Solicitation
Canon ProStream Press Installation Design Build
040ADV-26-R-0029
United States Government Publishing Office, Acquisition Services. Industrial Building Construction.
Response deadline
August 25, 2026 at 5:00 PM EDT
Closed 92 days ago. Posted July 15, 2026, first published July 9, 2026. Scheduled to archive September 30, 2026.
Get the next one like this from United States Government Publishing Office by email, the day it is posted.Find my opportunities
This one closed in 2026
6 like it are open now in industrial building construction
- Multiple Award Construction Contract (MACC)
Department of the Air Force, FA7060 11TH Contracting SQ PK
Sources soughtNAICS 236210District of ColumbiaFA706027RXXX2Due in 5 daysNov 30 - IE181 - WHS Greenhouse Construction
Bureau of Indian Affairs, Indian Education Acquisition Office
SolicitationIndian small businessNAICS 236210Fort Wingate, NM140A2327Q0297Due in 5 daysNov 30 - Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Department of the Air Force, FA8137 AFSC Pzioc
Closes in 8 daysDec 3
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236210 (industrial building construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 47 days from the day the solicitation was posted, July 9, 2026, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The Government Integrated Printing Services (GIPS) requires a design-build project to support the installation of a new printing press at the Government Publishing Office (GPO) main campus in Washington, DC. The installation site is on the fourth (4th) floor of Building C.
The contractor will perform A/E design services and construction services to make the building compatible with the recently acquired Canon ProStream 2133 Printing Press. The Press consists of two main components: (1) the press itself, which will be placed on the production floor, and (2) a cooling unit, which will be placed at a location to be determined (TBD) by the contractor.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Attachment J-8 DBA Wage Determination Washington DC.pdf365 KB, July 9, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 9, 2026
Solicitation
Due August 25, 2026 at 5:00 PM EDT. SAM.gov, notice 20dcb747f0524f22a562581fec16b636
2 revisions on SAM
- July 15, 2026: publish, solicitation
- July 9, 2026: publish, solicitation
July 15, 2026
Solicitation
Due August 25, 2026 at 5:00 PM EDT. SAM.gov, notice b3bd3665202b4f069bb03238eeb9e6db
3 revisions on SAM
- July 30, 2026: publish, special notice
- July 15, 2026: publish, solicitation
- July 9, 2026: publish, solicitation
Points of contact
- Troy D. Whitetwhite@gpo.gov
- Gary Stevensgstevens@gpo.gov