state":"MS","country":"USA"},"organization_id":"500033339","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-04-04","archive_type":"auto15"},"history":[{"index":5,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-20T17:08:01.632Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"7ff365b1e5354670b25789b896a4ad6f","solicitation_number":"12405B25R0009A","related_opportunity_id":"f8a3d8829fe44ae2939463cc74e3084b"},{"index":2,"title":"Replacement of Roofing and Siding; and Paint Building 42","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-11T13:15:09.914Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"f8a3d8829fe44ae2939463cc74e3084b","solicitation_number":"12405B25R0009","parent_opportunity_id":"13db359e57fc4ab2a8c94cc72cb31f34"}],"contacts":[{"name":"Lynn Hults","role":"primary","email":"lynn.hults@usda.gov","phone":"9124649723"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"7ff365b1e5354670b25789b896a4ad6f","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"13db359e57fc4ab2a8c94cc72cb31f34","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-20T01:36:03.997869315Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"7caa494a6cc01c7a600486c7506f43de0adfe9cfebee51a19cddeac6fe4457f2","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-20T01:36:03.997869315Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"12405B25R0009A","place_of_performance":{"zip":"39759","city":{"code":"70240","name":"Starkville"},"state":{"code":"MS","name":"Mississippi"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z1DB"}],"due_at":"2025-02-21T22:00:00Z","due_date":"2025-02-21","closes_at":"2025-02-21T22:00:00Z","awardable":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12H2","sub_name":"AGRICULTURAL RESEARCH SERVICE","office_key":"o-12405B","office_name":"USDA ARS SEA AAO ACQ/PER PROP","state":"MS","county":"28105","county_name":"Oktibbeha County","city":"2870240","city_name":"Starkville","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"TM4THMXJZX97","amount":"94425.00","linked_awards":9,"cancelled":false,"archived":true,"updated_at":"2026-11-20T02:00:02.317985Z","principal_notice_id":"f8a3d8829fe44ae2939463cc74e3084b","description":{"text":"This solicitation has been reopened.\n\nanother site visit has been scheduled for Friday February 14, 2025, at 10:00 AM. Please send the name of the personnel requesting to attend along with the name of the company they represent to lynn.hults@usda.gov by 3:00 PM02/13/2025.\n\nThe solicitation has been extended until 01/31/2025.\n\nA second site visit has been scheduled for 01/24/2025 at 10:00 AM CST. Please send the name of the personnel requesting to attend along with the name of the company they represent to lynn.hults@usda.gov by 3:00 PM 01/23/2025.\n\nThe first site visit attendance list is now attached.\n\n@ additional Clauses required for insertion into this project.\n\n52.223-2 Reporting of Biobased Products Under Service and Construction Contracts\n\n52.223-23 Sustainable Products and Services\n\nQuestions and Answers\n\nQ1: Is the intent to apply Top Coat to the areas that have been repaired only, or to the entire exterior of Buildings 22, 26, 27 & 29 once the repairs are complete and those areas are primed.\n\nA1: Only the areas that are repaired under this contract.\n\nQ2: Can I use Mule-Hide PVC product as an accepted equal PVC product?\n\nA2: This appears to be equivelant and thus acceptable.\n\nQ3: What is the existing deck of the roof ? Concrete, Metal, etc. ? Is the Deck sloped ?\n\nA3: Rubber EPDM rubber. Its is slopped to the north from half way of the building and slopped to the south from half way of the building. The Building in question is a double wide modular structure. Whatever is the industry standard for this type of building is what I would assume this deck is made of. The deck is presently sloped, but that could very well have been accomplished with the ISO board insulation.\n\nQ4: Where will there be a staging area inside the fenced area or outside ?\n\nA4: Yes there is a large open lay down area inside the fence, also outside the fence if they want to use outside area.\n\nQ5: Will power be provided by the USDA or will the contractor have to supply a generator ?\n\nA5: We can supply power with just a had full of 15 amp, 120 volt. Larger loads 220 volt and 20 amp 120 volt would be easier with contractor supplied generator.\n\nA. Project Title: Replacement of Roofing and Siding; and painting of Building 42, USDA, ARS Facility in Starkville, MS.\n\nB. Competition is set aside for Small Businesses. Applicable NAICS code is 238160 Roofing Contractors.\n\nC. In accordance with Federal Acquisition Regulation (FAR) 36.204 the magnitude of this construction project is between $100,000 and $250,000.\n\nD. Prospective offerors shall complete block 14, 15 and 19.