Presolicitation
Crystal Lakes Work Center Waterline Improvements
1153530
Forest Service, USDA Forest Service-Spoc Im. Water and Sewer Line and Related Structures Construction.
Response deadline
July 16, 2025 at 11:00 AM EDT
Closed 497 days ago. Posted June 16, 2025. Scheduled to archive August 15, 2025.
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one closed in 2025
25 like it are open now in water and sewer line and related structures construction
- SOUTH FORK BUNKHOUSE WELL ABANDONMENT PROJECT
Forest Service, USDA Forest Service-Spoc Im
Combined synopsis and solicitationNAICS 237110South Fork, CO1240LT27Q0032Closes in 14 daysDec 9 - HAVO 326181 Rehabilitate Rainshed&Water Treatment
National Park Service, DSC Contracting Services Division
SolicitationNAICS 237110Hawaii140P2026R0091Due in 3 daysNov 28 - New Meadows Range Barn
Forest Service, Payette National Forest
Combined synopsis and solicitationSmall businessNAICS 237110Idaho1240LT27Q0027Due in 4 daysNov 29
All 25 open in water and sewer line and related structures construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237110 (water and sewer line and related structures construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the presolicitation of June 16, 2025. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
PROJECT: Crystal Lakes Waterline Improvements
*********READ the Pre-Soliciation Notice /Synopsis in its entirey. This document is located in the Attachments/Links. Details for the Site Visit scheduled for July 2025 are included in the Pre-solicitation/Synopsis. ****************
Description of Work: The SOW (Statement of Work) will be posted with the upcoming anticipated Solicitation.
The work generally consists of the following:
A. Perform all requirements (including producing a Subsurface Utility Engineering (SUE)) to attain a permit from the Colorado Department of Transportation to bore a 2-inch HDPE (SDR-11) waterline under Colorado HWY 24.
B. Install approximately 900 feet of 2-inch SDR11 HDPE water pipe from the basement of Dwelling 1 to the existing 2-inch schedule 40 PVC water distribution system located on the East side of HWY 24.
C. Install necessary pipe and fittings including valves and adapters to connect to the existing water treatment system located in the basement of DWELLING 1 on the West Side of HWY 24.
D. Install necessary pipe and fittings including a tee, curb stops, and adapters to connect to the existing water distribution system located on the East Side of HWY 24.
E. The water distribution system shall be installed at a minimum depth of 10 feet below grade.
F. Removal of existing well pump and installation of a new Well pump to attain 15 GPM supply
flowrate to Dwelling 1.
G. Connect well pump to existing electrical supply and control panel, provide level sensor in water storage tank to energize well pump on and off.
H. Decommission well on East side of Highway in accordance with State of Colorado regulations.
I. Decommission and abandon pressure tank and water distribution system from the well located on the East side of Colorado HWY 24.
J. Perform a static pressure test and disinfection of new infrastructure per specification requirements.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Presolicitation Notice _Crystal Lakes Work Center Waterline Improvements.pdf131 KB, June 16, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 16, 2025
Presolicitation
Due July 16, 2025 at 11:00 AM EDT. SAM.gov, notice 2947b8a84ac34ab3b3b6cbbf790392e8
2 revisions on SAM
- June 16, 2025: publish, presolicitation
- July 1, 2025: publish, solicitation
Points of contact
- Janice Kingjanice.king@usda.gov