Solicitation, total small business set-aside
Arizona Forest Engineering and Road Maintenance (FERM)
12363N23Q4021
Forest Service, Usda-Fs, Stewardship Contracting Branch. Highway, Street, and Bridge Construction.
Awarded
$0.00 obligated so far on USAspending
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one was awarded in 2023
36 like it are open now in highway, street, and bridge construction
- AL-WHEELER NWR-WATERMAN GATE
Departmental Offices, FWS Contracting Activity
SolicitationNAICS 237310Ship to the buyer140FF027Q0077Due tomorrowNov 27 - W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation
Department of the Army, W07V Endist Rock Island
Presolicitation8(a)NAICS 237310MichiganW912EK27BA003Due in 4 daysNov 30 - NPS Repair or Alteration of Highways, Roads, Streets, Trails and Bridges Multip
Departmental Offices, National Park Service Contracting Activity
Sources soughtNAICS 237310Not tied to one place140PP027R0017Due in 4 daysNov 30
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. Open Small business opportunities
- How it ended
- Awarded to Cutting Edge Contractors Inc. on April 30, 2024, 477 days after offers were due.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
PROJECT DESCRIPTION: Arizona Forest Engineering and Road Maintenance (FERM) Blanket Purchase Agreement
Typical Service Activities
Road Maintenance service types of work will consist of routine work necessary to maintain the National Forest Road System in a functioning condition, providing safe public access and protecting the transportation facility investment and adjacent environmental resources.
Work is generally confined to within the limits of the existing traveled way and adjacent ditches, shoulders and cut/fill slopes. Work may also take place under or adjacent to the traveled way for resource protection, road stabilization, or to maintain traffic flow.
Potential Performance Activities: Sign Maintenance; Work Area Management (traffic control); Bridge maintenance; Surface Maintenance (Blading, Compaction, Watering); Drainage Maintenance (Slide & Slough Removal, Ditch Cleaning, Culvert Inlet/Outlet Cleaning, Cross-drain installation and maintenance, Ditch and Catch Basin Buttressing), Shoulder maintenance, Fill slope Armoring, Hazard Removal (Danger Tree Falling, Rock Fall and Debris Removal, etc.); Vegetation Management (seeding, brushing requirements); Bridge, guardrail, and Cattle guard Maintenance; Road Closure Device Maintenance or Construction, Rock Crushing and Stockpiling; Placement of Spot Rock; Dust Abatement; Minor Flood Repair and Water Diversion, and Road Demolition. Burned Area Emergency Response (BAER), Fire Suppression Rehabilitation, and Stream Restoration. Other complex systems may be within the scope to support road maintenance and restoration activities. Log out and mobilization costs are incidental to ordered work unless otherwise specified in the call order. This also includes trailheads, campgrounds, and other facility related roadwork.
Typical Construction Activities
Road construction types of work will consist of all construction activities normally associated with new road construction or reconstruction, but will be limited in scale, size, and complexity.
Work is generally confined to within the limits of the existing traveled way and adjacent ditches, shoulders and cut/fill slopes, or under the road prism for stream crossing improvements or road stabilization.
Possible Performance Activities: Surveying/Staking of Work Activities, signing (traffic control and new sign installation); Clearing; Earthwork and realignment; Drainage (surface, subsurface, drain dips, corrugated metal pipe, under drains, etc.); Aquatic Passage Work activities (small bridges or prefabricated structures, etc.); Aggregate Placement (base, surface, pit-run, riprap, etc.); Erosion Control (some erosion control such as seeding may be a service work activity; Shoulder, cut and fill slope reconstruction; Asphalt Placement, Asphalt Restoration (grinding, overlays, pothole patching, skin patching, crack sealing, chip sealing (some activities may be service work activity for supply/install), etc.); Cut/Fill Slope Stabilization; Aquatic Passage Construction; Cattle guard Installation; Installing Closure Devices (gates, earthen barriers, guardrails, etc.); Fence and Gate construction. Burned Area Emergency Response (BAER), Fire Suppression Rehabilitation, Stream Restoration, and specialty projects may also be included, such as recreation facility enhancements (campground road/trail work, toilet installation, parking lot and boat launch repairs, etc.). Other complex systems may be within the scope to support road maintenance and restoration activities. Emergency road repairs may require snowplowing for access, but in general, snowplowing is not part of this contract. Log out and mobilization costs are incidental to ordered work unless otherwise specified in the call order. This also includes trailheads, campgrounds, and other facility related roadwork.
