Special notice
3389 LCHD-ESS Special Notice - Draft Specification
Department of the Army, W2SD Endist Philadelphia. Ship Building and Repairing.
Response deadline
December 31, 2025 at 5:00 PM EST
Closed 331 days ago. Posted December 31, 2025, first published October 15, 2025. Scheduled to archive January 15, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
107 like it are open now in ship building and repairing
- USNS CITY OF BISMARCK (T-EPF 9) VRA KR
Department of the Navy, NAVSUP FLT Log CTR Yokosuka
SolicitationNAICS 336611Outside the USN6264927RK003Due todayNov 27 - Ship Repair
Department of the Navy, NAVSUP FLC Sigonella Naples Office
SolicitationNAICS 336611Outside the USN6817127QN013Due todayNov 27 - WATCH SUPV CHAIR
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 336611Ship to the buyerN0010427QBB55Due todayNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
Description
As published on SAM.gov.
Throughout this draft specification, there are areas in which the USACE is trying to fully understand the ramifications of various requirements from a design and construction standpoint. In reviewing the draft specifications, please provide meaningful feedback regarding the risk, concerns, and/or conflicts with the following requirements throughout the specification:
- C004, C180, C201, C415, C427: ABS HAB(WB) Notation and Additional Requirements – The vessel will receive an ABS HAB(WB) notation; however, throughout the specification, there are additional requirements that the contractor shall adhere to deriving from the HAB+(WB) and HAB++(WB) requirements.
- C002, C121, C180: 7 knot current with 2 knot speed over ground
- C002, C121, C605, C606: 14 knot transit speed with hopper empty
- C165: Ship Motion accelerations are still being determined by field measurements on board the current dredge ESSAYONS. Any suggestions or concerns in mitigating ship motion accelerations within the design approach within the area of operation of this vessel?
- C002, C201: Berthing Requirements – The USACE operates above the minimum manning requirements for a vessel. How would increased berthing requirements affect the design and construction of the vessel?
- Business Related Concerns to insight competition (i.e. stipend, bonding, Economic Price Adjustment, Period of Performance, etc.)?
- Are there any technical requirements that impacts the ability to utilize traditional hopper dredge design and construction?
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 3389 LCHD-ESS Section M - OCT2025.docx79 KB, October 15, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 15, 2025
Special notice
Due December 31, 2025 at 5:00 PM EST. SAM.gov, notice 04b70c54448f4f4dbb2f7113669239e2
2 revisions on SAM
- December 31, 2025: publish, special notice
- October 15, 2025: publish, special notice
December 31, 2025
Special notice
Due December 31, 2025 at 5:00 PM EST. SAM.gov, notice 832b2ac4ec314ce68e3bfb5a212adf71
2 revisions on SAM
- December 31, 2025: publish, special notice
- October 15, 2025: publish, special notice
Points of contact
- Michael HunterMichael.J.Hunter@usace.army.mil
- Domenic SestitoDomenic.L.Sestito@usace.army.mil