Special notice, service-disabled veteran-owned small business set-aside
Name Brand AMSCO 400 Steam Sterilizer
Department of Veterans Affairs, 255-Network Contract Office 15. Electromedical and Electrotherapeutic Apparatus Manufacturing.
Response deadline
May 16, 2025 at 12:00 PM EDT
Closed 559 days ago. Posted May 9, 2025. Scheduled to archive May 31, 2025.
Get the next one like this from Department of Veterans Affairs by email, the day it is posted.Find my opportunities
This one closed in 2025
11 like it are open now in electromedical and electrotherapeutic apparatus manufacturing
- NCSS - Sentec tCOM+ Transcutaneous CO2 Monitor Acq
National Institutes of Health, National Institutes of Health Olao
Combined synopsis and solicitationNAICS 334510Ship to the buyer75N98027Q00094Due tomorrowNov 27 - Medtronic FT10 Series Cauterizer
Department of Veterans Affairs, Network Contract Office 23
Combined synopsis and solicitationSDVOSBNAICS 334510Ship to Fargo, ND36C26327Q0131Due in 4 daysNov 30 - FY27 Mobile CT Scanner Lease
Department of Veterans Affairs, 248-Network Contract Office 8
Combined synopsis and solicitationNAICS 334510Orlando, FL36C24827Q0085Due in 4 daysNov 30
All 11 open in electromedical and electrotherapeutic apparatus manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
- Who may compete
- Service-disabled veteran-owned small business set-aside. Reserved for service-disabled veteran-owned small businesses. Small, under NAICS 334510 (electromedical and electrotherapeutic apparatus manufacturing), means no more than 1,250 employees, counted with affiliates. Open SDVOSB opportunities
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
1. Introduction
This is a solicitation to provide the Robert J Dole VA Medical Center’s SPS department with a new Prevac Steam Sterilizer.
2. Scope of Work
The contractor shall deliver and perform certified installation and de-installation of the steam sterilizer. The contractor will provide all necessary materials, hardware, and attachments to ensure the steam sterilizer is fully functional and operational for use.
3. Technical Requirements
Item #
Description
QTY
Unit
1
AMSCO 400 26x37.5x48 Prevacuum Single Hinge Recessed, 1-Wall Lh Steam 20/V/240V – MFR# SR2222211011
1
EA
2
Deinstallation – Medium Sterilizers – MFR# SE6018521
1
EA
3
Install – Medium Sterilizer – MFR# SE601852
1
EA
4
Trade in STERIS Sterilizer
1
EA
- Salient Features
- Stainless Steel
- Manual Single Hinge Door Recessed
- Interior Dimensions: 26 x 37.5 x 48” (660 x 950 x 1220mm)
- Overall Size: 44” x 70” x 75.25”
- Electrical: 120V, 2A, 1-Phase
- Vacuum Pump:
- 208/240V, 6A, 3-Phase, or;
- 480V, 3A, 3-Phase
- Touch-Sensitive Screen
- Thermal Printer
- 12 Programmable Cycles
- Customizable Cycle Options
- Process up to 15, 25lb Trays
- Technical Requirements
- Compatibility with Censis ConnectAssure. This program is required for sterilizer documentation. Inability to document sterilizer cycles for instrumentation if not compatible.
- Ability to fit in current footprint to include plumbing connections, electrical connections, and physical layout of room.
- Ability to change or adjust sterilization cycles and values at point-of-use to meet instrument manufacturer instructions for use, beyond sterilizer manufacturer pre-set cycles.
- Compatibility with 3M Comply SteriGage Steam Chemical Integrator (Class 5 Chemical Indicator)
- Compatibility with 3M Attest Super Rapid Readout Biological Indicator System
4. Security Requirements
The C&A requirements do not apply, and a Security Accreditation Package is not required
5. Work Hours
Normal hours of operation are Monday through Friday, (to include weekends) 8:00 a.m. to 4:30 p.m. Central Standard Time, excluding Federal holidays.
6. Robert J Dole VA Medical Center Point of Contact (POC)
To be determined upon award.
7. Installation and Cleanup
- Contractor will be responsible for installation of the new sterilizer and de-installation of the old sterilizer.
- Contractor will perform quality checks after installation of the new sterilizer.
- Contractor representatives must check in with the station’s POC and or SPS Assistant Chief when they arrive on-site and check out upon completion of work each day.
- Contractor on-site visits shall be coordinated with the station’s POC and/or SPS Assistant Chief before being scheduled or conducted.
- Contractor staff shall always be professional and shall take all necessary precautions to maintain a safe environment for the occupants. This includes, as necessary, coordinating access and closures for sensitive areas of the Medical Center.
- Contractor shall be responsible for cleaning all work areas after completion of tasks. This includes, but is not limited to, removal of packaging and a clean sweep/mop of the area as required by work type.
- Contractor shall protect all items from damage. The Contractor shall take precaution against damage to the building(s), grounds, and furnishings. The Contractor shall repair or replace any items related to building(s) or grounds damaged accidentally or on purpose due to actions by the Contractor.
- The Contractor shall perform an inspection of the building(s) and grounds with the station’s POC and/or the SPS Assistant Chief prior to commencing work to ensure that the Contractor shall be able to repair or replace any items, components, building(s) or grounds damaged due to negligence and/or actions taken by the Contractor. The source of all repairs beyond simple surface cleaning is the facility construction Contractor (or appropriate subcontractor), so that building warranty is maintained. Concurrence from the VA Facilities Management POC and station’s POC is required before the Contractor may perform any significant repair work. In all cases, repairs shall utilize materials of the same quality, size, texture, grade, and color to match the adjacent existing work.
- The Contractor shall be responsible for security of the areas in which the work is being performed prior to completion.
8. Warranty and Maintenance Service
- The warranty shall include the following: the system, all accessories, and all software shall be covered under the manufacturer’s warranty and shall include all parts and labor.
- The warranty period shall not begin until after the station’s POC or SPS Assistant Chief has accepted the products delivery, installation, and functionality.
- A manufacturer’s factory-trained Field Service Engineer shall perform installation and corrective and preventative maintenance during the warranty period.
- The contractor shall provide documentation of all work completed (corrective maintenance, preventive maintenance, software updates, etc.) within 3 business days of completion to the contracting officer’s representative or SPS Assistant Chief.
- At a minimum, documentation must include equipment serial numbers, work completed, date completed, company name, and name and signature of the technician who completed the work.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- J and A Signed_Redacted.pdf530 KB, May 9, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 9, 2025
Special notice
Due May 16, 2025 at 12:00 PM EDT. SAM.gov, notice 0a67b79942784c8687d5f2af89d7abe8
1 revision on SAM
- May 9, 2025: publish, special notice
Points of contact
- Rosene, Corycory.rosene@va.gov
- Jonathan J Lutmerjonathan.lutmer@va.gov