\n\nE. Prospective offerors shall be registered with Systems for Awards Management(SAM)with an active registration.","html":"<p>This solicitation has been reopened.</p>\n\n<p>another site visit has been scheduled for Friday February 14, 2025, at 10:00 AM. Please&nbsp;send the name of the personnel requesting to attend along with the name of the company they represent to lynn.hults@usda.gov by 3:00 PM02/13/2025.</p>\n\n<p></p>\n\n<p>The solicitation has been extended until 01/31/2025.&nbsp;</p>\n\n<p>A second site visit has been scheduled for 01/24/2025 at 10:00 AM CST. Please send the name of the personnel requesting to attend along with the name of the company they represent to lynn.hults@usda.gov by 3:00 PM 01/23/2025.</p>\n\n<p>The first site visit attendance list is now attached.</p>\n\n<p>@ additional Clauses required for insertion into this project.</p>\n\n<p>52.223-2&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reporting of Biobased Products Under Service and Construction&nbsp;Contracts&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;</p>\n\n<p>52.223-23&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Sustainable Products and Services</p>\n\n<p></p>\n\n<p>Questions and Answers</p>\n\n<p>Q1:&nbsp;Is the intent to apply Top Coat to the areas that have been repaired only, or to the entire exterior of <strong>Buildings 22, 26, 27 &amp; 29</strong> once the repairs are complete and those areas are primed.</p>\n\n<p>A1:&nbsp;Only the areas that are repaired under this contract.</p>\n\n<p>Q2:&nbsp;Can I use Mule-Hide PVC product as an accepted equal PVC product?</p>\n\n<p>A2: This appears to be equivelant and thus acceptable.</p>\n\n<p>Q3:&nbsp;What is the existing deck of the roof ?&nbsp; Concrete, Metal, etc. ? Is the Deck sloped ?&nbsp;</p>\n\n<p>A3: Rubber EPDM rubber. Its is slopped to the north from half way of the building and slopped to the south from half way of the building.&nbsp;&nbsp;The Building in question is a double wide modular structure.&nbsp; Whatever is the industry standard for this type of building is what I would assume this deck is made of.&nbsp; &nbsp;The deck is presently sloped, but that could very well have been accomplished with the ISO board insulation.</p>\n\n<p>Q4:&nbsp;Where will there be a staging area inside the fenced area or outside ?</p>\n\n<p>A4:&nbsp;Yes there is a large open lay down area inside the fence, also outside the fence if they want to use outside area.</p>\n\n<p>Q5:&nbsp;Will power be provided by the USDA or will the contractor have to supply a generator ?</p>\n\n<p>A5:&nbsp;We can supply power with just a had full of 15 amp, 120 volt. Larger loads 220 volt and 20 amp 120 volt would be easier with contractor supplied generator.</p>\n\n<p></p>\n\n<p>A. Project Title: Replacement of Roofing and Siding; and painting of Building 42, USDA, ARS Facility in Starkville, MS.</p>\n\n<p>B. Competition is set aside for Small Businesses. Applicable NAICS code is 238160 Roofing Contractors.</p>\n\n<p>C. In accordance with Federal Acquisition Regulation (FAR) 36.204 the magnitude of this construction project is between $100,000 and $250,000.</p>\n\n<p>D. Prospective offerors shall complete block 14, 15 and 19.</p>\n\n<p>E. Prospective offerors shall be registered with Systems for Awards Management(SAM)with an active registration.</p>","origin":"detail"},"contacts":[{"name":"Lynn Hults","role":"primary","email":"lynn.hults@usda.gov","phone":"9124649723"}],"place_of_performance":{"zip":"39759","city":{"code":"70240","name":"Starkville"},"state":{"code":"MS","name":"Mississippi"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"38776","city":"STONEVILLE","state":"MS","country":"USA"},"naics_codes":["238160"],"award":null,"attachments":[{"resource_id":"9440e589f2d84a9fb26235044d931639","name":"Attachment 4 ARS-372.pdf","kind":"file","mime_type":".pdf","size_bytes":30319,"posted_at":"2024-12-18T14:21:24.311Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9440e589f2d84a9fb26235044d931639/download","mirrored":false},{"resource_id":"fc3725e3f3e448a6a0b741968811421c","name":"Attachment 3 - ARS-371.pdf","kind":"file","mime_type":".pdf","size_bytes":52909,"posted_at":"2024-12-18T14:21:24.311Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fc3725e3f3e448a6a0b741968811421c/download","mirrored":false},{"resource_id":"77b5721a15334cf499e7f222f0637268","name":"12405B25R0009.pdf","kind":"file","mime_type":".pdf","size_bytes":102505,"posted_at":"2024-12-18T14:21:24.311Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/77b5721a15334cf499e7f222f0637268/download","mirrored":false},{"resource_id":"fffc002926d7427abd4837fcd8078bf2","name":"Wage