- Solicitation number: 040ADV-25-R-0012
- Notice type: Combined synopsis and solicitation
- Status: Closed. Deadline was April 18, 2025 at 5:00 PM EDT
- Department: United States Government Publishing Office
- Contracting office: Acquisition Services (040ADV)
- NAICS: 49311 General Warehousing and Storage
- Product or service code: 8145 Specialized Shipping and Storage Containers
- Place of performance: Pueblo, Colorado
- Who can bid, by location: Anywhere in the US. Location does not limit who can bid: a product shipped to the buyer, research at the performer's facility, or work at the contractor's site. A state shown is the delivery point.
- County: Pueblo County (FIPS 08101). https://sealedbidder.com/counties/pueblo-county-co-08101
- City: Pueblo. https://sealedbidder.com/cities/pueblo-co-0862000
- First posted: March 28, 2025
- Last posted: April 8, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/039f0bf7077d45c687fbabba63e8b233/view

## Reading this notice

- Kind of notice: Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses.
- Time to respond: Bidders had 21 days from the day the solicitation was posted, March 28, 2025, to the deadline.

## Description

Amendmnet 0001 is to provide responses to questions and provide additional drawings.

The purpose of this solicitation is to is to furnish the U.S. Government Publishing Office (GPO) with a Pueblo warehouse

racking system designed for the storage of finished materials on pallets. The Contractor is responsible for

delivering a comprehensive floor layout and design for the storage racks that optimizes storage capacity. The

GPO requires the installation of the pallet racking storage system at the designated site in Pueblo, CO. The

Contractor shall provide a fully integrated, turn-key solution that meets the requirements specified herein and

complies with the solicitation's outlined specifications and timelines. The products, supplies and services must

be placed against the contract in accordance with the Materials Management Acquisition Regulation (MMAR).

The Contractor is responsible for delivering a comprehensive design for the storage racks that optimizes storage capacity. The GPO requires the installation of the pallet racking storage system at the designated site in Pueblo, CO. The Contractor shall provide a fully integrated, turn-key solution that adheres to the requirements specified herein and complies with the solicitation's outlined specifications and timelines.

C.2.1 The Contractor shall:

a. Supply and install a warehouse racking system in accordance with design based on the layout

provided in (attachment J.3), which conforms to or exceeds stated requirements outlined in the

following sections and subsections.

b. Provide the required installation, interconnection, and integration.

c. Provide definitions of all external utility requirements.

d. Deliver and rig all equipment to the site.

e. Provide required training (if applicable based on design).

f. Meet Performance Testing Criteria (reference section C.2.3.3)

g. Provide warranty for 1 year on parts and labor.

h. Provide for telephone support within 24 hours of contact by GPO&rsquo;s maintenance contractor

regarding maintenance (if applicable based on design).

## Attachments

- [05. J.1 Price Template.xlsx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/30a53d7c728a40b08495c4d872145e32/download)
- [09. Attachment J.3 Pueblo Floor Plan.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/915ae175f1434d0da224c3aeb307fc71/download)
- [040ADV-25-R-0012_final 03 28 25.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fd74c7eaec664057b402869dd509838e/download)
- [Cover Letter final 03 28 25.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4abe5eaa265440568f4e27de5aa64a62/download)
- [J5. Electrical Drawing.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d8db492019f24a789c6d7ce87adb4c52/download)
- [J4. Pueblo Warehouse Drawing.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/28bb85e2e64e4a12ab67bf6e6b92a6a2/download)
- [040ADV-25-R-0012-C0001 CO signed 04 08 25.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1dc7b62cd5244277b3d327c312b71984/download)

## Open now in the same industry

1 open in NAICS 49311.

- Government Owned Contractor Operated Fuel Storage Facility at DFSP Tampa, FL (SPE60326R0518), due November 30, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/spe60326r0518

## Publications

- March 28, 2025: Combined synopsis and solicitation, due April 18, 2025 at 5:00 PM EDT. Notice 2e0f5cb53a904437a7fdaa627dabfc3e. https://sam.gov/workspace/contract/opp/2e0f5cb53a904437a7fdaa627dabfc3e/view
- April 8, 2025: Combined synopsis and solicitation, due April 18, 2025 at 5:00 PM EDT. Notice 039f0bf7077d45c687fbabba63e8b233. https://sam.gov/workspace/contract/opp/039f0bf7077d45c687fbabba63e8b233/view

## Points of contact

- Marcus Moses, mmoses@gpo.gov
- Nataliya Holl, nholl@gpo.gov

---