PROJECT LOCATION: Projects shall covers the state of Arizona including the following forests; Apache-Sitgreaves, Coconino, Coronado, Kaibab, Prescott, and Tonto. The terrain varies and can have moderate hills on some areas and steep grades in others. Soil conditions vary as well, from soft and sandy to compacted and rocky. A general vicinity map will be included with all call orders. Maps will also be available to assist in locating the individual roads and are available for purchase.
Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around January 15, 2023. Engineering point of contact is Armando De La Cruz, telephone: (505) 842-3859. NAICS 237310 with size standard $39.5 mil. This project is set aside 100% for small business.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 840-2 INSTALL.pdf447 KB, December 9, 2022
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Cutting Edge Contractors Inc.
- UEI
- DJ6LV9SLBLL1
- CAGE
- 7M8V2
- Vendor location
- Las Vegas, NV
- Contract
- 12363N24A4205
- Obligated
- $0.00, potential $50,000,000
- Actions
- 1 between April 30, 2024 and April 30, 2024
- Described as
- Arizona Forest Engineering and Road Maintenance (Ferm) Blanket Purchase Agreement
- Match
- solicitation number 12363N23Q4021 equals the FPDS solicitation identifier; same awarding office 12363N (high confidence)
- Record
- USAspending award page
- Recipient
- Proline Contracting LLC
- UEI
- VU8KGRHJFCA7
- CAGE
- 9J7R1
- Vendor location
- Mesa, AZ
- Contract
- 12363N24A4247
- Obligated
- $0.00, potential $50,000,000
- Actions
- 1 between July 16, 2024 and July 16, 2024
- Described as
- Arizona Forest Engineering and Road Maintenance (Ferm) Blanket Purchase Agreement
- Match
- solicitation number 12363N23Q4021 equals the FPDS solicitation identifier; same awarding office 12363N (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 7, 2025
Solicitation
Due January 9, 2023 at 7:30 PM EST. SAM.gov, notice 69249d7624594a0b9c9db96377e6122d
9 revisions on SAM
- January 15, 2026: publish, solicitation
- April 11, 2025: publish, solicitation
- March 7, 2025: publish, solicitation
- October 20, 2023: publish, solicitation
- October 20, 2023: publish, solicitation
- February 13, 2023: publish, solicitation
- January 4, 2023: publish, solicitation
- November 30, 2022: publish, presolicitation
- December 9, 2022: publish, solicitation
April 11, 2025
Solicitation
Due January 9, 2023 at 7:30 PM EST. SAM.gov, notice 21d6f580871d4f59a5a7215380f68c7b
9 revisions on SAM
- January 15, 2026: publish, solicitation
- April 11, 2025: publish, solicitation
- March 7, 2025: publish, solicitation
- October 20, 2023: publish, solicitation
- October 20, 2023: publish, solicitation
- February 13, 2023: publish, solicitation
- January 4, 2023: publish, solicitation
- November 30, 2022: publish, presolicitation
- December 9, 2022: publish, solicitation
January 15, 2026
Solicitation
Due January 9, 2023 at 7:30 PM EST. SAM.gov, notice b4665bce509a4752a539610e2ebdaf57
9 revisions on SAM
- January 15, 2026: publish, solicitation
- April 11, 2025: publish, solicitation
- March 7, 2025: publish, solicitation
- October 20, 2023: publish, solicitation
- October 20, 2023: publish, solicitation
- February 13, 2023: publish, solicitation
- January 4, 2023: publish, solicitation
- November 30, 2022: publish, presolicitation
- December 9, 2022: publish, solicitation
Points of contact
- Chad A.T. Bullockchad.bullock@usda.gov3853685300
- Jim Kaminskijames.kaminski@usda.gov5734538424