Rates.pdf","kind":"file","mime_type":".pdf","size_bytes":71080,"posted_at":"2024-12-18T14:21:24.311Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fffc002926d7427abd4837fcd8078bf2/download","mirrored":false},{"resource_id":"f88db2996f76441f95946fd73aa1018d","name":"Solicitation 12405B25R0009.docx","kind":"file","mime_type":".docx","size_bytes":87252,"posted_at":"2024-12-18T14:21:24.311Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f88db2996f76441f95946fd73aa1018d/download","mirrored":false},{"resource_id":"fe81fed58bd94f1285bed29bdbb47522","name":"SOW MS State B-42 Roof Siding 2024 Updated.docx","kind":"file","mime_type":".docx","size_bytes":2282691,"posted_at":"2024-12-18T14:21:24.311Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fe81fed58bd94f1285bed29bdbb47522/download","mirrored":false},{"resource_id":"d9bbcea216054396a2d8ab5c2b3390a1","name":"sitevisit01_08_25.pdf","kind":"file","mime_type":".pdf","size_bytes":314655,"posted_at":"2025-01-16T19:15:05.924Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d9bbcea216054396a2d8ab5c2b3390a1/download","mirrored":false},{"resource_id":"88237007ed7246128f58937cc3a225ef","name":"Solicitation 12405B25R0009.docx","kind":"file","mime_type":".docx","size_bytes":86625,"posted_at":"2025-02-11T13:15:09.914Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/88237007ed7246128f58937cc3a225ef/download","mirrored":false},{"resource_id":"deb3be7123844308a3d949d7df3c1a3f","name":"signinsheet01_24_25.pdf","kind":"file","mime_type":".pdf","size_bytes":225037,"posted_at":"2025-02-11T13:15:09.914Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/deb3be7123844308a3d949d7df3c1a3f/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_12405B25C0004_12H2_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_12405B25C0004_12H2_-NONE-_-NONE-/","piid":"12405B25C0004","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"TM4THMXJZX97","recipient_name":"SIEVERDING CONSTRUCTION, INC.","recipient_uei":"TM4THMXJZX97","recipient_cage":"9GJL2","recipient_city":"MANDEVILLE","recipient_state":"LA","sub_name":"Agricultural Research Service","office_name":"USDA ARS SEA AAO ACQ/PER PROP","office_key":"o-12405B","first_action_date":"2025-03-06","last_action_date":"2025-09-02","actions":4,"obligated":"106576.00","current_total_value":"106576.00","potential_total_value":"106576.00","naics":"238160","psc":"Z1DB","extent_competed":"COMPETED UNDER SAP","set_aside":"SMALL BUSINESS SET ASIDE - TOTAL","offers_received":24,"description":"REPLACEMENT OF ROOFING, SIDING, AND PAINTING OF BUILDING NUMBER 42 AT POULTRY LAB","method":"piid","confidence":"high","evidence":["award number 12405B25C0004 equals the contract number","same awarding office 12405B"],"opportunity_key":null,"opportunity_title":null}],"related":[],"similar_open":[{"key":"SP470327Q0006","latest_notice_id":"cff3c7867386430c9e3932e1f5256e17","title":"DSCR Building 70 Roof Replacement","solicitation_number":"SP470327Q0006","notice_type":"p","first_type":"p","first_posted":"2026-11-18","last_posted":"2026-11-23","notices":2,"due_at":"2026-11-26T04:59:00Z","due_date":"2026-11-25","closes_at":"2026-11-26T04:59:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SP4703","office_name":"DCSO RICHMOND DIVISION #1","naics":"238160","psc":"Z2AA","set_aside":"SBA","state":"VA","county":"51760","county_name":"City of Richmond","city":"5167000","city_name":"Richmond","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"15B50127PR000024","latest_notice_id":"8d93258359d84f939b0db4192d6c7e53","title":"FCI Bastrop - Remove and Replace Housing Unit Roofs (10) 27Z5BB3","solicitation_number":"15B50127PR000024","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-11-30T19:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-015","dept_name":"JUSTICE, DEPARTMENT OF","sub_key":"s-1540","sub_name":"FEDERAL PRISON SYSTEM / BUREAU OF PRISONS","office_key":"o-15BFA0","office_name":"FAO","naics":"238160","psc":"Z2FF","set_aside":null,"state":"TX","county":"48021","county_name":"Bastrop County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"1240LT27Q0003","latest_notice_id":"af34b449094844d6a983249225d53185","title":"GAOA Mesa Falls VC Roof Repairs in Caribou-Targhee National Forest, Idaho","solicitation_number":"1240LT27Q0003","notice_type":"k","first_type":"k","first_posted":"2026-10-07","last_posted":"2026-10-07","notices":1,"due_at":"2026-12-01T22:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-123187","office_name":"USDA FOREST SERVICE","naics":"238160","psc":"Z2AZ","set_aside":"SBA","state":"ID","county":"16019","county_name":"Bonneville County","city":"1639700","city_name":"Idaho Falls","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Caribou-Targhee National Forest","site_key":"caribou-targhee-national-forest-id","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-08T03:46:32.887903Z"}],"similar_open_total":10,"indexable":false}